Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-27 Thread John Duarte (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 John Duarte commented on  PUP-8046 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
  Re: Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 
 
Using bolt at SHA b300496 using puppet at SHA a28fc17, this passes manual validation. 
 
 
 
 
 
 
$ bundle exec bolt task run test::ensure -n localhost --modulepath /tmp/modules --params='{"ensure":"present"}' 
 
 
 
 
localhost: 
 
 
 
 
  
 
 
 
 
p(ensure) = present 
 
 
 
 
Notice: Compiled catalog for jduarte-thinkpad.puppetlabs.net in environment production in 0.14 seconds 
 
 
 
 
Notice: Applied catalog in 0.04 seconds 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
Ran on 1 node in 6.00 seconds
 
 
 
 
 
 
 
This is a simplified test based on the google compute module 
 
 
  

Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-27 Thread John Duarte (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 John Duarte assigned an issue to John Duarte 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 John Duarte 
 
 
 

Assignee:
 
 John Duarte 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-27 Thread Josh Cooper (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Josh Cooper commented on  PUP-8046 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
  Re: Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 
 
Henrik Lindberg, Thomas Hallgren thoughts on what needs to be tested here? John Duarte Could you verify? 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-26 Thread Jean Bond (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Jean Bond updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Jean Bond 
 
 
 

Release Notes Summary:
 
 Data types that had parameters, attributes or functions named the same as ruby keywords were not handled correctly as the generated code for such data types would result in ruby syntax errors. As an example a task could not have a parameter named 'ensure' because of this problem. This is now fixed. bug fix documented in bolt 0.6; needs to be documented for Puppet 5.3.3 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-26 Thread Jean Bond (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Jean Bond updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Jean Bond 
 
 
 

Labels:
 
 resolved-issue-added 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-19 Thread Jean Bond (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Jean Bond updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Jean Bond 
 
 
 

Labels:
 
 resolved-issue-added 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-13 Thread Henrik Lindberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Henrik Lindberg updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Henrik Lindberg 
 
 
 

Release Notes Summary:
 
 Data types that had parameters, attributes or functions named the same as ruby keywords were not handled correctly as the generated code for such data types would result in ruby syntax errors. As an example a task could not have a parameter named 'ensure' because of this problem. This is now fixed. 
 
 
 

Release Notes:
 
 Bug Fix 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-13 Thread Henrik Lindberg (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Henrik Lindberg commented on  PUP-8046 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
  Re: Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 
 
Merged to 5.3.x branch 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-13 Thread Eric Delaney (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Eric Delaney updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Eric Delaney 
 
 
 

QA Risk Assessment:
 
 Needs Assessment No Action 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren assigned an issue to Unassigned 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Assignee:
 
 Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Story Points:
 
 2 
 
 
 

Team:
 
 Platform Core 
 
 
 

Sprint:
 
 Tasks Kanban 
 
 
 

Method Found:
 
 Needs Assessment Manual Test 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Fix Version/s:
 
 PUP 5.3.z 
 
 
 

Fix Version/s:
 
 PUP 5.3.3 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren assigned an issue to Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Assignee:
 
 Thomas Hallgren 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Fix Version/s:
 
 PUP 5.3.z 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren updated an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Affects Version/s:
 
 PUP 5.3.2 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.


Jira (PUP-8046) Tasks with an ensure parameter cause plan failure

2017-10-12 Thread Thomas Hallgren (JIRA)
Title: Message Title
 
 
 
 
 
 
 
 
 
 
  
 
 Thomas Hallgren moved an issue 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 Puppet /  PUP-8046 
 
 
 
  Tasks with an ensure parameter cause plan failure  
 
 
 
 
 
 
 
 
 

Change By:
 
 Thomas Hallgren 
 
 
 

Scrum Team:
 
 Language 
 
 
 

Key:
 
 BOLT PUP - 175 8046 
 
 
 

Project:
 
 Puppet  Task Runner 
 
 
 
 
 
 
 
 
 
 
 
 

 
 Add Comment 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 

 This message was sent by Atlassian JIRA (v6.4.14#64029-sha1:ae256fe) 
 
 
 
 
  
 
 
 
 
 
 
 
 
   





-- 
You received this message because you are subscribed to the Google Groups "Puppet Bugs" group.
To unsubscribe from this group and stop receiving emails from it, send an email to puppet-bugs+unsubscr...@googlegroups.com.
To post to this group, send email to puppet-bugs@googlegroups.com.
Visit this group at https://groups.google.com/group/puppet-bugs.
For more options, visit https://groups.google.com/d/optout.