> What voltage and amperage does it need?

>From GC22-7102 (the physical planning guide):

For the CPU, 2 separate 220VAC 30 amp 3 phase circuits for the primary
frame, plus an additional 220VAC 30 amp circuit if you have the channel
expansion frame, plus a 110VAC 15A service tool circuit nearby. All
circuits need R&S 9P34U0 waterproof connectors.

----------------------------------------------------------------------
For LINUX-390 subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: INFO LINUX-390 or visit
http://www.marist.edu/htbin/wlvindex?LINUX-390

Reply via email to