Re: [Tails-dev] Release schedule for Tails 1.2.1
Hi, Mozilla broke TBB's deterministic build setup with ESR 33.3.0, and while we may have linux32 builds of TBB 4.0.2 ready later today, they'll be without QA. Therefore I think we should delay Tails 1.2.1 with one day, so we test and release on 2014-12-03. Any objections to this new plan? As I said earlier in this thread I won't be available tomorrow. Good luck! Cheers ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
On 18/11/14 11:11, anonym wrote: So here is the new tentative release schedule for Tails 1.2.1: 2014-12-01 TBB 4.x based on Firefox 31.3.0esr is *hopefully* out Tag 1.2.1 in Git Build and upload 1.2.1 ISO and IUKs 2014-12-02 Test (early CEST) and release (late CEST) Tails 1.2.1 Who's available for testing the final 1.2.1 image on 2013-12-02? In case there's a delay, who's available the day after, on 2013-12-03? Mozilla broke TBB's deterministic build setup with ESR 33.3.0, and while we may have linux32 builds of TBB 4.0.2 ready later today, they'll be without QA. Therefore I think we should delay Tails 1.2.1 with one day, so we test and release on 2014-12-03. Any objections to this new plan? Cheers! ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
If I can be of use I can probably be around on either of the proposed days (02-Dec-14 and/or 03-Dec-14) -- GPG ID: 0x5BF72F42D0952C5A Fingerprint: BD12 65FD 4954 C40A EBCB F5D7 5BF7 2F42 D095 2C5A pgpFQ3IW03u5w.pgp Description: OpenPGP digital signature ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
Hi, Who's available for testing the final 1.2.1 image on 2013-12-02? Me. In case there's a delay, who's available the day after, on 2013-12-03? No sorry. Cheers ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
anonym: 2014-12-01 TBB 4.x based on Firefox 31.3.0esr is *hopefully* out Tag 1.2.1 in Git Build and upload 1.2.1 ISO and IUKs 2014-12-02 Test (early CEST) and release (late CEST) Tails 1.2.1 Who's available for testing the final 1.2.1 image on 2013-12-02? In case there's a delay, who's available the day after, on 2013-12-03? I can be there either way. -- sajolida ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
anonym: 2014-12-01 TBB 4.x based on Firefox 31.3.0esr is *hopefully* out Tag 1.2.1 in Git Build and upload 1.2.1 ISO and IUKs 2014-12-02 Test (early CEST) and release (late CEST) Tails 1.2.1 Who's available for testing the final 1.2.1 image on 2013-12-02? In case there's a delay, who's available the day after, on 2013-12-03? I can be there either way. -- sajolida ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
On 22/10/14 14:10, anonym wrote: Hi, I'll be the release manager for Tails 1.2.1, scheduled to be released on 2014-11-25. I'll start with the schedule part for the preparation of the final release: 2014-11-24 TBB 4.x based on Firefox 31.3.0esr is *hopefully* out Tag 1.2.1 in Git Build and upload 1.2.1 ISO and IUKs 2014-11-25 Test (early CEST) and release (late CEST) Tails 1.2.1 So it seems the Firefox 31.3.0esr release will be delayed a week: https://groups.google.com/forum/#!topic/mozilla.dev.platform/1McXdXSurZQ So here is the new tentative release schedule for Tails 1.2.1: 2014-12-01 TBB 4.x based on Firefox 31.3.0esr is *hopefully* out Tag 1.2.1 in Git Build and upload 1.2.1 ISO and IUKs 2014-12-02 Test (early CEST) and release (late CEST) Tails 1.2.1 Who's available for testing the final 1.2.1 image on 2013-12-02? In case there's a delay, who's available the day after, on 2013-12-03? Cheers! ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
Hi, anonym wrote (22 Oct 2014 12:10:59 GMT) : So, Tails contributors, please let me know which of you are available for testing the final image on 2014-11-25 (early CEST)! I might be able to do a couple hours of testing (early CET) that day, but no promise. Next up, the preliminary release schedule for the 1.2.1 release candidate, *if* we feel we need one: 2014-11-05 Feature freeze 2014-11-12 Tag 1.2.1~rc1 in Git Build and upload 1.2.1~rc1 ISO/IUKs 2014-11-13 Test (early CEST) and release (late CEST) 1.2.1~rc1 So we haven't had an RC for a point-release since 0.22.1-rc1 (unless we count 1.0 as a point-release) and I believe that one wasn't even formally released and tested. As I've recently become something like the Eternal Chairman of Release Managing I do like this, but at least intrigeri has asked for an exception to *maybe* push some features (specifically AppArmor stuff) into either Tails 1.2.1 or Tails 1.2.2 (2015-01-06) given how long it is until the next major release (Tails 1.3 on 2015-02-17). If that happens for 1.2.1, we may want to consider an RC. I'm not likely to have anything serious in good shape before November 5, so I guess we won't need a RC. Cheers! -- intrigeri ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
30/10/14 16:50, intrigeri wrote: anonym wrote (22 Oct 2014 12:10:59 GMT) : Next up, the preliminary release schedule for the 1.2.1 release candidate, *if* we feel we need one: 2014-11-05 Feature freeze 2014-11-12 Tag 1.2.1~rc1 in Git Build and upload 1.2.1~rc1 ISO/IUKs 2014-11-13 Test (early CEST) and release (late CEST) 1.2.1~rc1 So we haven't had an RC for a point-release since 0.22.1-rc1 (unless we count 1.0 as a point-release) and I believe that one wasn't even formally released and tested. As I've recently become something like the Eternal Chairman of Release Managing I do like this, but at least intrigeri has asked for an exception to *maybe* push some features (specifically AppArmor stuff) into either Tails 1.2.1 or Tails 1.2.2 (2015-01-06) given how long it is until the next major release (Tails 1.3 on 2015-02-17). If that happens for 1.2.1, we may want to consider an RC. I'm not likely to have anything serious in good shape before November 5, so I guess we won't need a RC. Cheers! Ok. Just to clarify for everyone: then the only testing session we will have will be fore the final 1.2.1 image on 2014-11-25 (early CEST). Cheers! ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
Re: [Tails-dev] Release schedule for Tails 1.2.1
anonym wrote: So, Tails contributors, please let me know which of you are available for testing the final image on 2014-11-25 (early CEST)! So, Tails contributors, please let me know which of you are available for testing the RC (or similar) image on 2014-11-13! Both dates should work for me. -- sajolida ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.
[Tails-dev] Release schedule for Tails 1.2.1
Hi, I'll be the release manager for Tails 1.2.1, scheduled to be released on 2014-11-25. I'll start with the schedule part for the preparation of the final release: 2014-11-24 TBB 4.x based on Firefox 31.3.0esr is *hopefully* out Tag 1.2.1 in Git Build and upload 1.2.1 ISO and IUKs 2014-11-25 Test (early CEST) and release (late CEST) Tails 1.2.1 Yup, I've now adopted a test-and-release-on-the-same-day strategy. I think I've only seen one instance when having a dedicated day for testing was useful, and that was when we had to rebuild Tails 1.1. So while that is useful, it's just not realistic any more now that we've migrated to using the TBB; their release history shows that the final tarballs rarely are available that early. In the above schedule it's assumed that we'll have the TBB tarballs on 2014-11-24, and we'll have to see if that works out. [1] Expect updates to this schedule, so please pay attention for new posts in this thread and on the calendar [2] (now updated)! [1] https://lists.torproject.org/pipermail/tbb-dev/2014-October/000143.html [2] https://tails.boum.org/contribute/calendar/ So, Tails contributors, please let me know which of you are available for testing the final image on 2014-11-25 (early CEST)! Next up, the preliminary release schedule for the 1.2.1 release candidate, *if* we feel we need one: 2014-11-05 Feature freeze 2014-11-12 Tag 1.2.1~rc1 in Git Build and upload 1.2.1~rc1 ISO/IUKs 2014-11-13 Test (early CEST) and release (late CEST) 1.2.1~rc1 So we haven't had an RC for a point-release since 0.22.1-rc1 (unless we count 1.0 as a point-release) and I believe that one wasn't even formally released and tested. As I've recently become something like the Eternal Chairman of Release Managing I do like this, but at least intrigeri has asked for an exception to *maybe* push some features (specifically AppArmor stuff) into either Tails 1.2.1 or Tails 1.2.2 (2015-01-06) given how long it is until the next major release (Tails 1.3 on 2015-02-17). If that happens for 1.2.1, we may want to consider an RC. However, intrigeri also proposed that we may skip a formal RC, and that some of us still gather on IRC and collectively do some focused testing of any new features we'd like to go into 1.2.1. If we do this, I'd still propose this to happen on 2014-11-13. Personally, I would prefer this option, but I'd like to hear what the rest of you think. Opinions? In either case, I will be travelling 2014-11-07 to 2014-11-10, and do not expect to be available much of that time, and this is a bit problematic. That's why I've set the feature freeze to 2014-11-05, which is just two weeks away. That's mostly to signal that any work intended for 1.2.1 must be in good shape by then, because in practice I'll merge stuff until 2014-11-12. My intention is to have reviewed and tested the bulk of what's going into 1.2.1 by 2014-11-06. I hope this won't be an issue. So, Tails contributors, please let me know which of you are available for testing the RC (or similar) image on 2014-11-13! Cheers! ___ Tails-dev mailing list Tails-dev@boum.org https://mailman.boum.org/listinfo/tails-dev To unsubscribe from this list, send an empty email to tails-dev-unsubscr...@boum.org.