Re: Looking for your thoughts, please

2004-02-05 Thread Glen Shubert

Dave,

We use DASD logging, and then let DFHSM migrate the archive logs to tape after 1 day.  They are kept for 14 days and then rolled off.  We found this to be a much cleaner process and don't fill up the DASD or use unnecessary tapes.  We modeled the migrate off of our IMS and DB2 archives.

Glen Shubert
[EMAIL PROTECTED]
Associate Director
TSYS - MQSeries Technical Support







"Williams, Dave (Systems Management)" <[EMAIL PROTECTED]>
Sent by: MQSeries List <[EMAIL PROTECTED]>
02/05/04 08:51
Please respond to MQSeries List


        
        To:        [EMAIL PROTECTED]
        cc:        
        Subject:        Looking for your thoughts, please

Presently, one of our more active QMGRs is set up w/four primary and secondary logs – each 1000 cyls. We then archive to tape. The size of the logs and the all over process is performing well. However, management has raised the issue of when we have to apply maintenance to our tape system we are required to quiesce MQ, for fear that the logs will fill, archiving (tape system down) won't work and we'll be in a fine mess. And during even non-peak times the logs switch often.
We could 1) go to DASD archiving, but it seems to me a lot of resource required in pool DASD – plus it would still have to archive to tape in time (which I don't think would be long) anyway. 2) Switch to DASD archiving only during these maint. periods, but this requires a sort of baby sitting approach – make the parm change, keep an eye on the archives filling up…  kind of a drag. 3) Stay as we are (I like this one) – just ensure that the tape maint. is done during our usual bi-weekly maint. window. 
Your thoughts are appreciated – since we've increased the number of and resized our logs the whole process has been problem free and very smooth. 
Thanks, 
Dave       


The information contained in this communication (including any attachments hereto) is confidential and is intended solely for the personal and confidential use of the individual or entity to whom it is addressed.  The information may also constitute a legally privileged confidential communication.  If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this communication in error and that any review, dissemination, copying, or unauthorized use of this information, or the taking of any action in reliance on the contents of this information is strictly prohibited.  If you have received this communication in error, please notify us immediately by e-mail, and delete the original message.  Thank you

Re: Looking for your thoughts, please

2004-02-05 Thread Bright, Frank
Title: Message





Dave
 
Archive to properly sized DASD SMS managed pool and let DFHSM
migrate to compressed tape directly is one option.
 
This
will work for what you need.
 
Best
of luck
Frank 

   -Original
  Message-From: MQSeries List [mailto:[EMAIL PROTECTED]
  On Behalf Of Williams, Dave (Systems Management)Sent:
  Thursday, February 05, 2004 8:51 AMTo:
  [EMAIL PROTECTED]Subject: Looking for your thoughts,
  please
  Presently, one
  of our more active QMGRs is set up w/four primary and
  secondary logs - each
  1000 cyls. We then archive to tape. The size of the logs and the all over
  process is performing well. However,
  management has raised the issue of when we have to apply maintenance to our
  tape system we are required
  to quiesce MQ, for fear that
  the logs will fill, archiving (tape system down) won't
  work and we'll be in a fine mess. And during even non-peak times the logs
  switch often.
  We could
  1) go to DASD archiving, but
  it seems to me a lot
  of resource required in pool DASD - plus
  it would still have to archive to tape in time (which I don't
  think would be long) anyway. 2) Switch to DASD archiving only during these
  maint. periods, but this requires
  a sort of baby sitting approach - make the parm change, keep
  an eye on the archives filling up...  kind of a drag. 3)
  Stay as we are (I like this one) - just ensure that the tape
  maint. is done
  during our usual bi-weekly maint. window. 
  Your
  thoughts are appreciated - since we've increased the number of
  and resized
  our logs the whole process has
  been problem free and very smooth.
  
  Thanks,
  
  Dave   



This e-mail message and any attachments contain confidential information from Medco Health Solutions, Inc. If you are not the intended recipient, you are hereby notified that disclosure, printing, copying, distribution, or the taking of any action in reliance on the contents of this electronic information is strictly prohibited. If you have received this e-mail message in error, please immediately notify the sender by reply message and then delete the electronic message and any attachments.