[jira] [Updated] (HBASE-25998) Revisit synchronization in SyncFuture

2021-06-11 Thread Bharath Vissapragada (Jira)


 [ 
https://issues.apache.org/jira/browse/HBASE-25998?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Bharath Vissapragada updated HBASE-25998:
-
Attachment: monitor-overhead-2.png
monitor-overhead-1.png

> Revisit synchronization in SyncFuture
> -
>
> Key: HBASE-25998
> URL: https://issues.apache.org/jira/browse/HBASE-25998
> Project: HBase
>  Issue Type: Improvement
>  Components: Performance, regionserver, wal
>Affects Versions: 3.0.0-alpha-1, 1.7.0, 2.5.0
>Reporter: Bharath Vissapragada
>Assignee: Bharath Vissapragada
>Priority: Major
> Attachments: monitor-overhead-1.png, monitor-overhead-2.png
>
>
> While working on HBASE-25984, I noticed some weird frames in the flame graphs 
> around monitor entry exit consuming a lot of CPU cycles (see attached 
> images). Noticed that the synchronization there is too coarse grained and 
> sometimes unnecessary. I did a simple patch that switched to a reentrant lock 
> based synchronization with condition variable rather than a busy wait and 
> that showed 70-80% increased throughput in WAL PE. Seems too good to be 
> true.. (more details in the comments).



--
This message was sent by Atlassian Jira
(v8.3.4#803005)


[jira] [Updated] (HBASE-25998) Revisit synchronization in SyncFuture

2021-06-11 Thread Bharath Vissapragada (Jira)


 [ 
https://issues.apache.org/jira/browse/HBASE-25998?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Bharath Vissapragada updated HBASE-25998:
-
Status: Patch Available  (was: Open)

> Revisit synchronization in SyncFuture
> -
>
> Key: HBASE-25998
> URL: https://issues.apache.org/jira/browse/HBASE-25998
> Project: HBase
>  Issue Type: Improvement
>  Components: Performance, regionserver, wal
>Affects Versions: 3.0.0-alpha-1, 1.7.0, 2.5.0
>Reporter: Bharath Vissapragada
>Assignee: Bharath Vissapragada
>Priority: Major
> Attachments: monitor-overhead-1.png, monitor-overhead-2.png
>
>
> While working on HBASE-25984, I noticed some weird frames in the flame graphs 
> around monitor entry exit consuming a lot of CPU cycles (see attached 
> images). Noticed that the synchronization there is too coarse grained and 
> sometimes unnecessary. I did a simple patch that switched to a reentrant lock 
> based synchronization with condition variable rather than a busy wait and 
> that showed 70-80% increased throughput in WAL PE. Seems too good to be 
> true.. (more details in the comments).



--
This message was sent by Atlassian Jira
(v8.3.4#803005)


[jira] [Updated] (HBASE-25998) Revisit synchronization in SyncFuture

2021-06-18 Thread Bharath Vissapragada (Jira)


 [ 
https://issues.apache.org/jira/browse/HBASE-25998?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Bharath Vissapragada updated HBASE-25998:
-
Fix Version/s: 2.4.5
   2.3.6
   2.5.0
   3.0.0-alpha-1
   Resolution: Fixed
   Status: Resolved  (was: Patch Available)

> Revisit synchronization in SyncFuture
> -
>
> Key: HBASE-25998
> URL: https://issues.apache.org/jira/browse/HBASE-25998
> Project: HBase
>  Issue Type: Improvement
>  Components: Performance, regionserver, wal
>Affects Versions: 3.0.0-alpha-1, 1.7.0, 2.5.0
>Reporter: Bharath Vissapragada
>Assignee: Bharath Vissapragada
>Priority: Major
> Fix For: 3.0.0-alpha-1, 2.5.0, 2.3.6, 2.4.5
>
> Attachments: monitor-overhead-1.png, monitor-overhead-2.png
>
>
> While working on HBASE-25984, I noticed some weird frames in the flame graphs 
> around monitor entry exit consuming a lot of CPU cycles (see attached 
> images). Noticed that the synchronization there is too coarse grained and 
> sometimes unnecessary. I did a simple patch that switched to a reentrant lock 
> based synchronization with condition variable rather than a busy wait and 
> that showed 70-80% increased throughput in WAL PE. Seems too good to be 
> true.. (more details in the comments).



--
This message was sent by Atlassian Jira
(v8.3.4#803005)