Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-20 Thread Eric Thompson (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Eric Thompson updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Eric Thompson 
 
 
 

QA Risk Assessment Reason:
 
 perf; covered by unit benchmarks and tests 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-20 Thread Eric Thompson (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Eric Thompson updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Eric Thompson 
 
 
 

QA Risk Assessment:
 
 Needs Assessment No Action 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-18 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren assigned an issue to qa 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Status:
 
 Ready for  CI  Test 
 
 
 

Assignee:
 
 Thomas Hallgren qa 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-17 Thread Henrik Lindberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Henrik Lindberg updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Henrik Lindberg 
 
 
 

Release Notes:
 
 Not Needed Bug Fix 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-17 Thread Henrik Lindberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Henrik Lindberg updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Henrik Lindberg 
 
 
 

Release Notes Summary:
 
 while A small performance optimization was made in the time it takes to initialize the compiler. While  there is a  noticable  noticeable  speedup in initializing the compiler  itself  - the user observable actions of  'puppet  apply '  etc. have so much other things going on that this is dwarfed and is therefore almost  unnoticable. It  unnoticeable (in the 1-2% range), it  does make a difference in benchmarks (finding the real code to optimize), and will have a positive effect on running tests involving the compiler.  Net total - no release note. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-17 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren commented on  PUP-7313 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
  Re: Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 
 
Merged to 4.10.x at 224013c. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-17 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren assigned an issue to Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Assignee:
 
 Josh Cooper Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-16 Thread Craig Gomes (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Craig Gomes updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Craig Gomes 
 
 
 

Sprint:
 
 PDE 2017-03-08 , PDE 2017-03-22 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-07 Thread Henrik Lindberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Henrik Lindberg assigned an issue to Josh Cooper 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Henrik Lindberg 
 
 
 

Assignee:
 
 Thomas Hallgren Josh Cooper 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-07 Thread Henrik Lindberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Henrik Lindberg updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Henrik Lindberg 
 
 
 

Release Notes Summary:
 
 while there is a noticable speedup in initializing the compiler - the user observable actions of apply etc. have so much other things going on that this is dwarfed and is therefore almost unnoticable. It does make a difference in benchmarks (finding the real code to optimize), and will have a positive effect on running tests involving the compiler. Net total - no release note. 
 
 
 

Release Notes:
 
 Not Needed 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-07 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 The benchmark {{hiera_include_one}} recreates the compiler in each iteration. Profiling of  htat  that  benchmark has revealed a couple of places where the code can be improved to consume a lot less CPU cycles. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-7313) Shorten the time it takes to initialize the compiler and its scope

2017-03-07 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren created an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-7313 
 
 
 
  Shorten the time it takes to initialize the compiler and its scope  
 
 
 
 
 
 
 
 
 

Issue Type:
 
  Improvement 
 
 
 

Assignee:
 
 Thomas Hallgren 
 
 
 

Created:
 

 2017/03/07 6:20 AM 
 
 
 

Fix Versions:
 

 PUP 4.10.0 
 
 
 

Priority:
 
  Normal 
 
 
 

Reporter:
 
 Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 
The benchmark hiera_include_one recreates the compiler in each iteration. Profiling of htat benchmark has revealed a couple of places where the code can be improved to consume a lot less CPU cycles. 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment