Re: Procedure to verify OFFLOAD process

2008-05-02 Thread Lizette Koehler
ubject: Procedure to verify OFFLOAD process Hi everyone, The challenge is change spool dasd type with offload process. We have been draining volumes and replacing them as they draining, but this takes too much time and we want to speed up the process. Other condition is that I can't add new volum

Re: Procedure to verify OFFLOAD process

2008-05-01 Thread Glenn Miller
Hi Angel, You did not indicate which JES your z/OS R8 system is running, JES2 or JES3. I have used only JES2 so if you are using JES3 the information I have provided may not be applicable. First you indicated that your JES system has reached the limit of 255 Spool volumes. According to the "

Re: Procedure to verify OFFLOAD process

2008-05-01 Thread Rick Fochtman
--- The challenge is change spool dasd type with offload process. We have been draining volumes and replacing them as they draining, but this takes too much time and we want to speed up the process. Other condition is that I can't add new volumes to spool beca

Procedure to verify OFFLOAD process

2008-04-30 Thread Angel Tamayo
Hi everyone, The challenge is change spool dasd type with offload process. We have been draining volumes and replacing them as they draining, but this takes too much time and we want to speed up the process. Other condition is that I can't add new volumes to spool because there is no room to new v