Hello IT Professionals
Hope you all are doing great.

Please go through the below position and send me your Consultant updated
Resume.

Please send Resumes on e...@bettermindsconsulting.com<e...@panzersolutions.com>

Position: Sharepoint Consultant
Location: Columbus, OH
Duration: 6-12 Months

*Required Skills:*
SharePoint 2010
Infopath 2010
Visual C#
Visual Studio 2010
SQL 2008

Highly Desired:
Nintex Workflows
Knowledege Lake
VB 6

The candidate will be asked to design, program, and implement necessary
changes to  existing Coal Permitting system.
Changes include modifying current system and adding functionality to
complete process. Possibility project could extend beyond schedule.

The candidate will be working on a project to complete the migration from
the Central Tracking System (CTS) to the Electronic Permitting System
(EPS).
The migration includes the creation of new and existing reports, forms, and
processes.
The EPS currently ends at the approval of the application, but before the
applications are issued.
The candidate will work with the IT staff and business users to complete
the technical design, programming, and implementation of the design to take
the coal permitting applications from approval to issuance.

Seeking an IT Software Developer that has experience creating and
customizing InfoPath forms in a SharePoint 2010 environment, creating SQL
Reporting Server reports in an SharePoint 2010 or MS SQL 2008 R2
environment, along with Nintex Workflow experience, Visual Studio 2010 C#,
and a MS TFS environment.
Experience with KnowledgeLake Imaging and VBA would be of benefit to the
role.
This role will be a hands-on lead worker/architect for the design and
development of the next phase of the Electronic Permitting System (EPS).

The project will complete the migration of reports from CTS, an application
consisting of an MS Access 2000 front end with a MS SQL 2008 backend, to
EPS, which is a custom SharePoint based InfoPath application utilizing
Nintex Workflow, KnowledgeLake imaging, and C# custom code, while
incorporating the business processes that take coal permitting applications
from Approval to Issuance.

Project Scope
In Scope:
1.      Replace CTS Reports that are utilized in the application
completeness, approval, and issuance processes
2.      Electronic submission of the Mine Plan Summary
3.      Electronic creation of Performance Security Estimate
4.      PS (Performance Security) option letter created by the system
5.      Notice of Election letter created by the system
6.      Completeness, Approval and Issuance Checklist functionality
7.      Permit Written Findings captured in the system and reported from
the system
8.      List maintenance
9.      CHIA
10.  View of Civil Penalty

11.  Bonding
a.      Create Invoice
b.      Receipt for Bond

12.  Informal Conference – limited tracking
a.      Letters - included in this phase
b.      Attendance
c.      Who submitted written comments

Kindest Regards,
Eric Hoffman - Technical Recruiter
Better Minds Consulting, LLC
Direct: 412-212-3041
Email: e...@bettermindsconsulting.com

-- 
You received this message because you are subscribed to the Google Groups "SAP 
ABAP" group.
To post to this group, send email to sap-abap@googlegroups.com.
To unsubscribe from this group, send email to 
sap-abap+unsubscr...@googlegroups.com.
Visit this group at http://groups.google.com/group/sap-abap?hl=en.
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to