Dear Partner, Hope you are doing well.
Please find the PM based in NY. Kindly send me profile of candidates for this role ASAP. *Location: **Endicott, NY* *Visa: Green card ,Citizens* *Rate:55 to 65 if higher as well we can try.* Program Manager with software experience with PMP 1- Schedule: Identify the detailed schedule for each Software (SW) build, with an associated functional content definition that is consistent with Bombardier and BAe’s SW build definition Confirm detailed schedule for Hardware (HW) development and delivery. Schedules should also provide some type of PERT chart Verify processes in place to track the current schedule against a baseline and identify/justify changes to the schedule Confirm that the schedule takes into consideration the CIRD delivery dates and a realistic allowance for the CIRD reviews that are required internal to RCI and with BA/PH Insure a phase gate process in alignment with Gx schedules is in place and being enforced. Identify if an earned value system is employed Check cycle time for defining requirements, design, coding and testing; comparison with cycle time of other suppliers for similar equipment and opportunities to improve schedule Confirm adequacy in the number of test facilities for SW and FW verification and qualification 2- Resources: Identify the level of resources planned and evolution over time of resources actually allocated to the project. Identify resource skill set needs needed, and adequacy of skill set of personnel assigned to the project based on rework, schedule deliverables Insure processes in place to detect inadequate level of resources or skill set and make the necessary corrections 3- Change control: Check the configuration management plan and change control process for HW, SW and Firmware (FW) Identify the cycle time for making minor and more important SW changes during integration testing and during flight test Check for a Problem Reporting (PR) processes/system that integrates with the PH and BA problem reporting, for PRs raised during the BAe , box level testing, SIL integration and integration at BA on the eSIM/ ISTCR and to provide visibility on BAE’s PRs (BAE compliance to the PH FCS PR process). Need to confirm a closed loop problem reporting system in place. Confirm a SW development plan that takes into consideration the need for quick correction of problems that arise during testing; two parallel SW development teams would likely be required such that issues that come up during integration testing of a build can be corrected using “patches” to allow testing to progress, without stopping or affecting the development of the next build (with the “patches” eventually being re-integrated into the next main build) 4- Test planning: Confirm planning of the AFCU testing both by BAE and at PH and BA, and how the investigating of problems will occur (ownership, roles/responsibilities) Verify BAE plan to test the CIRD requirements . Check for support that will be provided by BAE to PH and BA for integration/testing of the AFCU on the PH SIL and BA CIASTA Identify on-target SW/FW testing versus on simulator Check risk reduction/mitigation testing for areas without a high maturity level Note: as a specific technical item, PH is concerned about the AFCU’s limited capabilities for internal data retrieval during testing, which could impact the duration of tests and problem investigation 5- Data: Agreement on data items and delivery status versus agreed to baseline confirmed 6- Software and SOI: Confirm mutual understanding between BA and BAE of SOF expectations for SW Verify checklists for the SOI audits (DO-178 and DO-254), for the different stages (understanding of expectations) – pre-audits by BA to be considered before involvement of the certification authorities 7- Compliance: Confirm checklists for audit per ARP 4754, DO178 and DO254. 8- Processes: QA process and QA audits are scheduled; infrastructure in place Development and verification processes/plans is proceeding Verify definition of the interfaces between the FBW and the AFCU 9- Regression Check for methodology to prevent need for FBW function system level re-verification when changes are made Verify design robustness, design meets requirements, sufficient growth and margin Verify requirements capture of BAE CIRD, Bombardier CLAWS, other Bombardier requirements and RC derived requirements Best Regards *Ravi Nigam* 978-558-4666 EXT 101 *TekNavigators* 8875 Hidden River Parkway Suite 300 Tampa, FL 33637 DISCLAIMER: This message and any attachments are solely for the use of the individual or entity to which it is addressed and may contain information that is privileged or confidential. If you are not the intended recipient, any disclosure, use or distribution of the information contained herein is prohibited. If you have received this communication in error, please notify the sender by reply e-mail and immediately delete this message and any attachments. You may reply and send an email with "Remove" in the subject line in order to discontinue communication. -- You received this message because you are subscribed to the Google Groups "SAP-UK" group. To unsubscribe from this group and stop receiving emails from it, send an email to sap-uk+unsubscr...@googlegroups.com. To post to this group, send email to sap-uk@googlegroups.com. Visit this group at http://groups.google.com/group/sap-uk. For more options, visit https://groups.google.com/d/optout.