Bryan Beaudreault created HBASE-27380:
-----------------------------------------

             Summary: RitDuration histogram metric is broken
                 Key: HBASE-27380
                 URL: https://issues.apache.org/jira/browse/HBASE-27380
             Project: HBase
          Issue Type: Bug
            Reporter: Bryan Beaudreault


Looks like the method which updates it in MetricsAssignmentManager, 
updateRitDuration, got broken somewhere along the way. It's no longer used. We 
should wire this back up.

https://github.com/apache/hbase/blob/master/hbase-server/src/main/java/org/apache/hadoop/hbase/master/MetricsAssignmentManager.java#L82



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to