Re: [RE-wrenches] Commissioning issues with Enphase Ensemble

2020-09-30 Thread Jerry Shafer
Enphase needs to focus on there inverters instead of all this other crap,
they keep introducing battery tech but it never seams to stick. But hey
that just me.

On Wed, Sep 30, 2020, 3:37 PM  wrote:

> Wrenches-
> I'm having a lot of difficulty commissioning my first Enphase Ensemble
> installation. This is on a pre-existing microinverter installation.  Have
> been on the phone with tech support several times; each time they forward a
> Tech Brief about commissioning that has different and slightly conflicting
> instructions. It seems the order of turning on each box is critical.
> Because of already-obsolete software that they ship with, the software must
> be updated before activating the Envoy, Enpower, and Encharge or they will
> not work.
> And for some reason the Envoy must have both Wifi and cell connection
> before even starting commissioning, but the slower cell connection is used
> for software download so it takes up to 12 hours.
> This commissioning must be done on-site using their latest version of
> Installer Toolkit on a smart phone. Sure, there are buttons in Enlighten's
> Activation page to add an Enpower and Encharge, but these do not work
> "yet".
> Enphase tech support says they are working on making this a single-day
> process rather than the current multi-day commissioning. This does not even
> count the actual hardware installation time.
>
> I would advise anyone against moving any loads to a new subpanel before
> the entire system is commissioned and operating.
> As of now I have an Enpower that mistakenly thinks it is off-grid when the
> grid is present, so it has told the Envoy to shut down the PV
> microinverters and batteries. These are relay controlled, therefore it is
> not possible to have them connected without software control.  It has
> already committed the major crime of shutting down the backed-up loads
> while the grid is still present. Enphase is working on it, but seem to be
> developing software on the fly. I suppose their integration process has
> been hit hard by pandemic distancing, and they are all working remotely.
>
> Has anyone else had a successful experience commissioning an Ensemble?
> I'd like to hear about the doos-and-don'ts.
>
> Don Barch
> d...@energysolarnow.com
> ___
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches@lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> http://www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> http://www.members.re-wrenches.org
>
>
___
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org



Re: [RE-wrenches] Conext inverter non warranty repair

2020-09-30 Thread Dave Angelini Offgrid Solar


Hi Andrew, 

Question, did you ask Schneider who they recommended?


Below are from the group here. I really have not needed any repairs and I
use alot of XW's If they have SPD's and are not direct hit, they are
extremely durable. Good Luck! 
 SW4048 with board testing and repair by
Craig Kilburn
at Phantom Power Services.

He was fast and reasonable.
cr...@phantompowerservices.com [1]

Marysville Marine can replace XW welded
relays.

PJ Gonzalez   Is there there anyone one out there working on
Conext XW 6848s? I have a unit out of warranty that has a fried
communication unit I need to get repaired. 

Andrew Perkins


Greenwired 

P: 707-923-2001 ext. 100 

1150 #1 Evergreen Rd 

Redway, CA
95560 www.greenwired.com [5] 

   

Links:
--
[1]
mailto:cr...@phantompowerservices.com
[2]
mailto:pgonza...@inverterservicecenter.com
[3]
http://members.sti.net/offgridsolar/
[4] mailto:offgridso...@sti.net
[5]
http://www.greenwired.com
___
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org



[RE-wrenches] Commissioning issues with Enphase Ensemble

2020-09-30 Thread don
Wrenches-I'm having a lot of difficulty commissioning my first Enphase Ensemble installation. This is on a pre-existing microinverter installation.  Have been on the phone with tech support several times; each time they forward a Tech Brief about commissioning that has different and slightly conflicting instructions. It seems the order of turning on each box is critical. Because of already-obsolete software that they ship with, the software must be updated before activating the Envoy, Enpower, and Encharge or they will not work. And for some reason the Envoy must have both Wifi and cell connection before even starting commissioning, but the slower cell connection is used for software download so it takes up to 12 hours. This commissioning must be done on-site using their latest version of 
Installer Toolkit on a smart phone. Sure, there are buttons in 
Enlighten's Activation page to add an Enpower and Encharge, but these 
do not work "yet". Enphase tech support says they are working on making this a single-day process rather than the current multi-day commissioning. This does not even count the actual hardware installation time. I would advise anyone against moving any loads to a new subpanel before the entire system is commissioned and operating. As of now I have an Enpower that mistakenly thinks it is off-grid when the grid is present, so it has told the Envoy to shut down the PV microinverters and batteries. These are relay controlled, therefore it is not possible to have them connected without software control.  It has already committed the major crime of shutting down the backed-up loads while the grid is still present. Enphase is working on it, but seem to be developing software on the fly. I suppose their integration process has been hit hard by pandemic distancing, and they are all working remotely. Has anyone else had a successful experience commissioning an Ensemble? I'd like to hear about the doos-and-don'ts. Don Barchd...@energysolarnow.com
___
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org



[RE-wrenches] Conext inverter non warranty repair

2020-09-30 Thread Andrew Perkins
Is there there anyone one out there working on Conext XW 6848s? I have a unit 
out of warranty that has a fried communication unit I need to get repaired.






Andrew Perkins

Greenwired

P: 707-923-2001 ext. 100

1150 #1 Evergreen Rd

Redway, CA 95560

http://www.greenwired.com___
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org