[jira] [Resolved] (SLING-10684) add integration tests to verify

2021-08-11 Thread Eric Norman (Jira)


 [ 
https://issues.apache.org/jira/browse/SLING-10684?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Eric Norman resolved SLING-10684.
-
Resolution: Fixed

Merged PR at:  
[{{4c5f0d1}}|https://github.com/apache/sling-org-apache-sling-scripting-sightly-testing/commit/4c5f0d1e5fe791d413d90864b1ae021bf692ea2d]

> add integration tests to verify
> ---
>
> Key: SLING-10684
> URL: https://issues.apache.org/jira/browse/SLING-10684
> Project: Sling
>  Issue Type: Sub-task
>Reporter: Eric Norman
>Assignee: Eric Norman
>Priority: Major
> Fix For: Scripting HTL Testing 1.0.32-1.4.0
>
>  Time Spent: 1h 10m
>  Remaining Estimate: 0h
>
> For testing 10677, provide the integration tests to verify the fix



--
This message was sent by Atlassian Jira
(v8.3.4#803005)


[jira] [Resolved] (SLING-10684) add integration tests to verify

2021-08-07 Thread Eric Norman (Jira)


 [ 
https://issues.apache.org/jira/browse/SLING-10684?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Eric Norman resolved SLING-10684.
-
Resolution: Fixed

Merged PR at:  
[{{7f8f5f3}}|https://github.com/apache/sling-org-apache-sling-scripting-sightly-testing-content/commit/7f8f5f3b089f9d021c39f8faf7119e2f7da49404]

> add integration tests to verify
> ---
>
> Key: SLING-10684
> URL: https://issues.apache.org/jira/browse/SLING-10684
> Project: Sling
>  Issue Type: Sub-task
>Reporter: Eric Norman
>Assignee: Eric Norman
>Priority: Major
> Fix For: Scripting HTL Testing 1.0.32-1.4.0
>
>  Time Spent: 50m
>  Remaining Estimate: 0h
>
> For testing 10677, provide the integration tests to verify the fix



--
This message was sent by Atlassian Jira
(v8.3.4#803005)