[jira] [Updated] (IGNITE-7538) Update several maven plugins version for Java 9 compilation
[ https://issues.apache.org/jira/browse/IGNITE-7538?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Dmitriy Pavlov updated IGNITE-7538: --- Fix Version/s: 2.8 > Update several maven plugins version for Java 9 compilation > --- > > Key: IGNITE-7538 > URL: https://issues.apache.org/jira/browse/IGNITE-7538 > Project: Ignite > Issue Type: Task >Reporter: Peter Ivanov >Assignee: Peter Ivanov >Priority: Critical > Fix For: 2.8 > > Time Spent: 10m > Remaining Estimate: 0h > > * rat plugin > * flat plugin > * java plugin -- This message was sent by Atlassian JIRA (v7.6.3#76005)
[jira] [Updated] (IGNITE-7538) Update several maven plugins version for Java 9 compilation
[ https://issues.apache.org/jira/browse/IGNITE-7538?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Peter Ivanov updated IGNITE-7538: - Description: * rat plugin * flat plugin * java plugin was: After IGNITE-7203 and IGNITE-6730 there are two separate test project at CI which meet the problem of test configuration synchronization. It is necessary to devise a solution for overcoming this issue. Possible approaches: # Single project for tests with run with different parameters. Problems: #* Test History will show history for all builds with any parameters combination. #* Mute test will mute test for all parameters configuration. # Several project (differentiated by parameter) with build configuration synchronisation automation. Problems: #* Maintainability — how to seamlessly support build configuration synchronisation. Research for both approaches must be held. After corresponding research, following targets are required: # Speedup -- introduce more optimal architecture of build chain (with one build - multiple tests). # Java 8 / Java 9 compatibility. > Update several maven plugins version for Java 9 compilation > --- > > Key: IGNITE-7538 > URL: https://issues.apache.org/jira/browse/IGNITE-7538 > Project: Ignite > Issue Type: Task >Reporter: Peter Ivanov >Assignee: Peter Ivanov >Priority: Critical > > * rat plugin > * flat plugin > * java plugin -- This message was sent by Atlassian JIRA (v7.6.3#76005)
[jira] [Updated] (IGNITE-7538) Update several maven plugins version for Java 9 compilation
[ https://issues.apache.org/jira/browse/IGNITE-7538?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Peter Ivanov updated IGNITE-7538: - Summary: Update several maven plugins version for Java 9 compilation (was: Introduce test project for Ignite 2.0+ with Java 8/9/10 compatibility) > Update several maven plugins version for Java 9 compilation > --- > > Key: IGNITE-7538 > URL: https://issues.apache.org/jira/browse/IGNITE-7538 > Project: Ignite > Issue Type: Task >Reporter: Peter Ivanov >Assignee: Peter Ivanov >Priority: Critical > > After IGNITE-7203 and IGNITE-6730 there are two separate test project at CI > which meet the problem of test configuration synchronization. It is necessary > to devise a solution for overcoming this issue. > Possible approaches: > # Single project for tests with run with different parameters. > Problems: > #* Test History will show history for all builds with any parameters > combination. > #* Mute test will mute test for all parameters configuration. > # Several project (differentiated by parameter) with build configuration > synchronisation automation. > Problems: > #* Maintainability — how to seamlessly support build configuration > synchronisation. > Research for both approaches must be held. > After corresponding research, following targets are required: > # Speedup -- introduce more optimal architecture of build chain (with one > build - multiple tests). > # Java 8 / Java 9 compatibility. -- This message was sent by Atlassian JIRA (v7.6.3#76005)