Hi,

a week has passed since then. May we please have a final schedule?
Thanks in advance!

Cheers!
-- 
  intrigeri
  | GnuPG key @ https://gaffer.ptitcanardnoir.org/intrigeri/intrigeri.asc
  | OTR fingerprint @ https://gaffer.ptitcanardnoir.org/intrigeri/otr.asc
___
tails-dev mailing list
tails-dev@boum.org
https://mailman.boum.org/listinfo/tails-dev
To unsubscribe from this list, send an empty email to 
tails-dev-unsubscr...@boum.org.


Re: [Tails-dev] Release schedule for Tails 0.23

2014-02-20 Thread anonym
20/02/14 13:25, intrigeri wrote:
 Hi,
 
 a week has passed since then. May we please have a final schedule?
 Thanks in advance!

Sorry, posted now. The reason I have been putting this off is that other
commitments collided with 2014-03-16, when the Iceweasel sources
apparently are actually available and when I technically could start
preparing the release and thereby shave off one day delay for the
release. I've been trying to sort out the collision but I still don't
feel confident I'll be available on the 16th so I'll stick with the
original date.

Cheers!

___
tails-dev mailing list
tails-dev@boum.org
https://mailman.boum.org/listinfo/tails-dev
To unsubscribe from this list, send an empty email to 
tails-dev-unsubscr...@boum.org.


Re: [Tails-dev] Release schedule for Tails 0.23

2014-02-18 Thread sajolida
anonym:
   2014-03-05   Feature freeze.

Nice, so I'm not that late with respect to my commitments.

   2014-03-06   Test 0.23-rc1.
   2014-03-18   Test 0.23.

I can make it for both testing sessions.




signature.asc
Description: OpenPGP digital signature
___
tails-dev mailing list
tails-dev@boum.org
https://mailman.boum.org/listinfo/tails-dev
To unsubscribe from this list, send an empty email to 
tails-dev-unsubscr...@boum.org.

Re: [Tails-dev] Release schedule for Tails 0.23

2014-02-17 Thread Alan
Hi,

 Hi list,
 
 I'll be release manager for the Tails 0.23 release. Here's the
 preliminary release schedule:
 
Thanks for this schedule.

 I suppose bumping the release date by only one day instead (to
 2014-03-19) is viable if I get enough assurances that others can help
 in the testing on 2014-03-18. 

I can.

Cheers
___
tails-dev mailing list
tails-dev@boum.org
https://mailman.boum.org/listinfo/tails-dev
To unsubscribe from this list, send an empty email to 
tails-dev-unsubscr...@boum.org.


Re: [Tails-dev] Release schedule for Tails 0.23

2014-02-13 Thread intrigeri
Hi,

anonym wrote (13 Feb 2014 00:22:37 GMT) :
   2014-03-17   Firefox 24.4.0 ESR sources are available.
[...]
 In our calendar [1] we have scheduled the release of Tails 0.23 on
 2014-03-18 but given Mozilla's release schedule [1] that seems
 difficult: the merge date for 24.4.0 ESR is 2014-03-17, i.e. the day
 before the release. Therefore I bumped it by two days.

I'm not sure what these dates really mean on Mozilla's release
schedule. I mean, for the last release, their schedule says merge date
was Feb 3rd, while the sources were available on the Saturday before,
as usual. You could ask on the ESR mailing-list if things are going to
be any different in the future than in the last year or so. But well,
if you want to play it safe, I'm fine with postponing the release
a bit.

 I suppose bumping the release date by only one day instead (to
 2014-03-19) is viable if I get enough assurances that others can help in
 the testing on 2014-03-18.

I can be there on 17th and 18th.

 OTOH, I like the idea of having two days for
 testing the final release so there's some headroom for dealing with
 last-minute issues, like random bit flips caused by cosmic radiation or
 similar. :)

Right.

 Any opinions on this delayed release, in particular the 1 day vs 2 days
 bump? Once that's settled I'll update our calendar.

Assuming Mozilla don't change their habits, building FF + the ISO
during the week-end, testing on Monday + Tuesday, releasing on
Wednesday would look optimal to me.

(Side note: in any case, given how late the Tor Browser folks start
rebasing their patches etc., I assume we'll once again ship with the
previous version of the patch set + Torbutton.)

Cheers!
-- 
  intrigeri
  | GnuPG key @ https://gaffer.ptitcanardnoir.org/intrigeri/intrigeri.asc
  | OTR fingerprint @ https://gaffer.ptitcanardnoir.org/intrigeri/otr.asc
___
tails-dev mailing list
tails-dev@boum.org
https://mailman.boum.org/listinfo/tails-dev


[Tails-dev] Release schedule for Tails 0.23

2014-02-12 Thread anonym
Hi list,

I'll be release manager for the Tails 0.23 release. Here's the
preliminary release schedule:

  2014-03-05   Feature freeze.
   Tag 0.23-rc1 in Git.
   Build and upload 0.23-rc1 ISO and IUK.
  2014-03-06   Test 0.23-rc1.
  2014-03-07   Officially release 0.23-rc1.

  2014-03-17   Firefox 24.4.0 ESR sources are available.
   Package and upload Firefox 24.4.0 ESR.
   Tag 0.23 in Git.
   Build and upload 0.23 ISO and IUK.
  2014-03-18   Test 0.23.
  2014-03-20   Officially release Tails 0.23.

In our calendar [1] we have scheduled the release of Tails 0.23 on
2014-03-18 but given Mozilla's release schedule [1] that seems
difficult: the merge date for 24.4.0 ESR is 2014-03-17, i.e. the day
before the release. Therefore I bumped it by two days.

I suppose bumping the release date by only one day instead (to
2014-03-19) is viable if I get enough assurances that others can help in
the testing on 2014-03-18. OTOH, I like the idea of having two days for
testing the final release so there's some headroom for dealing with
last-minute issues, like random bit flips caused by cosmic radiation or
similar. :)

Any opinions on this delayed release, in particular the 1 day vs 2 days
bump? Once that's settled I'll update our calendar.

Cheers!