Please help me in upgarding our production JES2PLEX Checkpoint level from
OS/390 R 4 to z/OS 1.2 level. we are at z/OS 1.4 and
$HASP895 $DACTIVATE
$HASP895 JES2 CHECKPOINT LEVEL IS NOW OS/390 RELEASE 4
$HASP895 A TOTAL OF 1826 4K RECORDS ARE REQUIRED FOR $ACTIVATE.
$*HASP895 CKPT2 IS TOO SMALL BY 27 4K RECORDS. *
$HASP895 $ACTIVATE WILL FAIL IF ISSUED FROM THIS MEMBER
$HASP829 CKPTDEF
$HASP829 CKPTDEF *CKPT1*=(STRNAME=JES_CKPT1,INUSE=YES,
$HASP829 VOLATILE=NO),CKPT2=(DSNAME= SYS1.HASCKPT1,
$HASP829 VOLSER=xx,INUSE=YES,VOLATILE=NO),
$HASP829 NEWCKPT1=(STRNAME=JES_CKPT2),
$HASP829 NEWCKPT2=(DSNAME=SYS1.HASCKPT2 ,VOLSER=xx),
$HASP829 MODE=DUPLEX,DUPLEX=ON,LOGSIZE=8,
$HASP829 VERSIONS=(STATUS=ACTIVE,NUMBER=17,WARN=80,
$HASP829 MAXFAIL=0,NUMFAIL=0,VERSFREE=17,MAXUSED=3),
$HASP829 RECONFIG=NO,VOLATILE=(ONECKPT=WTOR,
$HASP829 ALLCKPT=WTOR),OPVERIFY=NO
So far i have planned to do
a. enter JES2 Checkpoint reconfiguration dialog
b. select option - Suspend NEWCKPT2
c. delete NEWCKPT2 dataset and redfine with additional 15 cylinders
d.select option - Update and start using NEWCKPT2 dataset
repeat step a -to- d for CKPT2 and finally
issue $ACTIVATE command.
Is there any pitfall i need to be aware of? This is our production 24x7
environment and I am doing it dynamically without any COLD START
or OFFLOADING of the spool.
regards, Munif.
--
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html