El 23/10/16 a les 19:02, Cédric Krier ha escrit:
Hi,
With the #TUB2016 code sprint, there are still some patches waiting to
be included. I would like to give one extra week to finish and include
them. This means that we need to postpone the release that was planned
the 21st to the 28th November.
Hi,
With the #TUB2016 code sprint, there are still some patches waiting to
be included. I would like to give one extra week to finish and include
them. This means that we need to postpone the release that was planned
the 21st to the 28th November.
Is there no problem?
--
Cédric Krier - B2CK SPR