ubcece offline in 16h due to poorly scheduled power outage
On Sat, Jan 31, 2015 at 08:52:49PM +, Luca Filipozzi wrote: DSA found out a little while ago that ubcece would be offline due a scheduled power outage in the data centre. I'm heading there in 2h to turn things off. Outage is expected to begin at 23:00Z and last for 7h. Due to timezone conversion snafu with hoster, outage will actually be 16h from now lasting 8h: 2015-02-01 15:30 UTC to 2015-02-01 23:30 UTC Thanks, Luca -- Luca Filipozzi http://www.crowdrise.com/SupportDebian signature.asc Description: Digital signature
Re: ubcece offline
On Mon, Jul 21, 2014 at 09:02:09PM +, Luca Filipozzi wrote: Due to a gas leak, the buildings around the 'ubcece' data centre where Debian equipment is located have been powered down. Most Debian equipment should still be running (the exception being spontini in MCLD), as the power to the KAIS building has not been cut. The reason for outage is that the KAIS network uplinks to the campus backbone via active network equipment in the MCLD building whose power has been cut. The 'all clear' was given about 30 minutes ago and UBC IT folks are bring things back up. ubcece is online. -- Luca Filipozzi http://www.crowdrise.com/SupportDebian signature.asc Description: Digital signature