I have been watching this subject for a while.
i vaguely recall that in some front matter in some standards is a statement
that indicates that this is the minimum requirements to go to market.
So in the interests of the Corp/s that I worked for at the time, and any
quality targets, that they ma
Hi James,
Thank you for drawing attention to this but my sentence was in context
of 62368-1 only.
When in 2004 (few days after we joined EU) I went with my devices for
the first time to EMC lab (it was an internal company laboratory that
also offered external services) they didn't had a capa
Hi Piotr,
Just to add to the debate:
“I know that if circuit is not going out of building it is considered being
without transients”
If a cable is longer than 30m then most product EMC standards will call up a
requirement for line-to-earth surge testing. Some do make it explicit that
Hi Ralph and John,
62368-1 I have bought from PKN is in form "first and last page Polish
and everything inside English".
I suppose they with pleasure will charge me for 62368-2 if I ask them
for it. The only question is how much time is needed to prepare these 2
pages.
As I remember from times
4 matches
Mail list logo