Hi to all,
I have a question that I think I know the answer but need feedback
to make certain. Here is the scenario:
R1 - S1 (Area 0)
R1 - S0(Area 1) to R2 S0(Area 1)
!
R2 - S1 (Area 2) to R3 S1 (Area 2)
If R2 and R3 Area 2 are defined as a NSSA will I still need a virtual-link
for Area 2?
I would have to think yes, virtual-link is needed.
Thanks very much.
Danny
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=66957&t=66957
--
FAQ, list archives, and subscription info: http://www.groupstudy.com/list/cisco.html
Report misconduct and Nondisclosure violations to [EMAIL PROTECTED]