[ewg] OFA EWG meeting will be on Monday Aug 17th 2015 at 9:00 AM Pacific

2015-08-17 Thread Rupert Dance
Hi All,

 

The next OFA EWG meeting will be on Monday Aug 17th 2015 at 9:00 AM Pacific

 

Monday, August 17, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 3895405


Meeting Minutes 8/3/2015: 

·
https://www.openfabrics.org/downloads/WorkGroups/ewg/EWG_Minutes/2015-08-03-
EWG-Meeting-Minutes.pdf 

 

OFED 3.18-1 status

· Latest daily Build

o
https://www.openfabrics.org/downloads/OFED/ofed-3.18-daily/OFED-3.18-1-20150
809-0136.tgz 

· OFED User Package Status as of 8/17/2015 – updates since 8/3

o   dapl-2.1.6

o   infinipath-psm-3.3-6

o   libfabrics-1.1.0

o   fabtests-1.1.0

o
https://www.openfabrics.org/downloads/WorkGroups/ewg/OFED_User_Package_Statu
s/OFED-User-Package-Status-2015-08-17.pdf 

· OFED 3.18-1 Bug Status as of 8/17/2015

o
https://www.openfabrics.org/downloads/WorkGroups/ewg/OFED_Bugs/OFED-3.xx-Bug
-Status-2015-08-17.pdf 

· OFED 3.18-1 open issues

o   2492 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2492  -
perftest tools enhancement – opened 6/17/2014

o   2544 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2544  –
infinipath-psm won't install with libfabric

§  Both packages have been updated. Can we mark this fixed?

o   2545 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2545  -
ipath compilation fails on SLES11 SP4 and RHEL6.7

§  Woody and Tom: talk it over with the team. If nobody cares then we can
say with will not work on SLES11 SP4 and RHEL6.7. So the decision is not to
build ipath on those two distros. 

§  Should I close this out or will someone from Intel?

o   2547 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2547  –
libibscif and Xeon-phi issues

§  Woody: invalid transport issues – close this bug as a known issue and
will not be fixed 

§  Should I close this out or will someone from Intel?

o   2553 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2553  -
Unable to run UD traffic using qperf 

§  Bug filer has responded to query and waiting for response from
Maintainer.

§  Need to assign to someone other than Dean

o   2555 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2555  -
ib_send_bw –run_infinitely fails to terminate on the server after client
disconnects

§  Maintainer may not have this ready for 3.18-1

o   2559 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2559  -
unexpected CM event 8 error seen on running iwarp traffic after the restart
of iwpmd service 

§  Waiting for new iwpmd from Tatyana

o   2560 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2560  -
OFED_tips.txt section 4 needs updating

o   2561 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2561  -
IPoIB failure after arp cache flush

§  Assigned to ere...@mellanox.com – no action in last month

o   2562 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2562  -
ib_write_bw doesn’t support events

o   2565 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2565  -
compat-rdma can't be built on PPC64 RHEL 7.1 LE environment

§  Do we want to support RHEL 7.1 LE

 

· OFED 3.18-1 - Plans for the next build

o   RHEL 6.7 - done

o   SLES SP4 – done 

o   Bug fixes

o   Other?

 

Open Items

· UNH-IOL – support for EDR products

 

Next Meeting: August 31st 2015

 

Thanks

 

Rupert

Monday, August 31, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 9439609

Monday, September 14, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 4137671

Monday, September 28, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 4211514

Monday, October 12, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 2644474

Monday, October 26, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 6398751

 

 

 

 

___
ewg mailing list
ewg@lists.openfabrics.org
http://lists.openfabrics.org/mailman/listinfo/ewg

Re: [ewg] OFA EWG meeting will be on Monday Aug 17th 2015 at 9:00 AM Pacific

2015-08-17 Thread Bill Boas
EWG Members and Doug,

 

There is an active discussion going on between OFA XWG members and Senior
NetApp Engineering Management and NetApp Corporate counsel about how the EWG
is building OFED releases using upstream modules that are extracted from
upstream and included in OFED RCs. The issue is under what license is the
being done - GPL only? Daual GPL and BSD, or BSD only.

 

NetApp and BSD Foundation both believe the EWG is creating a situation where
OFED has modules in it that are now not dual licensable but GPL only.

 

Please may we address this topic first in the EWG meeting today?

 

Bill.

Bill Boas

510-375-8840

 

From: ewg-boun...@lists.openfabrics.org
[mailto:ewg-boun...@lists.openfabrics.org] On Behalf Of Rupert Dance
Sent: Monday, August 17, 2015 9:47 AM
To: 'OpenFabrics EWG' ewg@lists.openfabrics.org
Subject: [ewg] OFA EWG meeting will be on Monday Aug 17th 2015 at 9:00 AM
Pacific

 

Hi All,

 

The next OFA EWG meeting will be on Monday Aug 17th 2015 at 9:00 AM Pacific

 

Monday, August 17, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 3895405


Meeting Minutes 8/3/2015: 

*
https://www.openfabrics.org/downloads/WorkGroups/ewg/EWG_Minutes/2015-08-03-
EWG-Meeting-Minutes.pdf 

 

OFED 3.18-1 status

* Latest daily Build

o
https://www.openfabrics.org/downloads/OFED/ofed-3.18-daily/OFED-3.18-1-20150
809-0136.tgz 

* OFED User Package Status as of 8/17/2015 - updates since 8/3

o   dapl-2.1.6

o   infinipath-psm-3.3-6

o   libfabrics-1.1.0

o   fabtests-1.1.0

o
https://www.openfabrics.org/downloads/WorkGroups/ewg/OFED_User_Package_Statu
s/OFED-User-Package-Status-2015-08-17.pdf 

* OFED 3.18-1 Bug Status as of 8/17/2015

o
https://www.openfabrics.org/downloads/WorkGroups/ewg/OFED_Bugs/OFED-3.xx-Bug
-Status-2015-08-17.pdf 

* OFED 3.18-1 open issues

o   2492 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2492  -
perftest tools enhancement - opened 6/17/2014

o   2544 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2544  -
infinipath-psm won't install with libfabric

*  Both packages have been updated. Can we mark this fixed?

o   2545 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2545  -
ipath compilation fails on SLES11 SP4 and RHEL6.7

*  Woody and Tom: talk it over with the team. If nobody cares then we can
say with will not work on SLES11 SP4 and RHEL6.7. So the decision is not to
build ipath on those two distros. 

*  Should I close this out or will someone from Intel?

o   2547 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2547  -
libibscif and Xeon-phi issues

*  Woody: invalid transport issues - close this bug as a known issue and
will not be fixed 

*  Should I close this out or will someone from Intel?

o   2553 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2553  -
Unable to run UD traffic using qperf 

*  Bug filer has responded to query and waiting for response from
Maintainer.

*  Need to assign to someone other than Dean

o   2555 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2555  -
ib_send_bw -run_infinitely fails to terminate on the server after client
disconnects

*  Maintainer may not have this ready for 3.18-1

o   2559 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2559  -
unexpected CM event 8 error seen on running iwarp traffic after the restart
of iwpmd service 

*  Waiting for new iwpmd from Tatyana

o   2560 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2560  -
OFED_tips.txt section 4 needs updating

o   2561 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2561  -
IPoIB failure after arp cache flush

*  Assigned to ere...@mellanox.com mailto:ere...@mellanox.com  - no action
in last month

o   2562 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2562  -
ib_write_bw doesn't support events

o   2565 http://bugs.openfabrics.org/bugzilla/show_bug.cgi?id=2565  -
compat-rdma can't be built on PPC64 RHEL 7.1 LE environment

*  Do we want to support RHEL 7.1 LE

 

* OFED 3.18-1 - Plans for the next build

o   RHEL 6.7 - done

o   SLES SP4 - done 

o   Bug fixes

o   Other?

 

Open Items

* UNH-IOL - support for EDR products

 

Next Meeting: August 31st 2015

 

Thanks

 

Rupert

Monday, August 31, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 9439609

Monday, September 14, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 4137671

Monday, September 28, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 4211514

Monday, October 12, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 2644474

Monday, October 26, 2015, 09:00 AM US Pacific Time 
916-356-2663, 8-356-2663, Bridge: 3, Passcode: 6398751

 

 

 

 

___
ewg mailing list
ewg@lists.openfabrics.org
http://lists.openfabrics.org/mailman/listinfo/ewg