Re: [RE-wrenches] Testing strings with Tigo

2023-07-06 Thread Nick A Lucchese via RE-wrenches
Good morning William,

Yes there are a couple new things to learn when working with these RS units. 
I’ve done a few now, the most recent three with the same controllers as you and 
Dave.

I am assuming the wording about being terminated at the inverter can also be 
understood as having landed the conductors inside the GSLC on the appropriate 
bus bars and 300v breakers. If you’re using Tigo’s AC to 12vdc converter then 
of course the inverter must be operational to produce the AC source to energize 
the converter so perhaps that’s why they want it landed at the inverter since 
they don’t really promote the use of a DC to DC converter. I use a 48 VDC to 
12VDC converter so the keep alive signal doesn’t rely on the inverter being on 
so as long as I’ve got the battery bank assembled it allows me to do all the 
appropriate testing at the array.

One major thing to know is that you don’t want to operate with a partial amount 
of your strings energized while you work on the others. I (used to in the past) 
often do this at off grid sites so their continuity of power service is least 
interrupted and to negate the need to use a fossil fuel based power source. 
Apparently the TS4 units “learn” the sum of all the paralleled string 
resistances together so if trying to add additional strings later you may have 
individual units lock up and not push any power. I’ve had this happen twice 
where the .6vdc unit expected sums added up but don’t actually pass the array 
voltage from the two modules out of the affected TS4-2. For example, 3 x TS4-2 
units with six modules yet only seeing the expected VOC out of four modules. 
Each time this occurred it was with the TS4-2 varieties and would happen on the 
first strings commissioned whereas the newest strings would pass the expected 
string voltage. Their helpful tech’s suggested power cycling the converter 
along with transmitter however after multiple attempts I’ve still had this not 
remedy the situation on one of the projects and required me to swap out the 
TS4-2 in question. 

Quite a drag when you’ve already got your cable management all wrapped up and 
thinking you’re done on a 12/12 roof. Since they’re so inexpensive I held on to 
affected unit so I can try to recreate this issue on a mock up system. Perhaps 
they can be “unbricked” if they are the single recipient of the transmitter's 
output, we’ll see. Looks like we’re going to be stuck with this equipment for 
awhile so I figure it’s worth playing with at home.

The other thing I observed is that when you initiate a rapid shutdown command 
the FM100’s see it as an arc fault. Again, have had this happen twice however 
each time a complete power down on the FM100’s cleared it. Earlier FM100’s 
failed for me frequently so now anytime I need to power down an FM100 anymore I 
cross my fingers it will come back. So far so good with this particular arc 
fault scenario and seems like the FM100’s are generally quite more reliable 
than they were during that painfully long period of Outback woes.

As Jerry always says “fun times”. Stay cool up on that roof, Nick




> On Jul 5, 2023, at 10:04 PM, William Miller via RE-wrenches 
>  wrote:
> 
> Friends:
>  
> We are in the midst of our first off-grid, DC coupled project using Tigo 
> TS4-A-F RSS switches.
>  
> In my few years installing solar I am accustomed to testing PV strings with a 
> Fluke 87 for Voc, Isc, Vmp and Imp, or some combination.  I do this regularly 
> in the midst of installing PV so I can be confident once we are finished 
> there will be no issues with the panels or the wiring.
>  
> I understand these tests are not possible with the Tigo units.  With the 
> circuits unterminated, I can see the 0.6 VDC/Tigo with no keep-alive signal 
> transmitted.  With the signal being transmitted, I do not see the expected 
> readings for Voc.  I get only the 0.6/Tigo.  When shorted into the Fluke DC 
> input the Isc jumps around between 0 and about 2 amps.
>  
> I was told by tech support the PV circuits need to be “terminated” at an 
> inverter before any voltage or current can be measured.  The circuits do not 
> terminate in an inverter; they will connect to a charge controller (FM100, in 
> this case).
>  
> We have not pulled the PV feeders so connecting to the charge controllers is 
> not yet possible.  I am nervous about installing the remainder of the modules 
> without knowing for certain they will produce as they should.
>  
> What would you all do to assure yourselves the PV will produce once connected?
>  
> TIA.
>  
> William
>  
> Miller Solar
> 17395 Oak Road, Atascadero, CA 93422
> 805-438-5600
> www.millersolar.com 
> CA Lic. 773985

___
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:

Re: [RE-wrenches] Testing strings with Tigo

2023-07-06 Thread Dave Tedeyan via RE-wrenches
Hi William,

I recently installed these connected to an FM100, and also on a couple grid
tied systems in the past year. I think that as long as you are getting the
expected 0.6V per module you know that everything is connected as it should
be. Unfortunately I do not think that you will be able to do your other
tests until the strings are terminated at the charge controller with the
transmitter sending the keep alive signal. But then you can open up the
fuses/breakers in your combiner to test strings one at a time. And once the
system is running, you can obviously check that your strings have the same
Vmp/Imp. If this is your first TS4-A-F installation, then some of it is
just that, yes, these things do work when installed correctly.
Hope this helps.
Cheers,
Dave

On Thu, Jul 6, 2023 at 1:12 AM William Miller via RE-wrenches <
re-wrenches@lists.re-wrenches.org> wrote:

> Friends:
>
>
>
> We are in the midst of our first off-grid, DC coupled project using Tigo
> TS4-A-F RSS switches.
>
>
>
> In my few years installing solar I am accustomed to testing PV strings
> with a Fluke 87 for Voc, Isc, Vmp and Imp, or some combination.  I do this
> regularly in the midst of installing PV so I can be confident once we are
> finished there will be no issues with the panels or the wiring.
>
>
>
> I understand these tests are not possible with the Tigo units.  With the
> circuits unterminated, I can see the 0.6 VDC/Tigo with no keep-alive signal
> transmitted.  With the signal being transmitted, I do not see the expected
> readings for Voc.  I get only the 0.6/Tigo.  When shorted into the Fluke DC
> input the Isc jumps around between 0 and about 2 amps.
>
>
>
> I was told by tech support the PV circuits need to be “terminated” at an
> inverter before any voltage or current can be measured.  The circuits do
> not terminate in an inverter; they will connect to a charge controller
> (FM100, in this case).
>
>
>
> We have not pulled the PV feeders so connecting to the charge controllers
> is not yet possible.  I am nervous about installing the remainder of the
> modules without knowing for certain they will produce as they should.
>
>
>
> What would you all do to assure yourselves the PV will produce once
> connected?
>
>
>
> TIA.
>
>
>
> William
>
>
>
> Miller Solar
>
> 17395 Oak Road, Atascadero, CA 93422
>
> 805-438-5600
>
> www.millersolar.com
>
> CA Lic. 773985
>
>
>
>
> ___
> List sponsored by Redwood Alliance
>
> Pay optional member dues here: http://re-wrenches.org
>
> List Address: RE-wrenches@lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> There are two list archives for searching. When one doesn't work, try the
> other:
> https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> http://www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> http://www.members.re-wrenches.org
>
>

-- 
[image: Logo] 
Dave Tedeyan, P.E.
Owner | Sungineer Solar
p: he | him | his
a: 1653 Slaterville Rd. | Ithaca, NY 14850
w: www.sungineersolar.com 
c: (607) 270-0370
___
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org



[RE-wrenches] Testing strings with Tigo

2023-07-05 Thread William Miller via RE-wrenches
Friends:



We are in the midst of our first off-grid, DC coupled project using Tigo
TS4-A-F RSS switches.



In my few years installing solar I am accustomed to testing PV strings with
a Fluke 87 for Voc, Isc, Vmp and Imp, or some combination.  I do this
regularly in the midst of installing PV so I can be confident once we are
finished there will be no issues with the panels or the wiring.



I understand these tests are not possible with the Tigo units.  With the
circuits unterminated, I can see the 0.6 VDC/Tigo with no keep-alive signal
transmitted.  With the signal being transmitted, I do not see the expected
readings for Voc.  I get only the 0.6/Tigo.  When shorted into the Fluke DC
input the Isc jumps around between 0 and about 2 amps.



I was told by tech support the PV circuits need to be “terminated” at an
inverter before any voltage or current can be measured.  The circuits do
not terminate in an inverter; they will connect to a charge controller
(FM100, in this case).



We have not pulled the PV feeders so connecting to the charge controllers
is not yet possible.  I am nervous about installing the remainder of the
modules without knowing for certain they will produce as they should.



What would you all do to assure yourselves the PV will produce once
connected?



TIA.



William



Miller Solar

17395 Oak Road, Atascadero, CA 93422

805-438-5600

www.millersolar.com

CA Lic. 773985
___
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org