>> We use declarative pipelines extensively, triggered by SCM change. We
use a
>> cron spec to specify a SCM polling interval.
>> It seems that the trigger specification can be set in two places: in the
GUI
>> configuration for the job and in the pipeline itself.
>> Do I need to set both
The GUI portion is filled in by the pipeline once it has run once and the
triggers and so forth have been processed. You can't change the cron in the
GUI and have it work. It only works to change it in the pipeline itself.
On Wed, Sep 25, 2019 at 1:16 AM David Aldrich
wrote:
> Hi
>
> We use
Hi
We use declarative pipelines extensively, triggered by SCM change. We use a
cron spec to specify a SCM polling interval.
It seems that the trigger specification can be set in two places: in the
GUI configuration for the job and in the pipeline itself.
Do I need to set both trigger