> What voltage and amperage does it need? >From GC22-7102 (the physical planning guide):
For the CPU, 2 separate 220VAC 30 amp 3 phase circuits for the primary frame, plus an additional 220VAC 30 amp circuit if you have the channel expansion frame, plus a 110VAC 15A service tool circuit nearby. All circuits need R&S 9P34U0 waterproof connectors. ---------------------------------------------------------------------- For LINUX-390 subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: INFO LINUX-390 or visit http://www.marist.edu/htbin/wlvindex?LINUX-390