[jira] [Work logged] (HIVE-26210) Fix tests for Cleaner failed attempt threshold

2022-05-09 Thread ASF GitHub Bot (Jira)


 [ 
https://issues.apache.org/jira/browse/HIVE-26210?focusedWorklogId=767813&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-767813
 ]

ASF GitHub Bot logged work on HIVE-26210:
-

Author: ASF GitHub Bot
Created on: 09/May/22 07:25
Start Date: 09/May/22 07:25
Worklog Time Spent: 10m 
  Work Description: veghlaci05 opened a new pull request, #3274:
URL: https://github.com/apache/hive/pull/3274

   ### What changes were proposed in this pull request?
   This PR fixes the flaky tests created for HIVE-25943.
   
   
   ### Why are the changes needed?
   The test introduced in HIVE-25943 were flaky.
   
   
   ### Does this PR introduce _any_ user-facing change?
   No
   
   ### How was this patch tested?
   Tested manually.




Issue Time Tracking
---

Worklog Id: (was: 767813)
Remaining Estimate: 0h
Time Spent: 10m

> Fix tests for Cleaner failed attempt threshold
> --
>
> Key: HIVE-26210
> URL: https://issues.apache.org/jira/browse/HIVE-26210
> Project: Hive
>  Issue Type: Bug
>Reporter: László Végh
>Priority: Major
>  Time Spent: 10m
>  Remaining Estimate: 0h
>




--
This message was sent by Atlassian Jira
(v8.20.7#820007)


[jira] [Work logged] (HIVE-26210) Fix tests for Cleaner failed attempt threshold

2022-05-26 Thread ASF GitHub Bot (Jira)


 [ 
https://issues.apache.org/jira/browse/HIVE-26210?focusedWorklogId=774956&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-774956
 ]

ASF GitHub Bot logged work on HIVE-26210:
-

Author: ASF GitHub Bot
Created on: 26/May/22 09:30
Start Date: 26/May/22 09:30
Worklog Time Spent: 10m 
  Work Description: deniskuzZ merged PR #3274:
URL: https://github.com/apache/hive/pull/3274




Issue Time Tracking
---

Worklog Id: (was: 774956)
Time Spent: 20m  (was: 10m)

> Fix tests for Cleaner failed attempt threshold
> --
>
> Key: HIVE-26210
> URL: https://issues.apache.org/jira/browse/HIVE-26210
> Project: Hive
>  Issue Type: Bug
>Reporter: László Végh
>Priority: Major
>  Labels: pull-request-available
>  Time Spent: 20m
>  Remaining Estimate: 0h
>




--
This message was sent by Atlassian Jira
(v8.20.7#820007)