[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-06-22 Thread thomasmfie...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Fields closed an issue as Fixed 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 Jenkins /  JENKINS-28263 
 
 
 
  Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Fields 
 
 
 

Status:
 
 Open Closed 
 
 
 

Resolution:
 
 Fixed 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-06-22 Thread thomasmfie...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Fields commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
It was the This build is parameterized bit of the downstream job that I was missing. This works just fine now. Thanks. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-06-19 Thread harche...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Mathieu Cantin commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
This works for me.  Ex of predefined parameter:  
On the downstream job you have a parameter, ex:  
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-06-19 Thread harche...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Mathieu Cantin updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 Jenkins /  JENKINS-28263 
 
 
 
  Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 

Change By:
 
 Mathieu Cantin 
 
 
 

Attachment:
 
 Parameterized.png 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-06-19 Thread harche...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Mathieu Cantin updated an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 Jenkins /  JENKINS-28263 
 
 
 
  Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 

Change By:
 
 Mathieu Cantin 
 
 
 

Attachment:
 
 Predefinedparameters.png 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-05-28 Thread thomasmfie...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Fields commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
Could anyone confirm if this is indeed a bug? 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-05-18 Thread thomasmfie...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Fields commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
My predefined parameters are specified like you said but in the downstream phase if I enter: 
$P4_CHANGELIST in the P4 Label field I get: 
[Jenkins] $ p4 -s changes -s submitted -m 1 //Jenkins_External/...@$P4_CHANGELIST [Jenkins] $ p4 -s changes -s submitted //Jenkins_External/...@223146,@-1 No changes found.  [External] has no changes since last build, so it will be skipped. 
Note: I was expecting @$P4_CHANGELIST to be converted to a changelist number in this instance. 
and if I specify $ {P4_CHANGELIST} in the P4 Label field I get:  FATAL: ${P4_CHANGELIST} 
: Found unresolved macro at '$ {P4_CHANGELIST}' ${P4_CHANGELIST} 
Are you certain this functionality works? Could you test it locally? 
Thanks 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-05-15 Thread bren...@letrabb.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Brantone commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
Yes, if each job in the phase has predefined parameters you could pass `P4_CHANGELIST=$P4_CHANGELIST` then the downstream job uses that in it's P4 Label field. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-05-15 Thread thomasmfie...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Fields commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
Thanks for your reply. 
Each of my phases is doing a sync which is why it's important to use the same CL number. 
I tried using the $P4_CHANGELIST but it didn't seem to work. How do I pass it through to the next phase? In the MultiJob Phase section of the job what do I need to add? Is it predefined parameters? 
Thanks. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-05-12 Thread bren...@letrabb.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Brantone commented on  JENKINS-28263 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
  Re: Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 
 
Does that mean the next phase is doing another sync? Does the parent job also do a p4 sync? If that's the case, why not just pass the $P4_CHANGELIST parameter, and in the plugin, set the P4 label to $P4_CHANGELIST? 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.2#64017-sha1:e244265) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups Jenkins Issues group.
To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-issues+unsubscr...@googlegroups.com.
For more options, visit https://groups.google.com/d/optout.


[JIRA] [multijob-plugin] (JENKINS-28263) Use same changeset number for all phases

2015-05-06 Thread thomasmfie...@gmail.com (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Fields created an issue 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 Jenkins /  JENKINS-28263 
 
 
 
  Use same changeset number for all phases  
 
 
 
 
 
 
 
 
 

Issue Type:
 
  Improvement 
 
 
 

Assignee:
 

 Unassigned 
 
 
 

Components:
 

 multijob-plugin 
 
 
 

Created:
 

 06/May/15 1:37 PM 
 
 
 

Priority:
 
  Major 
 
 
 

Reporter:
 
 Thomas Fields 
 
 
 
 
 
 
 
 
 
 
Hi there, 
I've recently started using the multijob plugin and so far so good. 
I'm using it with the Perforce plugin and I was wondering if there is any way to use the changeset number for all phases of the job? 
I have a scenario where, the first phase runs, takes a long time and in the mean time there's been another check-in, which the next phase picks up when I don't want it to. 
Cheers, Tom 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment