Normally with a new standard, all equipment still in production on or
after the date an existing standard is withdrawn, for which the
equipment was tested, and a revised one goes into force, the equipment
must be shown to comply with the new standard.
Does this also apply to equipment that was evaluated with a burst
generator that does not meet the new verification requirements of Amd 2
of the revised -4-4 standard?
Kind Regards,
Sam Wismer
Engineering Manager
ACS, Inc.
*Tel: (770) 831-8048
*Fax: (770) 831-8598
:Web: www.acstestlab.com
*swis...@acstestlab.com
From: owner-emc-p...@majordomo.ieee.org
[mailto:owner-emc-p...@majordomo.ieee.org] On Behalf Of John Woodgate
Sent: Saturday, January 11, 2003 8:43 AM
To: emc-p...@majordomo.ieee.org
Subject: Re: IEC vs. EN
I read in !emc-pstc that Sam Wismer swis...@acstestlab.com wrote (in
001001c2b8c4$7df00d20$0b01000a@sam) about 'IEC vs. EN' on Fri, 10 Jan
2003:
Case in point: EN 61000-4-4 Amd. 2 DoW for the superseded standard
is 7/04
however EN55024 calls out IEC 61000-4-4.
No, it only appears to. Because it's a clone of CISPR 24, its Normative
References clause refers to IEC standards. But Annex ZA (not very
clearly) replaces those references by the corresponding EN.
Is IEC 61000-4-4 amd. 2 in force
now and should it be used now when EN55024 is the applied standard?
No. The EN transition period applies. Industry cannot work with
standards that come into effect instantaneously and without prior
notice.
--
Regards, John Woodgate, OOO - Own Opinions Only.
http://www.jmwa.demon.co.uk
Interested in professional sound reinforcement and distribution? Then go
to
http://www.isce.org.uk
PLEASE do NOT copy news posts to me by E-MAIL!
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.
Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/
To cancel your subscription, send mail to:
majord...@ieee.org
with the single line:
unsubscribe emc-pstc
For help, send mail to the list administrators:
Ron Pickard: emc-p...@hypercom.com
Dave Heald: davehe...@attbi.com
For policy questions, send mail to:
Richard Nute: ri...@ieee.org
Jim Bacher: j.bac...@ieee.org
All emc-pstc postings are archived and searchable on the web at:
http://ieeepstc.mindcruiser.com/
Click on browse and then emc-pstc mailing list
This message is from the IEEE EMC Society Product Safety
Technical Committee emc-pstc discussion list.
Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/
To cancel your subscription, send mail to:
majord...@ieee.org
with the single line:
unsubscribe emc-pstc
For help, send mail to the list administrators:
Ron Pickard: emc-p...@hypercom.com
Dave Heald: davehe...@attbi.com
For policy questions, send mail to:
Richard Nute: ri...@ieee.org
Jim Bacher: j.bac...@ieee.org
All emc-pstc postings are archived and searchable on the web at:
http://ieeepstc.mindcruiser.com/
Click on browse and then emc-pstc mailing list