[jira] [Updated] (AMBARI-25443) Create principal/keytab operation with multi threaded

2019-12-09 Thread Dmytro Grinenko (Jira)


 [ 
https://issues.apache.org/jira/browse/AMBARI-25443?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Dmytro Grinenko updated AMBARI-25443:
-
Resolution: Fixed
Status: Resolved  (was: Patch Available)

> Create principal/keytab operation with multi threaded
> -
>
> Key: AMBARI-25443
> URL: https://issues.apache.org/jira/browse/AMBARI-25443
> Project: Ambari
>  Issue Type: Improvement
>  Components: ambari-server
>Affects Versions: 2.6.2
>Reporter: Dmytro Grinenko
>Assignee: Dmytro Grinenko
>Priority: Critical
>  Labels: pull-request-available
> Fix For: 2.6.2
>
>  Time Spent: 50m
>  Remaining Estimate: 0h
>
> Ambari Principal and keytabs create operation runs in sequential manner, 
> which taking a lot of time on a large cluster.
> To cut the time, each step should be palatalized between cluster nodes.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)


[jira] [Updated] (AMBARI-25443) Create principal/keytab operation with multi threaded

2019-12-09 Thread Dmytro Grinenko (Jira)


 [ 
https://issues.apache.org/jira/browse/AMBARI-25443?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Dmytro Grinenko updated AMBARI-25443:
-
Status: Patch Available  (was: In Progress)

> Create principal/keytab operation with multi threaded
> -
>
> Key: AMBARI-25443
> URL: https://issues.apache.org/jira/browse/AMBARI-25443
> Project: Ambari
>  Issue Type: Improvement
>  Components: ambari-server
>Affects Versions: 2.6.2
>Reporter: Dmytro Grinenko
>Assignee: Dmytro Grinenko
>Priority: Critical
>  Labels: pull-request-available
> Fix For: 2.6.2
>
>  Time Spent: 10m
>  Remaining Estimate: 0h
>
> Ambari Principal and keytabs create operation runs in sequential manner, 
> which taking a lot of time on a large cluster.
> To cut the time, each step should be palatalized between cluster nodes.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)


[jira] [Updated] (AMBARI-25443) Create principal/keytab operation with multi threaded

2019-12-09 Thread ASF GitHub Bot (Jira)


 [ 
https://issues.apache.org/jira/browse/AMBARI-25443?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated AMBARI-25443:

Labels: pull-request-available  (was: )

> Create principal/keytab operation with multi threaded
> -
>
> Key: AMBARI-25443
> URL: https://issues.apache.org/jira/browse/AMBARI-25443
> Project: Ambari
>  Issue Type: Improvement
>  Components: ambari-server
>Affects Versions: 2.6.2
>Reporter: Dmytro Grinenko
>Assignee: Dmytro Grinenko
>Priority: Critical
>  Labels: pull-request-available
> Fix For: 2.6.2
>
>
> Ambari Principal and keytabs create operation runs in sequential manner, 
> which taking a lot of time on a large cluster.
> To cut the time, each step should be palatalized between cluster nodes.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)