[jira] [Commented] (BEAM-4751) Finish io futurize stage 2: fix the missing pylint3 check in tox.ini

2018-08-01 Thread Matthias Feys (JIRA)


[ 
https://issues.apache.org/jira/browse/BEAM-4751?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16566387#comment-16566387
 ] 

Matthias Feys commented on BEAM-4751:
-

Yes, fixed now

> Finish io futurize stage 2: fix the missing pylint3 check in tox.ini
> 
>
> Key: BEAM-4751
> URL: https://issues.apache.org/jira/browse/BEAM-4751
> Project: Beam
>  Issue Type: Sub-task
>  Components: sdk-py-core
>Reporter: Matthias Feys
>Assignee: Matthias Feys
>Priority: Major
> Fix For: Not applicable
>
>  Time Spent: 2.5h
>  Remaining Estimate: 0h
>
> Finish io futurize stage 2: fix the missing pylint3 check in tox.ini



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)


[jira] [Commented] (BEAM-4751) Finish io futurize stage 2: fix the missing pylint3 check in tox.ini

2018-08-01 Thread Valentyn Tymofieiev (JIRA)


[ 
https://issues.apache.org/jira/browse/BEAM-4751?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16566209#comment-16566209
 ] 

Valentyn Tymofieiev commented on BEAM-4751:
---

With linked PR having been merged, should we close this one now?

> Finish io futurize stage 2: fix the missing pylint3 check in tox.ini
> 
>
> Key: BEAM-4751
> URL: https://issues.apache.org/jira/browse/BEAM-4751
> Project: Beam
>  Issue Type: Sub-task
>  Components: sdk-py-core
>Reporter: Matthias Feys
>Assignee: Matthias Feys
>Priority: Major
>  Time Spent: 2.5h
>  Remaining Estimate: 0h
>
> Finish io futurize stage 2: fix the missing pylint3 check in tox.ini



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)