Re: [Therion] UISv1 grades: made a file, please give feedback

2016-11-25 Thread Benedikt Hallinger via Therion

... i made a github pull request to make incorporation easy.
https://github.com/therion/test/pull/6

Howevr, i do not know if that repository is the projects central main code 
base?


Greetings,
Beni



Am 2016-11-25 22:17, schrieb Benedikt Hallinger via Therion:

Hi there, here the updated version.



Am 2016-11-10 18:15, schrieb Benedikt Hallinger:

Oops, yes, thank you for spotting this!
It must read 0.125 of course!

Am 2016-11-09 15:21, schrieb Footleg:
This looks potentially very useful, but I have not yet explored defining 
sd settings in my survey data. So I may need to learn a bit more in order 
to use it.


I spotted one potential error? In the grade 6 section, the compass 
bearing is to 0.125 degrees. But the clino is stated as 1.125 degrees. I 
think both should be 0.125 right?


Footleg

On Mon, Nov 7, 2016 at 10:17 PM Benedikt Hallinger  wrote:



Hello,

for a recent project i made a grades file (based on the BCRE-example in
therion distribution) for UISv1 specifications (see attachment).
It would be a pleasure for me if it is useful to somebody; it would 
also be

very nice if i could get some feedback on it.

With the naming i had the intention that exporting from databases is 
easily

doable. The prefix is "UISv1_" followed by the actual grades number.
I included all the grades to faciliate documentation inside the 
th-files, so

one can stright export "-1" surveys too.

With best regards,
Benedikt Hallinger

For better archiving and searchability, here is the code reproduced:
 UISv1Grades.th -
encoding utf-8
# UIS Grades - International standard grades specification
#   from: http://www.uisic.uis-speleo.org/UISmappingGrades.pdf [1]
# Version 2 from 14 Sep 2012 (cosmetic update; UISv1 values still 
apply)

#
# Note: UIS standards says nothing about accuracy of the stations
#       positions, so it is probably good practice to include a
#       "sd position  " definition in your centrelines.
#

# Grade -1: no map available
# Only for database purposes: It means that the cave map has not been 
drawn

yet.
grade "UISv1_-1" -title "UISv1 ungraded survey without map"
   # Not applicaple for therion data.
   # It is mainly here to support automated data exports from
   # databases wich may export such a number.
endgrade

# Grade 0: ungraded
# Only for database purposes. If a cave survey is ungraded, its quality
cannot be
# assessed. This is most usually true for historic or otherwise old 
maps.

grade "UISv1_0" -title "UISv1 ungraded survey"
   # Nothing defined here.
   # Specifying such an grade may be useful to document that the survey 
was
   # not graded. As it is documented in the *.th-datafiles it may 
easily be

   # searched for. Use it as a kind of "todo" flag...
endgrade

# Grade 1: sketch from memory, not to scale
grade "UISv1_1" -title "UISv1 survey grade 1"
   # nothing defined here.
   # Specifying such an grade may be useful to document that the survey 
was

   # just the result of a sketch and shpuld be redone.
endgrade

# Grade 2: No instruments, from annotations/sketches/estimates
# Map compiled from annotations, sketches and estimates made
# in the cave. No instruments used.
grade "UISv1_2" -title "UISv1 survey grade 2"
   # nothing defined here.
   # Specifying such an grade may be useful to document that the survey
   # was the result of sketches/annotations in the cave.
endgrade

# Grade 3: Rough magnetic/analogue survey
# Directions measured by compass, distances measured by chord,
# pace, or body dimensions. Significant slopes estimated.
#
# A Silva clinometer or comparable, relatively simple means without 
precise
# readings qualify for grade 3. Mapping from head to head of the 
surveyors
# qualifies only for grade 3. Topofil measurements qualify generally 
for

# grade 3 or 4.
grade "UISv1_3" -title "UISv1 survey grade 3"

   # 95.44% of readings are within 0.5m (2 S.D.)
   length 0.25 metres

   # 95.44% of readings are within 5.0 degrees (2 S.D.)
   bearing 2.50 degrees

   # 95.44% of readings are within 30.0 degrees (2 S.D.)
   # (estimating is allowed, no measurement needed - value guessed by 
me)

   gradient 15.0 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position  " to your centreline.

endgrade

# Grade 4: Magnetic survey
# Compass and tape survey, using deliberately chosen and fixed
# stations. Slopes measured by clinometer or horizontal and vertical
# components of line.
#
# Topofil measurements may qualify for grade 4 if the survey shots are 
not

too
# long and care is given to correctly read all data. Laser rangefinder 
can

be
# used throughout grades 4 to 5. In order to attain grade 4, fixed and
# re-findable survey stations must be made. They have not to be 
necessarily

on
# the walls; tripod-mounted points with a defined length above the 
floor are

# also accepted
grade "UISv1_4" -title "UISv1 survey grade 4"

   # 95.44% of readings are within 

Re: [Therion] UISv1 grades: made a file, please give feedback

2016-11-10 Thread Benedikt Hallinger

Oops, yes, thank you for spotting this!
It must read 0.125 of course!

Am 2016-11-09 15:21, schrieb Footleg:
This looks potentially very useful, but I have not yet explored defining 
sd settings in my survey data. So I may need to learn a bit more in order to 
use it.


I spotted one potential error? In the grade 6 section, the compass bearing 
is to 0.125 degrees. But the clino is stated as 1.125 degrees. I think both 
should be 0.125 right?


Footleg

On Mon, Nov 7, 2016 at 10:17 PM Benedikt Hallinger  wrote:



Hello,

for a recent project i made a grades file (based on the BCRE-example in
therion distribution) for UISv1 specifications (see attachment).
It would be a pleasure for me if it is useful to somebody; it would also 
be

very nice if i could get some feedback on it.

With the naming i had the intention that exporting from databases is 
easily

doable. The prefix is "UISv1_" followed by the actual grades number.
I included all the grades to faciliate documentation inside the th-files, 
so

one can stright export "-1" surveys too.

With best regards,
Benedikt Hallinger

For better archiving and searchability, here is the code reproduced:
 UISv1Grades.th -
encoding utf-8
# UIS Grades - International standard grades specification
#   from: http://www.uisic.uis-speleo.org/UISmappingGrades.pdf [1]
# Version 2 from 14 Sep 2012 (cosmetic update; UISv1 values still apply)
#
# Note: UIS standards says nothing about accuracy of the stations
#       positions, so it is probably good practice to include a
#       "sd position  " definition in your centrelines.
#

# Grade -1: no map available
# Only for database purposes: It means that the cave map has not been 
drawn

yet.
grade "UISv1_-1" -title "UISv1 ungraded survey without map"
   # Not applicaple for therion data.
   # It is mainly here to support automated data exports from
   # databases wich may export such a number.
endgrade

# Grade 0: ungraded
# Only for database purposes. If a cave survey is ungraded, its quality
cannot be
# assessed. This is most usually true for historic or otherwise old maps.
grade "UISv1_0" -title "UISv1 ungraded survey"
   # Nothing defined here.
   # Specifying such an grade may be useful to document that the survey 
was
   # not graded. As it is documented in the *.th-datafiles it may easily 
be

   # searched for. Use it as a kind of "todo" flag...
endgrade

# Grade 1: sketch from memory, not to scale
grade "UISv1_1" -title "UISv1 survey grade 1"
   # nothing defined here.
   # Specifying such an grade may be useful to document that the survey 
was

   # just the result of a sketch and shpuld be redone.
endgrade

# Grade 2: No instruments, from annotations/sketches/estimates
# Map compiled from annotations, sketches and estimates made
# in the cave. No instruments used.
grade "UISv1_2" -title "UISv1 survey grade 2"
   # nothing defined here.
   # Specifying such an grade may be useful to document that the survey
   # was the result of sketches/annotations in the cave.
endgrade

# Grade 3: Rough magnetic/analogue survey
# Directions measured by compass, distances measured by chord,
# pace, or body dimensions. Significant slopes estimated.
#
# A Silva clinometer or comparable, relatively simple means without 
precise
# readings qualify for grade 3. Mapping from head to head of the 
surveyors

# qualifies only for grade 3. Topofil measurements qualify generally for
# grade 3 or 4.
grade "UISv1_3" -title "UISv1 survey grade 3"

   # 95.44% of readings are within 0.5m (2 S.D.)
   length 0.25 metres

   # 95.44% of readings are within 5.0 degrees (2 S.D.)
   bearing 2.50 degrees

   # 95.44% of readings are within 30.0 degrees (2 S.D.)
   # (estimating is allowed, no measurement needed - value guessed by me)
   gradient 15.0 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position  " to your centreline.

endgrade

# Grade 4: Magnetic survey
# Compass and tape survey, using deliberately chosen and fixed
# stations. Slopes measured by clinometer or horizontal and vertical
# components of line.
#
# Topofil measurements may qualify for grade 4 if the survey shots are 
not

too
# long and care is given to correctly read all data. Laser rangefinder 
can

be
# used throughout grades 4 to 5. In order to attain grade 4, fixed and
# re-findable survey stations must be made. They have not to be 
necessarily

on
# the walls; tripod-mounted points with a defined length above the floor 
are

# also accepted
grade "UISv1_4" -title "UISv1 survey grade 4"

   # 95.44% of readings are within 0.1m (2 S.D.)
   length 0.05 metres

   # 95.44% of readings are within 2.0 degrees (2 S.D.)
   bearing 1.00 degrees

   # 95.44% of readings are within 2.0 degrees (2 S.D.)
   gradient 1.00 degrees

   # UIS specifications say nothing about station position accuracy.
   # Add "sd position  " to your centreline.

endgrade

# Grade 5:
# Compass and tape survey. 

Re: [Therion] UISv1 grades: made a file, please give feedback

2016-11-09 Thread Footleg
This looks potentially very useful, but I have not yet explored defining sd
settings in my survey data. So I may need to learn a bit more in order to
use it.

I spotted one potential error? In the grade 6 section, the compass bearing
is to 0.125 degrees. But the clino is stated as 1.125 degrees. I think both
should be 0.125 right?

Footleg

On Mon, Nov 7, 2016 at 10:17 PM Benedikt Hallinger 
wrote:

> Hello,
>
> for a recent project i made a grades file (based on the BCRE-example in
> therion distribution) for UISv1 specifications (see attachment).
> It would be a pleasure for me if it is useful to somebody; it would also be
> very nice if i could get some feedback on it.
>
>
> With the naming i had the intention that exporting from databases is easily
> doable. The prefix is "UISv1_" followed by the actual grades number.
> I included all the grades to faciliate documentation inside the th-files,
> so
> one can stright export "-1" surveys too.
>
>
> With best regards,
> Benedikt Hallinger
>
>
>
>
> For better archiving and searchability, here is the code reproduced:
>  UISv1Grades.th -
> encoding utf-8
> # UIS Grades - International standard grades specification
> #   from: http://www.uisic.uis-speleo.org/UISmappingGrades.pdf
> # Version 2 from 14 Sep 2012 (cosmetic update; UISv1 values still apply)
> #
> # Note: UIS standards says nothing about accuracy of the stations
> #   positions, so it is probably good practice to include a
> #   "sd position  " definition in your centrelines.
> #
>
> # Grade -1: no map available
> # Only for database purposes: It means that the cave map has not been drawn
> yet.
> grade "UISv1_-1" -title "UISv1 ungraded survey without map"
># Not applicaple for therion data.
># It is mainly here to support automated data exports from
># databases wich may export such a number.
> endgrade
>
>
> # Grade 0: ungraded
> # Only for database purposes. If a cave survey is ungraded, its quality
> cannot be
> # assessed. This is most usually true for historic or otherwise old maps.
> grade "UISv1_0" -title "UISv1 ungraded survey"
># Nothing defined here.
># Specifying such an grade may be useful to document that the survey was
># not graded. As it is documented in the *.th-datafiles it may easily be
># searched for. Use it as a kind of "todo" flag...
> endgrade
>
>
> # Grade 1: sketch from memory, not to scale
> grade "UISv1_1" -title "UISv1 survey grade 1"
># nothing defined here.
># Specifying such an grade may be useful to document that the survey was
># just the result of a sketch and shpuld be redone.
> endgrade
>
>
> # Grade 2: No instruments, from annotations/sketches/estimates
> # Map compiled from annotations, sketches and estimates made
> # in the cave. No instruments used.
> grade "UISv1_2" -title "UISv1 survey grade 2"
># nothing defined here.
># Specifying such an grade may be useful to document that the survey
># was the result of sketches/annotations in the cave.
> endgrade
>
>
> # Grade 3: Rough magnetic/analogue survey
> # Directions measured by compass, distances measured by chord,
> # pace, or body dimensions. Significant slopes estimated.
> #
> # A Silva clinometer or comparable, relatively simple means without precise
> # readings qualify for grade 3. Mapping from head to head of the surveyors
> # qualifies only for grade 3. Topofil measurements qualify generally for
> # grade 3 or 4.
> grade "UISv1_3" -title "UISv1 survey grade 3"
>
># 95.44% of readings are within 0.5m (2 S.D.)
>length 0.25 metres
>
># 95.44% of readings are within 5.0 degrees (2 S.D.)
>bearing 2.50 degrees
>
># 95.44% of readings are within 30.0 degrees (2 S.D.)
># (estimating is allowed, no measurement needed - value guessed by me)
>gradient 15.0 degrees
>
># UIS specifications say nothing about station position accuracy.
># Add "sd position  " to your centreline.
>
> endgrade
>
>
> # Grade 4: Magnetic survey
> # Compass and tape survey, using deliberately chosen and fixed
> # stations. Slopes measured by clinometer or horizontal and vertical
> # components of line.
> #
> # Topofil measurements may qualify for grade 4 if the survey shots are not
> too
> # long and care is given to correctly read all data. Laser rangefinder can
> be
> # used throughout grades 4 to 5. In order to attain grade 4, fixed and
> # re-findable survey stations must be made. They have not to be necessarily
> on
> # the walls; tripod-mounted points with a defined length above the floor
> are
> # also accepted
> grade "UISv1_4" -title "UISv1 survey grade 4"
>
># 95.44% of readings are within 0.1m (2 S.D.)
>length 0.05 metres
>
># 95.44% of readings are within 2.0 degrees (2 S.D.)
>bearing 1.00 degrees
>
># 95.44% of readings are within 2.0 degrees (2 S.D.)
>gradient 1.00 degrees
>
># UIS specifications say nothing about station position accuracy.
># Add 

[Therion] UISv1 grades: made a file, please give feedback

2016-11-07 Thread Benedikt Hallinger

Hello,

for a recent project i made a grades file (based on the BCRE-example in 
therion distribution) for UISv1 specifications (see attachment).
It would be a pleasure for me if it is useful to somebody; it would also be 
very nice if i could get some feedback on it.



With the naming i had the intention that exporting from databases is easily 
doable. The prefix is "UISv1_" followed by the actual grades number.
I included all the grades to faciliate documentation inside the th-files, so 
one can stright export "-1" surveys too.



With best regards,
Benedikt Hallinger




For better archiving and searchability, here is the code reproduced:
 UISv1Grades.th -
encoding utf-8
# UIS Grades - International standard grades specification
#   from: http://www.uisic.uis-speleo.org/UISmappingGrades.pdf
# Version 2 from 14 Sep 2012 (cosmetic update; UISv1 values still apply)
#
# Note: UIS standards says nothing about accuracy of the stations
#   positions, so it is probably good practice to include a
#   "sd position  " definition in your centrelines.
#

# Grade -1: no map available
# Only for database purposes: It means that the cave map has not been drawn 
yet.

grade "UISv1_-1" -title "UISv1 ungraded survey without map"
  # Not applicaple for therion data.
  # It is mainly here to support automated data exports from
  # databases wich may export such a number.
endgrade


# Grade 0: ungraded
# Only for database purposes. If a cave survey is ungraded, its quality 
cannot be

# assessed. This is most usually true for historic or otherwise old maps.
grade "UISv1_0" -title "UISv1 ungraded survey"
  # Nothing defined here.
  # Specifying such an grade may be useful to document that the survey was
  # not graded. As it is documented in the *.th-datafiles it may easily be
  # searched for. Use it as a kind of "todo" flag...
endgrade


# Grade 1: sketch from memory, not to scale
grade "UISv1_1" -title "UISv1 survey grade 1"
  # nothing defined here.
  # Specifying such an grade may be useful to document that the survey was
  # just the result of a sketch and shpuld be redone.
endgrade


# Grade 2: No instruments, from annotations/sketches/estimates
# Map compiled from annotations, sketches and estimates made
# in the cave. No instruments used.
grade "UISv1_2" -title "UISv1 survey grade 2"
  # nothing defined here.
  # Specifying such an grade may be useful to document that the survey
  # was the result of sketches/annotations in the cave.
endgrade


# Grade 3: Rough magnetic/analogue survey
# Directions measured by compass, distances measured by chord,
# pace, or body dimensions. Significant slopes estimated.
#
# A Silva clinometer or comparable, relatively simple means without precise
# readings qualify for grade 3. Mapping from head to head of the surveyors
# qualifies only for grade 3. Topofil measurements qualify generally for
# grade 3 or 4.
grade "UISv1_3" -title "UISv1 survey grade 3"

  # 95.44% of readings are within 0.5m (2 S.D.)
  length 0.25 metres

  # 95.44% of readings are within 5.0 degrees (2 S.D.)
  bearing 2.50 degrees

  # 95.44% of readings are within 30.0 degrees (2 S.D.)
  # (estimating is allowed, no measurement needed - value guessed by me)
  gradient 15.0 degrees

  # UIS specifications say nothing about station position accuracy.
  # Add "sd position  " to your centreline.

endgrade


# Grade 4: Magnetic survey
# Compass and tape survey, using deliberately chosen and fixed
# stations. Slopes measured by clinometer or horizontal and vertical
# components of line.
#
# Topofil measurements may qualify for grade 4 if the survey shots are not 
too
# long and care is given to correctly read all data. Laser rangefinder can 
be

# used throughout grades 4 to 5. In order to attain grade 4, fixed and
# re-findable survey stations must be made. They have not to be necessarily 
on

# the walls; tripod-mounted points with a defined length above the floor are
# also accepted
grade "UISv1_4" -title "UISv1 survey grade 4"

  # 95.44% of readings are within 0.1m (2 S.D.)
  length 0.05 metres

  # 95.44% of readings are within 2.0 degrees (2 S.D.)
  bearing 1.00 degrees

  # 95.44% of readings are within 2.0 degrees (2 S.D.)
  gradient 1.00 degrees

  # UIS specifications say nothing about station position accuracy.
  # Add "sd position  " to your centreline.

endgrade


# Grade 5:
# Compass and tape survey. Directions and slope by calibrated
# instruments, distances by fibreglass or metallic tape, or tachometry.
#
# Calibrated DistoX, DUSI or comparable instruments attain grade 5. With a
# calibration of the length measurement, they attain grade 6. If they are
# uncalibrated, they are to be graded with 1! Topofil used for vertical pits
# may reach grade 5. In order to reach grade 5, the survey coordinates have 
to
# be calculated (xyz coordinates, no polar coordinates plotted with scale 
rule

# a d protactor).
grade "UISv1_5" -title "UISv1 survey grade 5"

  # 95.44% of