[Goanet] RE: Dabolim versus Mopa replacement airport.

2005-09-11 Thread Philip Thomas
[Carlos]

This argument reflects:

1. An unrealistically pessimistic view of Goa's economic prospects.

2. An unrealistic assumption that  all who travel to and from Goa are
masochists.

3. A complete lack of appreciation for the arrival of low cost aviation over
Indian skies.

Cheers!




Re: [Goanet] RE: Dabolim versus Mopa replacement airport.

2005-09-11 Thread carlos6143

Philip Thomas <[EMAIL PROTECTED]> wrote:

The actual sequence should be:



1. Navy should curtail its training flights at Dabolim so that civilian
flights can expand.

Response: Agree

2. Navy should expedite clearance and construction of Seabird airfield 

(6000

feet) and shift its flights to Seabird.

Response: Agree


3. Mopa should begin as a basic domestic airport and evolve over a 

couple of

decades into a mega airport along with Dabolim.
Response: Disagree. If this happens, Dabolim will eventually be closed. 
And the Goans will be coned again.
Why a tiny place like Goa needs a second airport? Are there any studies 
made that Goa needs two airports in the next 25 or 50 years? If Dabolim 
needs extra land for runways, it can be acquired. There is also an 
option of constructing an extension of runways into the sea.


Regards,
Carlos



[Goanet] RE: Dabolim versus Mopa replacement airport.

2005-09-08 Thread Philip Thomas


Not a word in this piece about why the Navy is sitting tight at Dabolim and
not making any headway whatsover with the airfield at Seabird after all
these years and shifting its military flight training to it.

The length of Dabolim's runway  is said to be 11,000 feet, (about the same
as those at Delhi and Mumbai) not meant just for the puddle jumper variety
of planes, right? Dabolim is said to draw 95% of India's charter flights
from abroad and these are not Dakotas. In fact they may be wide bodied jet
aircraft.

Churchill for his part believes that there is enough land for a second
runway at Dabolim thus obviating the need for Mopa.

So what is the real story of Dabolim and its dimensions?

The actual sequence should be:

1. Navy should curtail its training flights at Dabolim so that civilian
flights can expand.

2. Navy should expedite clearance and construction of Seabird airfield (6000
feet) and shift its flights to Seabird.

3. Mopa should begin as a basic domestic airport and evolve over a couple of
decades into a mega airport along with Dabolim.