#255: Request to join Proven Testers
-+--
Reporter: dafrito | Owner:
Type: proventester request | Status: new
Priority: minor| Milestone:
Co
The following Fedora 14 Security updates need testing:
https://admin.fedoraproject.org/updates/moodle-1.9.14-1.fc14
https://admin.fedoraproject.org/updates/nss-3.12.10-7.fc14
https://admin.fedoraproject.org/updates/hardlink-1.0-12.fc14
https://admin.fedoraproject.org/updates/freety
The following Fedora 15 Security updates need testing:
https://admin.fedoraproject.org/updates/moodle-1.9.14-1.fc15
https://admin.fedoraproject.org/updates/nss-3.12.10-7.fc15
https://admin.fedoraproject.org/updates/hardlink-1.0-12.fc15
https://admin.fedoraproject.org/updates/opensw
#254: proventester request
--+-
Reporter: piyushsaini | Owner: mcloaked
Type: proventester request | Status: assigned
Priority: major| Milestone:
#253: Request to join the proven tester group
--+-
Reporter: misc | Owner:
Type: proventester request | Status: closed
Priority: trivial |
On Fri, 2011-11-11 at 05:25 -0800, Chuck Forsberg WA7KGX N2469R wrote:
> I prepped an old 20 GB IDE drive with a 500 MB FreeDOS partition.
> Anaconds 25 refused to use this disk unless it wiped out existing
> partition table (and FreeDOS with it).
Details, please. Refused to use it in exactly wha
Compose started at Fri Nov 11 08:15:26 UTC 2011
Broken deps for x86_64
--
4ti2-1.3.2-7.fc17.1.x86_64 requires libgmp.so.3()(64bit)
1:anerley-0.3.0-5.fc17.i686 requires libedataserver-1.2.so.15
1:anerley-0.3.0-5.fc17.i6
#254: proventester request
-+--
Reporter: piyushsaini | Owner:
Type: proventester request | Status: new
Priority: major| Milestone:
Component:
I prepped an old 20 GB IDE drive with a 500 MB FreeDOS partition.
Anaconds 25 refused to use this disk unless it wiped out existing
partition table (and FreeDOS with it).
I prepped an old 18 GB IDE drive with 500 MB of FreeDOS and loaded
Xubuntu 10.10 on the rest using manual partition. Xubuntu
#253: Request to join the proven tester group
-+--
Reporter: misc | Owner:
Type: proventester request | Status: new
Priority: trivial | Milestone
10 matches
Mail list logo