[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-09-03 Thread Shwetha G S (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14119480#comment-14119480
 ] 

Shwetha G S commented on OOZIE-1581:


[~puru], thanks for checking this 
{quote}
And i think that is a correct behavior, rerunning of WF haven't triggered 
rerunning of coord action. Running for coord action does lot of other things 
beside submitting new WF like input dependency check, coord definition update ( 
if needed), delete output ( if needed). So it may not be correct to say coord 
action has rerun if we rerun WF.
{quote}
Isn't workflow re-run same as coord action re-run with no refresh, no 
cleanup(which are anyway options in coord action re-run)? Its just that it 
doesn't handle concurrency check, but nothing else changes.

Assuming that the workflow and coord action are killed initially, and the user 
re-runs the workflow, workflow moves to running state, but coord action remains 
in killed state. Finally, if the workflow succeeds, we change the coord action 
to succeeded(yes, we do this already). So, the coord action changes from killed 
to succeeded. So, my question is why not update the coord action status when 
workflow is running as well?

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: 4.1.0

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581-r6.patch, OOZIE-1581-r7.patch, 
 OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-09-02 Thread Purshotam Shah (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14118916#comment-14118916
 ] 

Purshotam Shah commented on OOZIE-1581:
---

This is how the whole framework is.
If we rerun a coord from a completed bundle, bundle status doesn't change. To 
change bundle status we have to rerun bundle with coord as param, then only 
bundle status will change.

Same as with WF and coord action. If we rerun a WF, coord action status 
shouldn't change.
And i think that is a correct behavior, rerunning of WF haven't triggered 
rerunning of coord action. Running for coord action does lot of other things 
beside submitting new WF like input dependency check, coord definition update ( 
if needed), delete output ( if needed). So it may not be correct to say coord 
action has rerun if we rerun WF.
 

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: 4.1.0

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581-r6.patch, OOZIE-1581-r7.patch, 
 OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-08-25 Thread Shwetha G S (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=14108996#comment-14108996
 ] 

Shwetha G S commented on OOZIE-1581:


In SignalXCommand:
{code}
// Changing to synchronous call from asynchronous queuing to prevent
// undue delay from between end of previous and start of next action
if (wfJob.getStatus() != WorkflowJob.Status.RUNNING
 wfJob.getStatus() != WorkflowJob.Status.SUSPENDED) {
// only for asynchronous actions, parent coord action's external id 
will
// persisted and following update will succeed.
updateParentIfNecessary(wfJob);
new WfEndXCommand(wfJob).call(); // To delete the WF temp dir
}
{code}
[~chitnis], why is there check on status while updating parent?

For the usecase where coord action and the workflow is killed, a re-run of the 
workflow moves the status to running, but coord action remains in killed state 
because of this?

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: 4.1.0

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581-r6.patch, OOZIE-1581-r7.patch, 
 OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.2#6252)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-01-16 Thread Rohini Palaniswamy (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13873761#comment-13873761
 ] 

Rohini Palaniswamy commented on OOZIE-1581:
---

+1

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581-r6.patch, OOZIE-1581-r7.patch, 
 OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-01-15 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13873100#comment-13873100
 ] 

Hadoop QA commented on OOZIE-1581:
--

Testing JIRA OOZIE-1581

Cleaning local git workspace



{color:green}+1 PATCH_APPLIES{color}
{color:green}+1 CLEAN{color}
{color:green}+1 RAW_PATCH_ANALYSIS{color}
.{color:green}+1{color} the patch does not introduce any @author tags
.{color:green}+1{color} the patch does not introduce any tabs
.{color:green}+1{color} the patch does not introduce any trailing spaces
.{color:green}+1{color} the patch does not introduce any line longer than 
132
.{color:green}+1{color} the patch does adds/modifies 13 testcase(s)
{color:green}+1 RAT{color}
.{color:green}+1{color} the patch does not seem to introduce new RAT 
warnings
{color:green}+1 JAVADOC{color}
.{color:green}+1{color} the patch does not seem to introduce new Javadoc 
warnings
{color:green}+1 COMPILE{color}
.{color:green}+1{color} HEAD compiles
.{color:green}+1{color} patch compiles
.{color:green}+1{color} the patch does not seem to introduce new javac 
warnings
{color:green}+1 BACKWARDS_COMPATIBILITY{color}
.{color:green}+1{color} the patch does not change any JPA 
Entity/Colum/Basic/Lob/Transient annotations
.{color:green}+1{color} the patch does not modify JPA files
{color:red}-1 TESTS{color}
.Tests run: 1384
.Tests failed: 0
.Tests errors: 2

.The patch failed the following testcases:

.  

{color:green}+1 DISTRO{color}
.{color:green}+1{color} distro tarball builds with the patch 


{color:red}*-1 Overall result, please check the reported -1(s)*{color}


The full output of the test-patch run is available at

.   https://builds.apache.org/job/oozie-trunk-precommit-build/1013/

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581-r6.patch, OOZIE-1581-r7.patch, 
 OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-01-08 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13865906#comment-13865906
 ] 

Hadoop QA commented on OOZIE-1581:
--

Testing JIRA OOZIE-1581

Cleaning local git workspace



{color:green}+1 PATCH_APPLIES{color}
{color:green}+1 CLEAN{color}
{color:green}+1 RAW_PATCH_ANALYSIS{color}
.{color:green}+1{color} the patch does not introduce any @author tags
.{color:green}+1{color} the patch does not introduce any tabs
.{color:green}+1{color} the patch does not introduce any trailing spaces
.{color:green}+1{color} the patch does not introduce any line longer than 
132
.{color:green}+1{color} the patch does adds/modifies 13 testcase(s)
{color:green}+1 RAT{color}
.{color:green}+1{color} the patch does not seem to introduce new RAT 
warnings
{color:green}+1 JAVADOC{color}
.{color:green}+1{color} the patch does not seem to introduce new Javadoc 
warnings
{color:green}+1 COMPILE{color}
.{color:green}+1{color} HEAD compiles
.{color:green}+1{color} patch compiles
.{color:green}+1{color} the patch does not seem to introduce new javac 
warnings
{color:green}+1 BACKWARDS_COMPATIBILITY{color}
.{color:green}+1{color} the patch does not change any JPA 
Entity/Colum/Basic/Lob/Transient annotations
.{color:green}+1{color} the patch does not modify JPA files
{color:red}-1 TESTS{color}
.Tests run: 1382
.Tests failed: 0
.Tests errors: 2

.The patch failed the following testcases:

.  

{color:green}+1 DISTRO{color}
.{color:green}+1{color} distro tarball builds with the patch 


{color:red}*-1 Overall result, please check the reported -1(s)*{color}


The full output of the test-patch run is available at

.   https://builds.apache.org/job/oozie-trunk-precommit-build/993/

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581-r6.patch, OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-01-07 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13865025#comment-13865025
 ] 

Hadoop QA commented on OOZIE-1581:
--

Testing JIRA OOZIE-1581

Cleaning local git workspace



{color:green}+1 PATCH_APPLIES{color}
{color:green}+1 CLEAN{color}
{color:red}-1 RAW_PATCH_ANALYSIS{color}
.{color:green}+1{color} the patch does not introduce any @author tags
.{color:green}+1{color} the patch does not introduce any tabs
.{color:green}+1{color} the patch does not introduce any trailing spaces
.{color:red}-1{color} the patch contains 1 line(s) longer than 132 
characters
.{color:green}+1{color} the patch does adds/modifies 13 testcase(s)
{color:green}+1 RAT{color}
.{color:green}+1{color} the patch does not seem to introduce new RAT 
warnings
{color:green}+1 JAVADOC{color}
.{color:green}+1{color} the patch does not seem to introduce new Javadoc 
warnings
{color:green}+1 COMPILE{color}
.{color:green}+1{color} HEAD compiles
.{color:green}+1{color} patch compiles
.{color:green}+1{color} the patch does not seem to introduce new javac 
warnings
{color:green}+1 BACKWARDS_COMPATIBILITY{color}
.{color:green}+1{color} the patch does not change any JPA 
Entity/Colum/Basic/Lob/Transient annotations
.{color:green}+1{color} the patch does not modify JPA files
{color:red}-1 TESTS{color}
.Tests run: 1382
.Tests failed: 0
.Tests errors: 1

.The patch failed the following testcases:

.  

{color:green}+1 DISTRO{color}
.{color:green}+1{color} distro tarball builds with the patch 


{color:red}*-1 Overall result, please check the reported -1(s)*{color}


The full output of the test-patch run is available at

.   https://builds.apache.org/job/oozie-trunk-precommit-build/989/

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-01-07 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13865029#comment-13865029
 ] 

Hadoop QA commented on OOZIE-1581:
--

Testing JIRA OOZIE-1581

Cleaning local git workspace



{color:red}-1{color} Patch failed to apply to head of branch



 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2014-01-02 Thread Hadoop QA (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13861182#comment-13861182
 ] 

Hadoop QA commented on OOZIE-1581:
--

Testing JIRA OOZIE-1581

Cleaning local git workspace



{color:green}+1 PATCH_APPLIES{color}
{color:green}+1 CLEAN{color}
{color:red}-1 RAW_PATCH_ANALYSIS{color}
.{color:green}+1{color} the patch does not introduce any @author tags
.{color:green}+1{color} the patch does not introduce any tabs
.{color:green}+1{color} the patch does not introduce any trailing spaces
.{color:red}-1{color} the patch contains 1 line(s) longer than 132 
characters
.{color:green}+1{color} the patch does adds/modifies 13 testcase(s)
{color:green}+1 RAT{color}
.{color:green}+1{color} the patch does not seem to introduce new RAT 
warnings
{color:green}+1 JAVADOC{color}
.{color:green}+1{color} the patch does not seem to introduce new Javadoc 
warnings
{color:red}-1 COMPILE{color}
.{color:green}+1{color} HEAD compiles
.{color:red}-1{color} patch does not compile
.{color:green}+1{color} the patch does not seem to introduce new javac 
warnings
{color:green}+1 BACKWARDS_COMPATIBILITY{color}
.{color:green}+1{color} the patch does not change any JPA 
Entity/Colum/Basic/Lob/Transient annotations
.{color:green}+1{color} the patch does not modify JPA files
{color:red}-1 TESTS{color} - patch does not compile, cannot run testcases
{color:red}-1 DISTRO{color}
.{color:red}-1{color} distro tarball fails with the patch


{color:red}*-1 Overall result, please check the reported -1(s)*{color}


The full output of the test-patch run is available at

.   https://builds.apache.org/job/oozie-trunk-precommit-build/983/

 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581-r6.patch, OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2013-11-25 Thread Mona Chitnis (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13832076#comment-13832076
 ] 

Mona Chitnis commented on OOZIE-1581:
-

failing test is flaky - 
java.lang.NullPointerException at 
org.apache.oozie.event.TestEventGeneration.testCoordinatorActionEvent(TestEventGeneration.java:326)

will fix while committing.


 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581-final.patch, 
 OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--
This message was sent by Atlassian JIRA
(v6.1#6144)


[jira] [Commented] (OOZIE-1581) Workflow performance optimizations

2013-11-06 Thread Virag Kothari (JIRA)

[ 
https://issues.apache.org/jira/browse/OOZIE-1581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanelfocusedCommentId=13815219#comment-13815219
 ] 

Virag Kothari commented on OOZIE-1581:
--

Couple of things discussed with Mona:

OOZIE-243 adds the control nodes to db and all the control nodes follow the 
command life cycle. Instead of optimizing the execution of commands for this 
nodes (async to sync), can we devise a way such that the control nodes can be 
configured to be not added as wf_actions in database? In this case, they wont 
go through the command life cycle like action nodes.

While synchronously calling command, it would be good to check if we can pass 
the bean object to another command directly, so the other command doesn't need 
to perform db operations like loadState() and verifyPreCondition(). E.g 
CoordActionReady to CoordActionStart in the patch. Also, please check whether 
this type of optimization can be done at other places.


 Workflow performance optimizations
 --

 Key: OOZIE-1581
 URL: https://issues.apache.org/jira/browse/OOZIE-1581
 Project: Oozie
  Issue Type: Improvement
  Components: workflow
Affects Versions: trunk
Reporter: Mona Chitnis
Assignee: Mona Chitnis
 Fix For: trunk

 Attachments: OOZIE-1581-2.patch, OOZIE-1581.patch


 Creating a combo JIRA for small performance optimizations.
 1. changing from asynchronous action start to a synchronous one, to overcome 
 the undue delay in transitioning from ::start:: control node to the actual 
 first node, owing to a loaded queue. This delay has been observed to be close 
 to 30 min at times in stress conditions.



--