Re: new daily builds and preparing for Beta 1: CCR
On 2 Nov 2014, at 14:28, Dirk Hohndel wrote: > Given that logging in itself doesn’t cause people danger (I think - correct > me if I’m wrong and things are different with a CCR), disabling this would be > unnecessary. That’s reasonable IMHO. More test data would be useful. The Poseidon CSV that’s currently in the repo is a little odd in places (e.g. the two O2 sensors seem to differ by about 25%) Paul signature.asc Description: Message signed with OpenPGP using GPGMail ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
Re: new daily builds and preparing for Beta 1: CCR
> On Nov 2, 2014, at 1:14 AM, Willem Ferguson > wrote: > I do not think the Poseidon logging will be ready for 4.3. I hope very much > that most of the UI development will be completed with 4.3, but the testing > of the UI and the data imports will probably require at least 2 more months. > I want at least 200 dives test-logged by at least 5 different divers using > their own hardware. I have three Poseidon divers lined up, need two more. I > do not know of any Poseidon divers that have a Mac. Windows is the rule. I would suggest calling the Poseidon logging “experimental” in the announcement and ask Poseidon users for input. Given that logging in itself doesn’t cause people danger (I think - correct me if I’m wrong and things are different with a CCR), disabling this would be unnecessary. /D ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
Re: new daily builds and preparing for Beta 1: CCR
On 02/11/2014 07:11, Dirk Hohndel wrote: On Sat, Nov 01, 2014 at 07:18:26AM +0100, Robert C. Helling wrote: The CCR / PSCR code clearly needs more work. What's the status of the planner? But I should have a few hours in the next week for subsurface. Do here is what I expect: CCR logging (as far as ceilings go) should work with gas consumption disabled beyond anything that is dillutant use at depth independent rate. CCR planning should work as well but still without much UI support for bailout variants except "from here bailout OC). PSCR will not be exposed to users (except maybe as Easter egg like have pscr keyword to turn on pscr ceiling calculations for testing). That is my plan which is hopefully realistic. /D ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface I do not think the Poseidon logging will be ready for 4.3. I hope very much that most of the UI development will be completed with 4.3, but the testing of the UI and the data imports will probably require at least 2 more months. I want at least 200 dives test-logged by at least 5 different divers using their own hardware. I have three Poseidon divers lined up, need two more. I do not know of any Poseidon divers that have a Mac. Windows is the rule. Kind regards, willem ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
Re: new daily builds and preparing for Beta 1: User manual
On Sat, Nov 01, 2014 at 09:15:24AM +0200, Willem Ferguson wrote: > On 01/11/2014 01:12, Dirk Hohndel wrote: > >Willem, I assume you will continue to drive the user manual (which of > >course also drives its own translation team). > > > Yup. > > I was waiting for some of the new UI developments to stabilise before > writing English text. Understood. I'm still waiting to hear from Tomaz if he wants to tackle the alternative UI design for the multi filter that I proposed or if he wants to keep it as is for 4.3. /D ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
Re: new daily builds and preparing for Beta 1
On Sat, Nov 01, 2014 at 07:18:26AM +0100, Robert C. Helling wrote: > > > > The CCR / PSCR code clearly needs more work. > > > > What's the status of the planner? > > Sorry I have been so silent recently but some real world issues required my > attention more urgently. I will tell you what I tell everyone. Life comes first. Don't worry about it. > But I should have a few hours in the next week for subsurface. > > Do here is what I expect: > > CCR logging (as far as ceilings go) should work with gas consumption disabled > beyond anything that is dillutant use at depth independent rate. > > CCR planning should work as well but still without much UI support for > bailout variants except "from here bailout OC). > > PSCR will not be exposed to users (except maybe as Easter egg like have pscr > keyword to turn on pscr ceiling calculations for testing). > > That is my plan which is hopefully realistic. That sounds like a good goal. Thanks /D ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
Re: new daily builds and preparing for Beta 1: User manual
On 01/11/2014 01:12, Dirk Hohndel wrote: Willem, I assume you will continue to drive the user manual (which of course also drives its own translation team). Yup. I was waiting for some of the new UI developments to stabilise before writing English text. wf ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
Re: new daily builds and preparing for Beta 1
Dirk, > Am 01.11.2014 um 00:12 schrieb Dirk Hohndel : > > > The CCR / PSCR code clearly needs more work. > > What's the status of the planner? Sorry I have been so silent recently but some real world issues required my attention more urgently. But I should have a few hours in the next week for subsurface. Do here is what I expect: CCR logging (as far as ceilings go) should work with gas consumption disabled beyond anything that is dillutant use at depth independent rate. CCR planning should work as well but still without much UI support for bailout variants except "from here bailout OC). PSCR will not be exposed to users (except maybe as Easter egg like have pscr keyword to turn on pscr ceiling calculations for testing). That is my plan which is hopefully realistic. Best Robert ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface
new daily builds and preparing for Beta 1
I think I have everything applied - or responded to :-) New daily builds are up for Windows (32 & 64bit) and Mac. It's 4.2-400. Please play with the new multi filter functions and any and all other features. As I mentioned, I want to do a first beta in a week. So translators, please get started. The latest strings have been pushed (but sorry, the binaries were build before I pulled the last translations, so for those translators who already started, those changes aren't reflected in the binaries). Willem, I assume you will continue to drive the user manual (which of course also drives its own translation team). The CCR / PSCR code clearly needs more work. What's the status of the planner? I still want to have an easier "add dive" where the user simply gives a max depth and has a checkbox whether they want a safety stop or not. This is IN ADDITION to the current profile based editor. There are quite a few open bugs in trac, I'll make another pass at some of those. It would be nice if others would take a look as well. We obviously want some version of EON Steel support (as well as all the other new models that are in libdivecomputer). I have a few more small things in mind that I can't remember right now :-) Have a good weekend everyone! /D ___ subsurface mailing list subsurface@subsurface-divelog.org http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface