Hello.
 
We are using pessimistic transaction mode. In this case everything's already 
locked by the time of prepare, is not it?
As of merge, for quorum mode it's simple - take data from quorum. I think I 
will try to simply suppress sending data from non-quorum members on merge. 
Because currently everyone sends it's data and it creates complete mess with 
unsynchronized data after merge (depending on the timing).
 
Best regards, Vitalii Tymchyshyn



From: infinispan-dev-boun...@lists.jboss.org 
[mailto:infinispan-dev-boun...@lists.jboss.org] On Behalf Of Dan Berindei
Sent: Wednesday, June 05, 2013 12:04 PM
To: infinispan -Dev List
Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql




On Mon, Jun 3, 2013 at 4:23 PM, vitalii.tymchys...@ubs.com wrote:


Hello.

Thanks for your information. I will subscribe and vote for the issues 
noted.
In the meantime I've implemented hacky JgroupsTransport that 
downgrades all (but CacheViewControlCommand and StateTransferControlCommand) 
SYNCHRONOUS invokeRemotely calls to SYNCHRONOUS_IGNORE_LEAVERS and checks if 
required number of answers was received with a filter (I've tried to use 
original invokeRemotely return value but it often returns some strange value, 
like empty map). It seems to do the trick for me. But I am still not sure if 
this has any side effects.




Indeed, I started working on a solution, but I over-engineered it and then I 
got side-tracked with other stuff. Sorry about that.


The problem with using SYNCHRONOUS_IGNORE_LEAVERS everywhere, as I found out, 
is that you don't want to ignore the primary owner of a key leaving during a 
prepare/lock command (or the coordinator, in REPL mode prior to 
5.3.0.CR1/ISPN-2772). If that happens, you have to retry on the new primary 
owner, otherwise you can't know if the prepare command has locked the key or 
not.

A similar problem appears in non-transactional caches with 
supportsConcurrentUpdates=true: there the primary owner can ignore any of the 
backup owners leaving, but the originator can't ignore the primary owner 
leaving.

 

For now I can see merge problem in my test: different values are picked 
during merge. I am going to dig a little deeper and follow up. But it's already 
a little strange for me, since the test algorithm is:
1)Assign old value to full cluster (it's REPL_SYNC mode)
2)Block coordinator
3)Writer new value to one of two remaining nodes. It's syncrhonized 
to second remaining node
4)Unblock coordinator
5)Wait (I could not find a good way to wait for state transfer but wait 
in this case).
6)Check the value on coordinator

And in my test I am randomly getting old or new in assert. I am now 
going to check why. May be I will need to reinitialize smaller cluster part 
to ensure data is taken from the quorum part of the cluster.




We don't handle merges properly. See https://issues.jboss.org/browse/ISPN-263 
and the discussion at http://markmail.org/message/meyczotzobuva7js

What happens right now is that after a merge, all the caches are assumed to 
have up-to-date data, so there is no state transfer. We had several ideas 
floating around on how we could force the smaller partition to receive data 
from the quorum partition, but I think with the public API your best option is 
to stop all the caches in the smaller partition after the split and start them 
back up after the merge.


Cheers

Dan


 

Best regards, Vitalii Tymchyshyn


-Original Message-
From: infinispan-dev-boun...@lists.jboss.org 
[mailto:infinispan-dev-boun...@lists.jboss.org] On Behalf Of Galder Zamarreno
Sent: Monday, June 03, 2013 9:04 AM
To: infinispan -Dev List
Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql


On May 30, 2013, at 5:10 PM, vitalii.tymchys...@ubs.com wrote:

 Hello.

 We are going to use Infinispan in our project as NoSQL solution. It
 performs quite well for us, but currently we've faced next problem.
 Note: We are using Infinispan 5.1.6 in SYNC_REPL mode in small 
cluster.
 The problem is that when any node fails, any running transactions wait
 for Jgroups to decide if it've really failed or not and rollback
 because of SuspectException after that. While we can live with a
 delay, we'd really like to skip rolling back. As for me, I actually
 don't see a reason for rollback because transactions started after
 leave will succeed. So, as for me, previously running transactions
 could do the same.

We're aware of the problem (https://issues.jboss.org/browse/ISPN-2402).

@Dan, has there been any updates on this?

 The question for is if node that left

Re: [infinispan-dev] Using infinispan as quorum-based nosql

2013-06-06 Thread Dan Berindei
Say you have two transactions, tx1 and tx2. They both send a
LockControlCommand(k1) to the primary owner of k1 (let's call it B).
If the lock commands use SYNCHRONOUS_IGNORE_LEAVERS and B dies while
processing the commands, both tx1 and tx2 will think they have succeeded in
locking k1.

So you're right, everything should be locked before prepare in pessimistic
mode, but LockControlCommands are also susceptible to SuspectExceptions. On
the other hand, you can use SYNCHRONOUS mode for LockControlCommands and
you can just retry the transaction in case of a SuspectException.

Unfortunately, you can't retry the transaction if the PrepareCommand fails
(in pessimistic mode; or the CommitCommand in optimistic mode), because it
is executed in the commit phase. The transaction manager swallows all the
exceptions in the commit phase, making it impossible to see if it failed
because of a node leaving. I guess this means I should increase the
priority of https://issues.jboss.org/browse/ISPN-2402 ...



On Thu, Jun 6, 2013 at 11:49 AM, vitalii.tymchys...@ubs.com wrote:

 **
 Hello.

 We are using pessimistic transaction mode. In this case everything's
 already locked by the time of prepare, is not it?
 As of merge, for quorum mode it's simple - take data from quorum. I think
 I will try to simply suppress sending data from non-quorum members on
 merge. Because currently everyone sends it's data and it creates complete
 mess with unsynchronized data after merge (depending on the timing).

 Best regards, Vitalii Tymchyshyn

  --
 *From:* infinispan-dev-boun...@lists.jboss.org [mailto:
 infinispan-dev-boun...@lists.jboss.org] *On Behalf Of *Dan Berindei
 *Sent:* Wednesday, June 05, 2013 12:04 PM

 *To:* infinispan -Dev List
 *Subject:* Re: [infinispan-dev] Using infinispan as quorum-based nosql



 On Mon, Jun 3, 2013 at 4:23 PM, vitalii.tymchys...@ubs.com wrote:

 Hello.

 Thanks for your information. I will subscribe and vote for the issues
 noted.
 In the meantime I've implemented hacky JgroupsTransport that downgrades
 all (but CacheViewControlCommand and StateTransferControlCommand)
 SYNCHRONOUS invokeRemotely calls to SYNCHRONOUS_IGNORE_LEAVERS and checks
 if required number of answers was received with a filter (I've tried to use
 original invokeRemotely return value but it often returns some strange
 value, like empty map). It seems to do the trick for me. But I am still not
 sure if this has any side effects.


 Indeed, I started working on a solution, but I over-engineered it and then
 I got side-tracked with other stuff. Sorry about that.

 The problem with using SYNCHRONOUS_IGNORE_LEAVERS everywhere, as I found
 out, is that you don't want to ignore the primary owner of a key leaving
 during a prepare/lock command (or the coordinator, in REPL mode prior to
 5.3.0.CR1/ISPN-2772). If that happens, you have to retry on the new primary
 owner, otherwise you can't know if the prepare command has locked the key
 or not.

 A similar problem appears in non-transactional caches with
 supportsConcurrentUpdates=true: there the primary owner can ignore any of
 the backup owners leaving, but the originator can't ignore the primary
 owner leaving.



 For now I can see merge problem in my test: different values are picked
 during merge. I am going to dig a little deeper and follow up. But it's
 already a little strange for me, since the test algorithm is:
 1)Assign old value to full cluster (it's REPL_SYNC mode)
 2)Block coordinator
 3)Writer new value to one of two remaining nodes. It's syncrhonized to
 second remaining node
 4)Unblock coordinator
 5)Wait (I could not find a good way to wait for state transfer but wait
 in this case).
 6)Check the value on coordinator

 And in my test I am randomly getting old or new in assert. I am now
 going to check why. May be I will need to reinitialize smaller cluster
 part to ensure data is taken from the quorum part of the cluster.


 We don't handle merges properly. See
 https://issues.jboss.org/browse/ISPN-263 and the discussion at
 http://markmail.org/message/meyczotzobuva7js

 What happens right now is that after a merge, all the caches are assumed
 to have up-to-date data, so there is no state transfer. We had several
 ideas floating around on how we could force the smaller partition to
 receive data from the quorum partition, but I think with the public API
 your best option is to stop all the caches in the smaller partition after
 the split and start them back up after the merge.

 Cheers
 Dan



 Best regards, Vitalii Tymchyshyn

 -Original Message-
 From: infinispan-dev-boun...@lists.jboss.org [mailto:
 infinispan-dev-boun...@lists.jboss.org] On Behalf Of Galder Zamarreno
 Sent: Monday, June 03, 2013 9:04 AM
 To: infinispan -Dev List
 Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql


 On May 30, 2013, at 5:10 PM, vitalii.tymchys...@ubs.com wrote:

  Hello.
 
  We are going to use Infinispan in our project as NoSQL

Re: [infinispan-dev] Using infinispan as quorum-based nosql

2013-06-06 Thread vitalii.tymchyshyn
Well, I don't do SYNCHRONOUS_IGNORE_LEAVERS for commands that has less than 
quorumSize number of destinations (so commands to single destination retain 
it's ResponseMode unchanged) and recheck after the command that I still have 
enough member in the cluster. But I will add a test to check that behaviour is 
correct. I am not sure on the next sequence of events:
1) Node A locks key K with lock owner on node X
2) Node X dies
3) Lock ownership moves to node Y
4) Node B locks key K on Y
 
Best regards, Vitalii Tymchyshyn



From: infinispan-dev-boun...@lists.jboss.org 
[mailto:infinispan-dev-boun...@lists.jboss.org] On Behalf Of Dan Berindei
Sent: Thursday, June 06, 2013 5:09 AM
To: infinispan -Dev List
Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql


Say you have two transactions, tx1 and tx2. They both send a 
LockControlCommand(k1) to the primary owner of k1 (let's call it B).

If the lock commands use SYNCHRONOUS_IGNORE_LEAVERS and B dies while processing 
the commands, both tx1 and tx2 will think they have succeeded in locking k1.


So you're right, everything should be locked before prepare in pessimistic 
mode, but LockControlCommands are also susceptible to SuspectExceptions. On the 
other hand, you can use SYNCHRONOUS mode for LockControlCommands and you can 
just retry the transaction in case of a SuspectException. 

Unfortunately, you can't retry the transaction if the PrepareCommand fails (in 
pessimistic mode; or the CommitCommand in optimistic mode), because it is 
executed in the commit phase. The transaction manager swallows all the 
exceptions in the commit phase, making it impossible to see if it failed 
because of a node leaving. I guess this means I should increase the priority of 
https://issues.jboss.org/browse/ISPN-2402 ...




On Thu, Jun 6, 2013 at 11:49 AM, vitalii.tymchys...@ubs.com wrote:



Hello.
 
We are using pessimistic transaction mode. In this case everything's 
already locked by the time of prepare, is not it?
As of merge, for quorum mode it's simple - take data from quorum. I 
think I will try to simply suppress sending data from non-quorum members on 
merge. Because currently everyone sends it's data and it creates complete mess 
with unsynchronized data after merge (depending on the timing).
 
Best regards, Vitalii Tymchyshyn



From: infinispan-dev-boun...@lists.jboss.org 
[mailto:infinispan-dev-boun...@lists.jboss.org] On Behalf Of Dan Berindei
Sent: Wednesday, June 05, 2013 12:04 PM 

To: infinispan -Dev List
Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql




On Mon, Jun 3, 2013 at 4:23 PM, vitalii.tymchys...@ubs.com wrote:


Hello.

Thanks for your information. I will subscribe and vote for the 
issues noted.
In the meantime I've implemented hacky JgroupsTransport that 
downgrades all (but CacheViewControlCommand and StateTransferControlCommand) 
SYNCHRONOUS invokeRemotely calls to SYNCHRONOUS_IGNORE_LEAVERS and checks if 
required number of answers was received with a filter (I've tried to use 
original invokeRemotely return value but it often returns some strange value, 
like empty map). It seems to do the trick for me. But I am still not sure if 
this has any side effects.




Indeed, I started working on a solution, but I over-engineered it and 
then I got side-tracked with other stuff. Sorry about that.


The problem with using SYNCHRONOUS_IGNORE_LEAVERS everywhere, as I 
found out, is that you don't want to ignore the primary owner of a key leaving 
during a prepare/lock command (or the coordinator, in REPL mode prior to 
5.3.0.CR1/ISPN-2772). If that happens, you have to retry on the new primary 
owner, otherwise you can't know if the prepare command has locked the key or 
not.

A similar problem appears in non-transactional caches with 
supportsConcurrentUpdates=true: there the primary owner can ignore any of the 
backup owners leaving, but the originator can't ignore the primary owner 
leaving.

 

For now I can see merge problem in my test: different values 
are picked during merge. I am going to dig a little deeper and follow up. But 
it's already a little strange for me, since the test algorithm is:
1)Assign old value to full cluster (it's REPL_SYNC mode)
2)Block coordinator
3)Writer new value to one of two remaining nodes. It's 
syncrhonized to second remaining node
4)Unblock coordinator
5)Wait (I could not find a good way to wait for state transfer 
but wait in this case).
6)Check the value on coordinator

And in my test I am randomly getting

Re: [infinispan-dev] Using infinispan as quorum-based nosql

2013-06-06 Thread Mircea Markus

On 6 Jun 2013, at 10:09, Dan Berindei dan.berin...@gmail.com wrote:

 Say you have two transactions, tx1 and tx2. They both send a 
 LockControlCommand(k1) to the primary owner of k1 (let's call it B).
 If the lock commands use SYNCHRONOUS_IGNORE_LEAVERS and B dies while 
 processing the commands, both tx1 and tx2 will think they have succeeded in 
 locking k1.
 
 So you're right, everything should be locked before prepare in pessimistic 
 mode, but LockControlCommands are also susceptible to SuspectExceptions. On 
 the other hand, you can use SYNCHRONOUS mode for LockControlCommands and you 
 can just retry the transaction in case of a SuspectException. 
 
 Unfortunately, you can't retry the transaction if the PrepareCommand fails 
 (in pessimistic mode; or the CommitCommand in optimistic mode), because it is 
 executed in the commit phase. The transaction manager swallows all the 
 exceptions in the commit phase, making it impossible to see if it failed 
 because of a node leaving. I guess this means I should increase the priority 
 of https://issues.jboss.org/browse/ISPN-2402 ...
+1 for increasing the priority. A bit too late for 5.3.0 stream though, as this 
is a rather large change.
Cheers,
-- 
Mircea Markus
Infinispan lead (www.infinispan.org)





___
infinispan-dev mailing list
infinispan-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/infinispan-dev


Re: [infinispan-dev] Using infinispan as quorum-based nosql

2013-06-05 Thread Dan Berindei
On Mon, Jun 3, 2013 at 4:23 PM, vitalii.tymchys...@ubs.com wrote:

 Hello.

 Thanks for your information. I will subscribe and vote for the issues
 noted.
 In the meantime I've implemented hacky JgroupsTransport that downgrades
 all (but CacheViewControlCommand and StateTransferControlCommand)
 SYNCHRONOUS invokeRemotely calls to SYNCHRONOUS_IGNORE_LEAVERS and checks
 if required number of answers was received with a filter (I've tried to use
 original invokeRemotely return value but it often returns some strange
 value, like empty map). It seems to do the trick for me. But I am still not
 sure if this has any side effects.


Indeed, I started working on a solution, but I over-engineered it and then
I got side-tracked with other stuff. Sorry about that.

The problem with using SYNCHRONOUS_IGNORE_LEAVERS everywhere, as I found
out, is that you don't want to ignore the primary owner of a key leaving
during a prepare/lock command (or the coordinator, in REPL mode prior to
5.3.0.CR1/ISPN-2772). If that happens, you have to retry on the new primary
owner, otherwise you can't know if the prepare command has locked the key
or not.

A similar problem appears in non-transactional caches with
supportsConcurrentUpdates=true: there the primary owner can ignore any of
the backup owners leaving, but the originator can't ignore the primary
owner leaving.



 For now I can see merge problem in my test: different values are picked
 during merge. I am going to dig a little deeper and follow up. But it's
 already a little strange for me, since the test algorithm is:
 1)Assign old value to full cluster (it's REPL_SYNC mode)
 2)Block coordinator
 3)Writer new value to one of two remaining nodes. It's syncrhonized to
 second remaining node
 4)Unblock coordinator
 5)Wait (I could not find a good way to wait for state transfer but wait in
 this case).
 6)Check the value on coordinator

 And in my test I am randomly getting old or new in assert. I am now
 going to check why. May be I will need to reinitialize smaller cluster
 part to ensure data is taken from the quorum part of the cluster.


We don't handle merges properly. See
https://issues.jboss.org/browse/ISPN-263 and the discussion at
http://markmail.org/message/meyczotzobuva7js

What happens right now is that after a merge, all the caches are assumed to
have up-to-date data, so there is no state transfer. We had several ideas
floating around on how we could force the smaller partition to receive data
from the quorum partition, but I think with the public API your best option
is to stop all the caches in the smaller partition after the split and
start them back up after the merge.

Cheers
Dan



 Best regards, Vitalii Tymchyshyn

 -Original Message-
 From: infinispan-dev-boun...@lists.jboss.org [mailto:
 infinispan-dev-boun...@lists.jboss.org] On Behalf Of Galder Zamarreno
 Sent: Monday, June 03, 2013 9:04 AM
 To: infinispan -Dev List
 Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql


 On May 30, 2013, at 5:10 PM, vitalii.tymchys...@ubs.com wrote:

  Hello.
 
  We are going to use Infinispan in our project as NoSQL solution. It
  performs quite well for us, but currently we've faced next problem.
  Note: We are using Infinispan 5.1.6 in SYNC_REPL mode in small cluster.
  The problem is that when any node fails, any running transactions wait
  for Jgroups to decide if it've really failed or not and rollback
  because of SuspectException after that. While we can live with a
  delay, we'd really like to skip rolling back. As for me, I actually
  don't see a reason for rollback because transactions started after
  leave will succeed. So, as for me, previously running transactions
  could do the same.

 We're aware of the problem (https://issues.jboss.org/browse/ISPN-2402).

 @Dan, has there been any updates on this?

  The question for is if node that left will synchronize it's state
  after merge (even if merge was done without infinispan restart). As
  for me, it should or it won't work correctly at all.

 This is not in yet: https://issues.jboss.org/browse/ISPN-263

  So, I've found RpcManager's ResponseMode.SYNCHRONOUS_IGNORE_LEAVERS
  and think on switching to it for RpcManager calls that don't specify
  ResponseMode explicitly. As for me, it should do the trick. Also, I am
  going to enforce Quorum number of reponses, but that's another story.
  So, how do you think, would it work?

 ^ Not sure if that'll work. @Dan?

  P.S. Another Q for me, how does it work now, when SuspectException is
  thrown from CommitCommand broadcasting. Af far as I can see, commit is
  still done on some remote nodes (that are still in the cluster), but
  rolled back on local node because of this exception. Am I correct?

 ^ How Infinispan reacts in these situations depends a lot on the type of
 communications (synchronous or asynchronous) and the transaction
 configuration. Mircea can provide more details on this.

 Cheers,

  This
  can cause inconsistencies

Re: [infinispan-dev] Using infinispan as quorum-based nosql

2013-06-03 Thread Galder Zamarreño

On May 30, 2013, at 5:10 PM, vitalii.tymchys...@ubs.com wrote:

 Hello.
 
 We are going to use Infinispan in our project as NoSQL solution. It
 performs quite well for us, but currently we've faced next problem.
 Note: We are using Infinispan 5.1.6 in SYNC_REPL mode in small cluster.
 The problem is that when any node fails, any running transactions wait
 for Jgroups to decide if it've really failed or not and rollback because
 of SuspectException after that. While we can live with a delay, we'd
 really like to skip rolling back. As for me, I actually don't see a
 reason for rollback because transactions started after leave will
 succeed. So, as for me, previously running transactions could do the
 same.

We're aware of the problem (https://issues.jboss.org/browse/ISPN-2402).

@Dan, has there been any updates on this?

 The question for is if node that left will synchronize it's state after
 merge (even if merge was done without infinispan restart). As for me, it
 should or it won't work correctly at all.

This is not in yet: https://issues.jboss.org/browse/ISPN-263

 So, I've found RpcManager's ResponseMode.SYNCHRONOUS_IGNORE_LEAVERS and
 think on switching to it for RpcManager calls that don't specify
 ResponseMode explicitly. As for me, it should do the trick. Also, I am
 going to enforce Quorum number of reponses, but that's another story.
 So, how do you think, would it work?

^ Not sure if that'll work. @Dan?

 P.S. Another Q for me, how does it work now, when SuspectException is
 thrown from CommitCommand broadcasting. Af far as I can see, commit is
 still done on some remote nodes (that are still in the cluster), but
 rolled back on local node because of this exception. Am I correct?

^ How Infinispan reacts in these situations depends a lot on the type of 
communications (synchronous or asynchronous) and the transaction configuration. 
Mircea can provide more details on this.

Cheers,

 This
 can cause inconsistencies, but we must leave with something in
 peer-to-peer world :) The only other option is to switch from write-all,
 read-local to write-quorum, read-quorum scenario that is too complex
 move for Infinispan as for me.
 
 Best regards, Vitalii Tymchyshyn
 
 Please visit our website at 
 http://financialservicesinc.ubs.com/wealth/E-maildisclaimer.html 
 for important disclosures and information about our e-mail 
 policies. For your protection, please do not transmit orders 
 or instructions by e-mail or include account numbers, Social 
 Security numbers, credit card numbers, passwords, or other 
 personal information.
 
 ___
 infinispan-dev mailing list
 infinispan-dev@lists.jboss.org
 https://lists.jboss.org/mailman/listinfo/infinispan-dev


--
Galder Zamarreño
gal...@redhat.com
twitter.com/galderz

Project Lead, Escalante
http://escalante.io

Engineer, Infinispan
http://infinispan.org


___
infinispan-dev mailing list
infinispan-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/infinispan-dev


Re: [infinispan-dev] Using infinispan as quorum-based nosql

2013-06-03 Thread vitalii.tymchyshyn
Hello.

Thanks for your information. I will subscribe and vote for the issues noted.
In the meantime I've implemented hacky JgroupsTransport that downgrades all 
(but CacheViewControlCommand and StateTransferControlCommand) SYNCHRONOUS 
invokeRemotely calls to SYNCHRONOUS_IGNORE_LEAVERS and checks if required 
number of answers was received with a filter (I've tried to use original 
invokeRemotely return value but it often returns some strange value, like empty 
map). It seems to do the trick for me. But I am still not sure if this has any 
side effects.

For now I can see merge problem in my test: different values are picked during 
merge. I am going to dig a little deeper and follow up. But it's already a 
little strange for me, since the test algorithm is:
1)Assign old value to full cluster (it's REPL_SYNC mode)
2)Block coordinator
3)Writer new value to one of two remaining nodes. It's syncrhonized to second 
remaining node
4)Unblock coordinator
5)Wait (I could not find a good way to wait for state transfer but wait in this 
case).
6)Check the value on coordinator

And in my test I am randomly getting old or new in assert. I am now going 
to check why. May be I will need to reinitialize smaller cluster part to 
ensure data is taken from the quorum part of the cluster.

Best regards, Vitalii Tymchyshyn

-Original Message-
From: infinispan-dev-boun...@lists.jboss.org 
[mailto:infinispan-dev-boun...@lists.jboss.org] On Behalf Of Galder Zamarreno
Sent: Monday, June 03, 2013 9:04 AM
To: infinispan -Dev List
Subject: Re: [infinispan-dev] Using infinispan as quorum-based nosql


On May 30, 2013, at 5:10 PM, vitalii.tymchys...@ubs.com wrote:

 Hello.
 
 We are going to use Infinispan in our project as NoSQL solution. It 
 performs quite well for us, but currently we've faced next problem.
 Note: We are using Infinispan 5.1.6 in SYNC_REPL mode in small cluster.
 The problem is that when any node fails, any running transactions wait 
 for Jgroups to decide if it've really failed or not and rollback 
 because of SuspectException after that. While we can live with a 
 delay, we'd really like to skip rolling back. As for me, I actually 
 don't see a reason for rollback because transactions started after 
 leave will succeed. So, as for me, previously running transactions 
 could do the same.

We're aware of the problem (https://issues.jboss.org/browse/ISPN-2402).

@Dan, has there been any updates on this?

 The question for is if node that left will synchronize it's state 
 after merge (even if merge was done without infinispan restart). As 
 for me, it should or it won't work correctly at all.

This is not in yet: https://issues.jboss.org/browse/ISPN-263

 So, I've found RpcManager's ResponseMode.SYNCHRONOUS_IGNORE_LEAVERS 
 and think on switching to it for RpcManager calls that don't specify 
 ResponseMode explicitly. As for me, it should do the trick. Also, I am 
 going to enforce Quorum number of reponses, but that's another story.
 So, how do you think, would it work?

^ Not sure if that'll work. @Dan?

 P.S. Another Q for me, how does it work now, when SuspectException is 
 thrown from CommitCommand broadcasting. Af far as I can see, commit is 
 still done on some remote nodes (that are still in the cluster), but 
 rolled back on local node because of this exception. Am I correct?

^ How Infinispan reacts in these situations depends a lot on the type of 
communications (synchronous or asynchronous) and the transaction configuration. 
Mircea can provide more details on this.

Cheers,

 This
 can cause inconsistencies, but we must leave with something in 
 peer-to-peer world :) The only other option is to switch from 
 write-all, read-local to write-quorum, read-quorum scenario that is 
 too complex move for Infinispan as for me.
 
 Best regards, Vitalii Tymchyshyn
 
 Please visit our website at
 http://financialservicesinc.ubs.com/wealth/E-maildisclaimer.html
 for important disclosures and information about our e-mail policies. 
 For your protection, please do not transmit orders or instructions by 
 e-mail or include account numbers, Social Security numbers, credit 
 card numbers, passwords, or other personal information.
 
 ___
 infinispan-dev mailing list
 infinispan-dev@lists.jboss.org
 https://lists.jboss.org/mailman/listinfo/infinispan-dev


--
Galder Zamarreño
gal...@redhat.com
twitter.com/galderz

Project Lead, Escalante
http://escalante.io

Engineer, Infinispan
http://infinispan.org


___
infinispan-dev mailing list
infinispan-dev@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/infinispan-dev
Please visit our website at 
http://financialservicesinc.ubs.com/wealth/E-maildisclaimer.html 
for important disclosures and information about our e-mail 
policies. For your protection, please do not transmit orders 
or instructions by e-mail or include account numbers, Social 
Security numbers, credit card