strange reclaimation behavor

2005-01-04 Thread Tyree, David
I have something strange going on with my reclaimations. I have
the system issue a command in the afternoons to start reclaiming tapes by
dropping the levels to 60%. I then have it issue another command around
midnight to raise the levels back to 100%.

When I get here in the morning I will usally find that
reclaiming is still going on. I have verified that the stop_reclaim scripts
are actually running by looking at the actlog for the time period involved.
I end up doing a cancel process to get it to stop.

I could understand it still running if it was in the middle of a
50-60 gig file but it's only moving small (several meg) files. It's had
about eight hours to stop on it's own. I would have thought it would have
found an opertunity to stop after eight hours.

The contents of all of the scripts involved are correct. I have
one starting the tapepool and another to start the copypool and another
couple to raise the level back up. I alternate different pools each night.

Any ideas here?

I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T library.





David Tyree
Enterprise Backup Administrator
South Georgia Medical Center
229.333.1155

Confidential Notice:  This e-mail message, including any attachments, is for
the sole use of the intended recipient(s) and may contain confidential and
privileged information.  Any unauthorized review, use,  disclosure or
distribution is prohibited.  If you are not the intended recipient, please
contact the sender by reply e-mail and destroy all copies of the original
message.


AW: strange reclaimation behavor

2005-01-04 Thread Thomas Rupp
Copied from Richard Sims ADSM/TSM Quick Facts at
http://people.bu.edu/rbs/ADSM.funcdir

For an onsite storage pool, the new
REClaim value is observed as the next
volume is handled.
For an offsite storage pool, the new
REClaim value is *not* observed prior to
the conclusion of the current process.
Ref: Admin Guide manual topic Choosing
a Reclamation Threshold, Lowering the
Migration Threshold.


-Ursprüngliche Nachricht-
Von: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] Im Auftrag von Tyree, 
David
Gesendet: Dienstag, 04. Jänner 2005 15:18
An: ADSM-L@VM.MARIST.EDU
Betreff: strange reclaimation behavor


I have something strange going on with my reclaimations. I have
the system issue a command in the afternoons to start reclaiming tapes by
dropping the levels to 60%. I then have it issue another command around
midnight to raise the levels back to 100%.

When I get here in the morning I will usally find that
reclaiming is still going on. I have verified that the stop_reclaim scripts
are actually running by looking at the actlog for the time period involved.
I end up doing a cancel process to get it to stop.

I could understand it still running if it was in the middle of a
50-60 gig file but it's only moving small (several meg) files. It's had
about eight hours to stop on it's own. I would have thought it would have
found an opertunity to stop after eight hours.

The contents of all of the scripts involved are correct. I have
one starting the tapepool and another to start the copypool and another
couple to raise the level back up. I alternate different pools each night.

Any ideas here?

I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T library.





David Tyree
Enterprise Backup Administrator
South Georgia Medical Center
229.333.1155

Confidential Notice:  This e-mail message, including any attachments, is for
the sole use of the intended recipient(s) and may contain confidential and
privileged information.  Any unauthorized review, use,  disclosure or
distribution is prohibited.  If you are not the intended recipient, please
contact the sender by reply e-mail and destroy all copies of the original
message.


Re: strange reclaimation behavor

2005-01-04 Thread Wheelock, Michael D
Hi,

When you start reclamation it begins a process and decides which tapes
it is going to reclaim based on the value given.  These tapes can be
seen in the activity log of the server.  It will continue to reclaim
until it has reclaimed all of the tapes in the list or you cancel the
reclamation process.  

I have seen similar behavior in the migration process as well.  If you
set a storage pool to migrate (ie. By setting high=0 and low=0) then it
will empty it out. If you subsequently reset the values (and the storage
pool is now above the low value and below the high value) it will
continue to migrate all of the data out.

The migration_stop is there to set up the storage pools for the next
day's backup.  The reclamation stop doesn't seem to be terribly useful.

I set my storage pools to a decent value all of the time (something like
rec=90).  Then on weekends (usually Friday afternoon) I set it to
something deeper (currently rec=75 especially for the storage pools on
the remote server).  

Michael Wheelock
Integris Health



-Original Message-
From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] On Behalf Of
Tyree, David
Sent: Tuesday, January 04, 2005 8:18 AM
To: ADSM-L@VM.MARIST.EDU
Subject: strange reclaimation behavor

I have something strange going on with my reclaimations. I
have
the system issue a command in the afternoons to start reclaiming tapes
by
dropping the levels to 60%. I then have it issue another command around
midnight to raise the levels back to 100%.

When I get here in the morning I will usally find that
reclaiming is still going on. I have verified that the stop_reclaim
scripts
are actually running by looking at the actlog for the time period
involved.
I end up doing a cancel process to get it to stop.

I could understand it still running if it was in the middle
of a
50-60 gig file but it's only moving small (several meg) files. It's had
about eight hours to stop on it's own. I would have thought it would
have
found an opertunity to stop after eight hours.

The contents of all of the scripts involved are correct. I
have
one starting the tapepool and another to start the copypool and another
couple to raise the level back up. I alternate different pools each
night.

Any ideas here?

I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T
library.





David Tyree
Enterprise Backup Administrator
South Georgia Medical Center
229.333.1155

Confidential Notice:  This e-mail message, including any attachments, is
for
the sole use of the intended recipient(s) and may contain confidential
and
privileged information.  Any unauthorized review, use,  disclosure or
distribution is prohibited.  If you are not the intended recipient,
please
contact the sender by reply e-mail and destroy all copies of the
original
message.
**
This e-mail may contain identifiable health information that is subject to 
protection 
under state and federal law. This information is intended to be for the use of 
the 
individual named above. If you are not the intended recipient, be aware that 
any 
disclosure, copying, distribution or use of the contents of this information is 
prohibited 
and may be punishable by law. If you have received this electronic transmission 
in 
error, please notify us immediately by electronic mail (reply).
**


Re: strange reclaimation behavor

2005-01-04 Thread Roger Deschner
That's not right. I just proved it, inadvertently.

I wanted to deliberately empty out a Disk Storage Pool. I had set
lowmig=0 highmig=0 migprocess=4 and it had dutifully mounted 4 tapes and
started emptying things out in a hurry.

Then 10:00 came, and a daily schedule I had set months ago to shut down
migration at that time, happened, and set it to highmig=75 lowmig=25.
(Classic self-inflicted foot-shooting.) The effect was to cancel all of
the migration processes, even though the storage pool was still 10%
full. These process cancelations took effect when each process reached
the end of the current file, so they didn't all happen at once although
it was fairly quick. Fortunately all the tapes were still mounted so I
got them started again quickly. But what I proved (again) was that
Migration will stop as soon as you change the thresholds, not when the
original lowmig has been reached.

If you are seeing something different, I wonder if your client nodes
are backing up very large individual files?

Reclamation is different from migration. While it does not work on a
pre-built list, you are correct that it continues until the end of the
volume it is currently reclaiming. Once a reclamation process finishes
work on a volume, then the server examines the thresholds all over again
to see if it wants to reclaim another tape. So if the reclamation
threshold for that storage pool has been changed, it will take effect at
that time - at the end of the volume currently being processed, not
after all volumes in some list have been processed. As a result, if you
are doing this on some schedule, and you need the tape drives at a
particular time for something else such as database backup, you can
either change the reclamation theshold several hours in advance, or
develop an OS script to query the process, parse the result, and cancel
it by process number. Even then, the reclamation process cancelation
will not take effect until the end of the file currently being
processed.

The strategy I use to make sure I get the tape drives for database
backup at the scheduled time, is to run migration between reclamation
and DB backup, since migration can stop itself and free the drives
pretty quickly, in contrast to reclamation.

Roger Deschner  University of Illinois at Chicago [EMAIL PROTECTED]
==I have not lost my mind -- it is backed up on tape somewhere.=



 Date:  Jan 04, 09:45
 From:  Wheelock, Michael D nobody at nowhere.com

Hi,

When you start reclamation it begins a process and decides which tapes
it is going to reclaim based on the value given.  These tapes can be
seen in the activity log of the server.  It will continue to reclaim
until it has reclaimed all of the tapes in the list or you cancel the
reclamation process. =20

I have seen similar behavior in the migration process as well.  If you
set a storage pool to migrate (ie. By setting high=3D0 and low=3D0) then =
it
will empty it out. If you subsequently reset the values (and the storage
pool is now above the low value and below the high value) it will
continue to migrate all of the data out.

The migration_stop is there to set up the storage pools for the next
day's backup.  The reclamation stop doesn't seem to be terribly useful.

I set my storage pools to a decent value all of the time (something like
rec=3D90).  Then on weekends (usually Friday afternoon) I set it to
something deeper (currently rec=3D75 especially for the storage pools on
the remote server). =20

Michael Wheelock
Integris Health



-Original Message-
From: ADSM: Dist Stor Manager [mailto:ADSM-L AT VM.MARIST DOT EDU] On Behalf Of
Tyree, David
Sent: Tuesday, January 04, 2005 8:18 AM
To: ADSM-L AT VM.MARIST DOT EDU
Subject: strange reclaimation behavor

I have something strange going on with my reclaimations. I
have
the system issue a command in the afternoons to start reclaiming tapes
by
dropping the levels to 60%. I then have it issue another command around
midnight to raise the levels back to 100%.

When I get here in the morning I will usally find that
reclaiming is still going on. I have verified that the stop_reclaim
scripts
are actually running by looking at the actlog for the time period
involved.
I end up doing a cancel process to get it to stop.

I could understand it still running if it was in the middle
of a
50-60 gig file but it's only moving small (several meg) files. It's had
about eight hours to stop on it's own. I would have thought it would
have
found an opertunity to stop after eight hours.

The contents of all of the scripts involved are correct. I
have
one starting the tapepool and another to start the copypool and another
couple to raise the level back up. I alternate different pools each
night.

Any ideas here?

I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T
library.





David Tyree
Enterprise Backup Administrator
South Georgia Medical Center
229.333.1155

Re: strange reclaimation behavor

2005-01-04 Thread Mark D. Rodriguez
, not when the
original lowmig has been reached.
If you are seeing something different, I wonder if your client nodes
are backing up very large individual files?
Reclamation is different from migration. While it does not work on a
pre-built list, you are correct that it continues until the end of the
volume it is currently reclaiming. Once a reclamation process finishes
work on a volume, then the server examines the thresholds all over again
to see if it wants to reclaim another tape. So if the reclamation
threshold for that storage pool has been changed, it will take effect at
that time - at the end of the volume currently being processed, not
after all volumes in some list have been processed. As a result, if you
are doing this on some schedule, and you need the tape drives at a
particular time for something else such as database backup, you can
either change the reclamation theshold several hours in advance, or
develop an OS script to query the process, parse the result, and cancel
it by process number. Even then, the reclamation process cancelation
will not take effect until the end of the file currently being
processed.
The strategy I use to make sure I get the tape drives for database
backup at the scheduled time, is to run migration between reclamation
and DB backup, since migration can stop itself and free the drives
pretty quickly, in contrast to reclamation.
Roger Deschner  University of Illinois at Chicago [EMAIL PROTECTED]
==I have not lost my mind -- it is backed up on tape somewhere.=


Date:  Jan 04, 09:45
From:  Wheelock, Michael D nobody at nowhere.com
Hi,
When you start reclamation it begins a process and decides which tapes
it is going to reclaim based on the value given.  These tapes can be
seen in the activity log of the server.  It will continue to reclaim
until it has reclaimed all of the tapes in the list or you cancel the
reclamation process. =20
I have seen similar behavior in the migration process as well.  If you
set a storage pool to migrate (ie. By setting high=3D0 and low=3D0) then =
it
will empty it out. If you subsequently reset the values (and the storage
pool is now above the low value and below the high value) it will
continue to migrate all of the data out.
The migration_stop is there to set up the storage pools for the next
day's backup.  The reclamation stop doesn't seem to be terribly useful.
I set my storage pools to a decent value all of the time (something like
rec=3D90).  Then on weekends (usually Friday afternoon) I set it to
something deeper (currently rec=3D75 especially for the storage pools on
the remote server). =20
Michael Wheelock
Integris Health

-Original Message-
From: ADSM: Dist Stor Manager [mailto:ADSM-L AT VM.MARIST DOT EDU] On Behalf Of
Tyree, David
Sent: Tuesday, January 04, 2005 8:18 AM
To: ADSM-L AT VM.MARIST DOT EDU
Subject: strange reclaimation behavor
  I have something strange going on with my reclaimations. I
have
the system issue a command in the afternoons to start reclaiming tapes
by
dropping the levels to 60%. I then have it issue another command around
midnight to raise the levels back to 100%.
  When I get here in the morning I will usally find that
reclaiming is still going on. I have verified that the stop_reclaim
scripts
are actually running by looking at the actlog for the time period
involved.
I end up doing a cancel process to get it to stop.
  I could understand it still running if it was in the middle
of a
50-60 gig file but it's only moving small (several meg) files. It's had
about eight hours to stop on it's own. I would have thought it would
have
found an opertunity to stop after eight hours.
  The contents of all of the scripts involved are correct. I
have
one starting the tapepool and another to start the copypool and another
couple to raise the level back up. I alternate different pools each
night.
  Any ideas here?
I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T
library.


David Tyree
Enterprise Backup Administrator
South Georgia Medical Center
229.333.1155
Confidential Notice:  This e-mail message, including any attachments, is
for
the sole use of the intended recipient(s) and may contain confidential
and
privileged information.  Any unauthorized review, use,  disclosure or
distribution is prohibited.  If you are not the intended recipient,
please
contact the sender by reply e-mail and destroy all copies of the
original
message.
*=
*
This e-mail may contain identifiable health information that is subject t=
o protection=20
under state and federal law. This information is intended to be for the u=
se of the=20
individual named above. If you are not the intended recipient, be aware t=
hat any=20
disclosure, copying, distribution or use of the contents of this informat=
ion is prohibited=20
and may be punishable by law. If you have received

Re: strange reclaimation behavor

2005-01-04 Thread Timothy Hughes
 they didn't all happen at once although
 it was fairly quick. Fortunately all the tapes were still mounted so I
 got them started again quickly. But what I proved (again) was that
 Migration will stop as soon as you change the thresholds, not when the
 original lowmig has been reached.
 
 If you are seeing something different, I wonder if your client nodes
 are backing up very large individual files?
 
 Reclamation is different from migration. While it does not work on a
 pre-built list, you are correct that it continues until the end of the
 volume it is currently reclaiming. Once a reclamation process finishes
 work on a volume, then the server examines the thresholds all over again
 to see if it wants to reclaim another tape. So if the reclamation
 threshold for that storage pool has been changed, it will take effect at
 that time - at the end of the volume currently being processed, not
 after all volumes in some list have been processed. As a result, if you
 are doing this on some schedule, and you need the tape drives at a
 particular time for something else such as database backup, you can
 either change the reclamation theshold several hours in advance, or
 develop an OS script to query the process, parse the result, and cancel
 it by process number. Even then, the reclamation process cancelation
 will not take effect until the end of the file currently being
 processed.
 
 The strategy I use to make sure I get the tape drives for database
 backup at the scheduled time, is to run migration between reclamation
 and DB backup, since migration can stop itself and free the drives
 pretty quickly, in contrast to reclamation.
 
 Roger Deschner  University of Illinois at Chicago [EMAIL PROTECTED]
 ==I have not lost my mind -- it is backed up on tape somewhere.=
 
 
 
 
 
 Date:  Jan 04, 09:45
 From:  Wheelock, Michael D nobody at nowhere.com
 
 Hi,
 
 When you start reclamation it begins a process and decides which tapes
 it is going to reclaim based on the value given.  These tapes can be
 seen in the activity log of the server.  It will continue to reclaim
 until it has reclaimed all of the tapes in the list or you cancel the
 reclamation process. =20
 
 I have seen similar behavior in the migration process as well.  If you
 set a storage pool to migrate (ie. By setting high=3D0 and low=3D0) then =
 it
 will empty it out. If you subsequently reset the values (and the storage
 pool is now above the low value and below the high value) it will
 continue to migrate all of the data out.
 
 The migration_stop is there to set up the storage pools for the next
 day's backup.  The reclamation stop doesn't seem to be terribly useful.
 
 I set my storage pools to a decent value all of the time (something like
 rec=3D90).  Then on weekends (usually Friday afternoon) I set it to
 something deeper (currently rec=3D75 especially for the storage pools on
 the remote server). =20
 
 Michael Wheelock
 Integris Health
 
 
 
 -Original Message-
 From: ADSM: Dist Stor Manager [mailto:ADSM-L AT VM.MARIST DOT EDU] On 
 Behalf Of
 Tyree, David
 Sent: Tuesday, January 04, 2005 8:18 AM
 To: ADSM-L AT VM.MARIST DOT EDU
 Subject: strange reclaimation behavor
 
I have something strange going on with my reclaimations. I
 have
 the system issue a command in the afternoons to start reclaiming tapes
 by
 dropping the levels to 60%. I then have it issue another command around
 midnight to raise the levels back to 100%.
 
When I get here in the morning I will usally find that
 reclaiming is still going on. I have verified that the stop_reclaim
 scripts
 are actually running by looking at the actlog for the time period
 involved.
 I end up doing a cancel process to get it to stop.
 
I could understand it still running if it was in the middle
 of a
 50-60 gig file but it's only moving small (several meg) files. It's had
 about eight hours to stop on it's own. I would have thought it would
 have
 found an opertunity to stop after eight hours.
 
The contents of all of the scripts involved are correct. I
 have
 one starting the tapepool and another to start the copypool and another
 couple to raise the level back up. I alternate different pools each
 night.
 
Any ideas here?
 
 I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T
 library.
 
 
 
 
 
 David Tyree
 Enterprise Backup Administrator
 South Georgia Medical Center
 229.333.1155
 
 Confidential Notice:  This e-mail message, including any attachments, is
 for
 the sole use of the intended recipient(s) and may contain confidential
 and
 privileged information.  Any unauthorized review, use,  disclosure or
 distribution is prohibited.  If you are not the intended recipient,
 please
 contact the sender by reply e-mail and destroy all copies of the
 original
 message.
 *=
 *
 This e-mail may

Re: strange reclaimation behavor

2005-01-04 Thread Steve Roder
, and a daily schedule I had set months ago to shut down
 migration at that time, happened, and set it to highmig=75 lowmig=25.
 (Classic self-inflicted foot-shooting.) The effect was to cancel all of
 the migration processes, even though the storage pool was still 10%
 full. These process cancelations took effect when each process reached
 the end of the current file, so they didn't all happen at once although
 it was fairly quick. Fortunately all the tapes were still mounted so I
 got them started again quickly. But what I proved (again) was that
 Migration will stop as soon as you change the thresholds, not when the
 original lowmig has been reached.
 
 If you are seeing something different, I wonder if your client nodes
 are backing up very large individual files?
 
 Reclamation is different from migration. While it does not work on a
 pre-built list, you are correct that it continues until the end of the
 volume it is currently reclaiming. Once a reclamation process finishes
 work on a volume, then the server examines the thresholds all over again
 to see if it wants to reclaim another tape. So if the reclamation
 threshold for that storage pool has been changed, it will take effect at
 that time - at the end of the volume currently being processed, not
 after all volumes in some list have been processed. As a result, if you
 are doing this on some schedule, and you need the tape drives at a
 particular time for something else such as database backup, you can
 either change the reclamation theshold several hours in advance, or
 develop an OS script to query the process, parse the result, and cancel
 it by process number. Even then, the reclamation process cancelation
 will not take effect until the end of the file currently being
 processed.
 
 The strategy I use to make sure I get the tape drives for database
 backup at the scheduled time, is to run migration between reclamation
 and DB backup, since migration can stop itself and free the drives
 pretty quickly, in contrast to reclamation.
 
 Roger Deschner  University of Illinois at Chicago [EMAIL PROTECTED]
 ==I have not lost my mind -- it is backed up on tape somewhere.=
 
 
 
 
 
 Date:  Jan 04, 09:45
 From:  Wheelock, Michael D nobody at nowhere.com
 
 Hi,
 
 When you start reclamation it begins a process and decides which tapes
 it is going to reclaim based on the value given.  These tapes can be
 seen in the activity log of the server.  It will continue to reclaim
 until it has reclaimed all of the tapes in the list or you cancel the
 reclamation process. =20
 
 I have seen similar behavior in the migration process as well.  If you
 set a storage pool to migrate (ie. By setting high=3D0 and low=3D0) then =
 it
 will empty it out. If you subsequently reset the values (and the storage
 pool is now above the low value and below the high value) it will
 continue to migrate all of the data out.
 
 The migration_stop is there to set up the storage pools for the next
 day's backup.  The reclamation stop doesn't seem to be terribly useful.
 
 I set my storage pools to a decent value all of the time (something like
 rec=3D90).  Then on weekends (usually Friday afternoon) I set it to
 something deeper (currently rec=3D75 especially for the storage pools on
 the remote server). =20
 
 Michael Wheelock
 Integris Health
 
 
 
 -Original Message-
 From: ADSM: Dist Stor Manager [mailto:ADSM-L AT VM.MARIST DOT EDU] On 
 Behalf Of
 Tyree, David
 Sent: Tuesday, January 04, 2005 8:18 AM
 To: ADSM-L AT VM.MARIST DOT EDU
 Subject: strange reclaimation behavor
 
I have something strange going on with my reclaimations. I
 have
 the system issue a command in the afternoons to start reclaiming tapes
 by
 dropping the levels to 60%. I then have it issue another command around
 midnight to raise the levels back to 100%.
 
When I get here in the morning I will usally find that
 reclaiming is still going on. I have verified that the stop_reclaim
 scripts
 are actually running by looking at the actlog for the time period
 involved.
 I end up doing a cancel process to get it to stop.
 
I could understand it still running if it was in the middle
 of a
 50-60 gig file but it's only moving small (several meg) files. It's had
 about eight hours to stop on it's own. I would have thought it would
 have
 found an opertunity to stop after eight hours.
 
The contents of all of the scripts involved are correct. I
 have
 one starting the tapepool and another to start the copypool and another
 couple to raise the level back up. I alternate different pools each
 night.
 
Any ideas here?
 
 I'm running 5.2.2 on a Win2k server with 4 LTO2 drives in a PV136T
 library.
 
 
 
 
 
 David Tyree
 Enterprise Backup Administrator
 South Georgia Medical Center
 229.333.1155
 
 Confidential Notice:  This e-mail message, including any attachments, is
 for
 the sole use of the intended recipient(s) and may contain