[ 
https://issues.apache.org/jira/browse/LUCENE-8665?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jim Ferenczi resolved LUCENE-8665.
----------------------------------
    Resolution: Won't Fix

Fair enough. I reverted the version bump on branch_8x and will focus on 
releasing 7.7 first

> Add temporary code in TestBackwardsCompatibility to handle two concurrent 
> releases
> ----------------------------------------------------------------------------------
>
>                 Key: LUCENE-8665
>                 URL: https://issues.apache.org/jira/browse/LUCENE-8665
>             Project: Lucene - Core
>          Issue Type: Bug
>            Reporter: Jim Ferenczi
>            Priority: Major
>
> Today TestBackwardsCompatibility can handle a single release at a time 
> because TestBackwardsCompatibility#testAllVersionsTested is lenient on the 
> latest version only (the one that is released). However and since we want to 
> release two versions simultaneously (7.7 and 8.0) this test is failing on 
> branch_8x. This means that we need to do one release at a time or add more 
> leniency in the test to handle this special case. We could for instance add 
> something like:
> {noformat}
>     // NORELEASE: we have two releases in progress (7.7.0 and 8.0.0) so we 
> could be missing
>     // 2 files, 1 for 7.7.0 and one for 8.0.0. This should be removed when 
> 7.7.0 is released.
>     if (extraFiles.isEmpty() && missingFiles.size() == 2 && 
> missingFiles.contains("7.7.0-cfs") && missingFiles.contains("8.0.0-cfs")) {
>       // success
>       return;
>     }
> {noformat}
> and remove the code when 7.7.0 is released ?



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscr...@lucene.apache.org
For additional commands, e-mail: dev-h...@lucene.apache.org

Reply via email to