[ https://issues.apache.org/jira/browse/GEODE-1378?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dan Smith resolved GEODE-1378. ------------------------------ Resolution: Fixed > checkMissedTests launches dunit VMs, takes time > ----------------------------------------------- > > Key: GEODE-1378 > URL: https://issues.apache.org/jira/browse/GEODE-1378 > Project: Geode > Issue Type: Bug > Components: build, tests > Reporter: Dan Smith > Assignee: Dan Smith > > The checkMissedTests target actually triggers the launch of dunit VMs, even > though no tests are run (normally). > I think this has to do with how the dunit framework is written and how we are > using categories. > For junit 4 tests, we are launching the dunit framework from a BeforeClass in > JUnit4DistributedTest method. For unit 3 tests, we launch the dunit framework > from with the constructor of Junt3DistributedTests. > I think junit is calling one of these things (probably the junit 3 > contructor) when it is determining the categories of the tests. That's > causing the checkMissedTests target to launch all of the dunit VMs even > though it doesn't run the tests. -- This message was sent by Atlassian JIRA (v6.3.4#6332)