Re: d-i upload for 8.11 (was: Re: Scheduling final Jessie point release, 8.11)

2018-06-21 Thread Cyril Brulebois
Hi, Cyril Brulebois (2018-06-19): > I might try and give amd64/i386 netinst a shot, just to be sure. Of course we won't have netinst until the point release has happened; and I guess I didn't really mean netboot either since we're currently lacking udebs for the new ABI (only in o-p-u for now),

Re: d-i upload for 8.11 (was: Re: Scheduling final Jessie point release, 8.11)

2018-06-19 Thread Cyril Brulebois
Hi, Adam D. Barratt (2018-06-18): > Yes, d-i and dini are the last things I'm expecting for the point > release; everything else has been in place for at least a couple of > dinstalls already. > > If the d-i upload could happen before the end of tomorrow, that should > still give us plenty of ti

Re: d-i upload for 8.11 (was: Re: Scheduling final Jessie point release, 8.11)

2018-06-18 Thread Cyril Brulebois
Adam D. Barratt (2018-06-18): > Yes, d-i and dini are the last things I'm expecting for the point > release; everything else has been in place for at least a couple of > dinstalls already. Great. > If the d-i upload could happen before the end of tomorrow, that should > still give us plenty of t

Re: d-i upload for 8.11 (was: Re: Scheduling final Jessie point release, 8.11)

2018-06-18 Thread Adam D. Barratt
Hi, On Mon, 2018-06-18 at 20:02 +0200, Cyril Brulebois wrote: > Adam D. Barratt (2018-06-18): > > One thing I'd overlooked when scheduling binNMUs for d-i in > > preparation for the point release is that there's been a kernel ABI > > change (actually, two) in opu since the previous point release,

Re: d-i upload for 8.11 (was: Re: Scheduling final Jessie point release, 8.11)

2018-06-18 Thread Cyril Brulebois
Hi, Adam D. Barratt (2018-06-18): > One thing I'd overlooked when scheduling binNMUs for d-i in > preparation for the point release is that there's been a kernel ABI > change (actually, two) in opu since the previous point release, so we > will need a source d-i upload after all. > > KiBi: Is th

d-i upload for 8.11 (was: Re: Scheduling final Jessie point release, 8.11)

2018-06-18 Thread Adam D. Barratt
[recipient list dropped to KiBi, -boot and -release] On Tue, 2018-05-15 at 22:56 +0200, Cyril Brulebois wrote: Anything June/July-ish should be good for me. > > > debian-boot@, if there's anything needing a fix in jessie, please > follow up to the list and myself. One thing I'd overlooked when

Re: Scheduling final Jessie point release, 8.11

2018-06-03 Thread Jonathan Wiltshire
On Mon, May 14, 2018 at 06:26:08PM +0100, Jonathan Wiltshire wrote: > - 23rd Jun > - (30th Jun I already know is impossible, for the sake of completeness) > - 7th July Let's go for 23rd June. I'll send the premliminaries shortly. Thanks, -- Jonathan Wiltshire

Re: Scheduling final Jessie point release, 8.11

2018-05-20 Thread Joerg Jaspert
On 15037 March 1977, Jonathan Wiltshire wrote: > - 23rd Jun Ok. > - 7th July No. -- bye, Joerg

Re: Scheduling final Jessie point release, 8.11

2018-05-18 Thread Laura Arjona Reina
Hello El 14/05/18 a las 19:26, Jonathan Wiltshire escribió: > Hi, > > According to my records main security support for Jessie can end any time > after 17th June. > > So to the security team: do you have a date in mind? > > I also presume that LTS will take over the existing security suites as

Re: Scheduling final Jessie point release, 8.11

2018-05-15 Thread Cyril Brulebois
Hi, Jonathan Wiltshire (2018-05-14): > According to my records main security support for Jessie can end any > time after 17th June. > > So to the security team: do you have a date in mind? > > I also presume that LTS will take over the existing security suites as > before. [1] lists the curren

Re: Scheduling final Jessie point release, 8.11

2018-05-14 Thread Steve McIntyre
On Mon, May 14, 2018 at 06:26:08PM +0100, Jonathan Wiltshire wrote: >Hi, > >According to my records main security support for Jessie can end any time >after 17th June. > >So to the security team: do you have a date in mind? > >I also presume that LTS will take over the existing security suites as

Re: Scheduling final Jessie point release, 8.11

2018-05-14 Thread Moritz Mühlenhoff
On Mon, May 14, 2018 at 06:26:08PM +0100, Jonathan Wiltshire wrote: > Hi, > > According to my records main security support for Jessie can end any time > after 17th June. > > So to the security team: do you have a date in mind? The 17th :-) Cheers, Moritz

Scheduling final Jessie point release, 8.11

2018-05-14 Thread Jonathan Wiltshire
Hi, According to my records main security support for Jessie can end any time after 17th June. So to the security team: do you have a date in mind? I also presume that LTS will take over the existing security suites as before. [1] lists the current delta between security and o-p-u-new which wou