RE: Configuration Product Types

2019-04-15 Thread james
Karamjeet - Can you post the attachments on google drive or dropbox?

 Original Message 
Subject: Re: Configuration Product Types
From: Pierre Smits 
Date: Mon, April 15, 2019 4:01 am
To: user@ofbiz.apache.org

Hi Karamjeet,

The setup of our mailing list does not allow attachments to go through.

Best regards,

Pierre Smits

*Apache Trafodion , Vice President*
*Apache Directory , PMC Member*
Apache Incubator , committer
*Apache OFBiz , contributor (without
privileges)
since 2008*
Apache Steve , committer


On Mon, Apr 15, 2019 at 12:50 PM Karamjeet Kaur <
karamjeet.k...@viithiisys.com> wrote:

> Hi James,
>
> Production is in-process after create an order and Production is closed
> after build the table.
> Please see in attached screen shot.
> [image: Firefox_Screenshot_2019-04-15T10-37-21.662Z.png]
> [image: Firefox_Screenshot_2019-04-15T10-40-13.267Z.png]
>
> Thanks,
> Karamjeet
>
> On Fri, Apr 12, 2019 at 6:54 PM  wrote:
>
>> Now what does the production order look like to build the table? Does
>> it associate any particular Routing to it?
>>
>>  Original Message 
>> Subject: Re: Configuration Product Types
>> From: Karamjeet Kaur 
>> Date: Fri, April 12, 2019 5:57 am
>> To: user@ofbiz.apache.org
>>
>> In ofbiz we can easy to create sub config items with multiple selection.
>> Let's go with your given 4 components:
>>
>>
>> Table Top (virtual product has 3 Variant 1.round table top 2. square
>> table top 3.rectangular table top.
>> Legs (virtual product has 3 Variant 1.round leg 2. square leg
>> Stretcher (Finished Good)
>> Hardware (Finished Good)
>>
>>
>> After create all above four types of products.Create configurations of
>> all types of items.Go to catalogue manager -> Configurations
>>
>> Add Products Configs in config item.
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>> On Fri, Apr 12, 2019 at 3:55 PM  wrote:
>>
>> Can a configurable good also be a manufactured item where the components
>> of the product changes based on the configuration on the sales Order
>>
>>
>> Let's say there are 4 components
>>
>>
>> Table Top
>> Legs
>> Stretcher
>> Hardware
>>
>>
>> Each of these items are a config item to the product and have different
>> options that can be selected in which the price as well as component
>> can
>> change based on the selection on the sales order. Also If you select a
>> certain table top then there are only a certain time of legs you can
>> select.
>>
>>
>> Once the order is complete we would need a Production Order created
>> with
>> the correct Routing from the base product but with the correct
>> components from the order. Is this possible OTB?
>>
>>
>> Thanks,
>>
>>
>> James
>>
>>
>>  Original Message 
>> Subject: decimal places
>> From: 
>> Date: Thu, April 11, 2019 6:29 pm
>> To: user@ofbiz.apache.org
>>
>> Is there a setting in Ofbiz to increase the decimal points on all
>> prices
>> in Ofbiz? We need at least 4-5 decimal points. Any help is much
>> appreciated.
>>
>> Thanks,
>>
>> James
>>
>


Fwd: Re: Problem creating task and phases in Projects

2019-04-15 Thread Jacques Le Roux




 Message transféré 
Sujet : Re: Problem creating task and phases in Projects
Date :  Mon, 15 Apr 2019 17:12:07 +0530
De :Deepak Dixit 
Répondre à :user@ofbiz.apache.org
Pour :  user@ofbiz.apache.org



Hi,

You can send email to the following address as well

*user*-subscr...@ofbiz.apache.org

Thanks & Regards
--
Deepak Dixit
ofbiz.apache.org


On Mon, Apr 15, 2019 at 2:55 PM ariela.ele...@gmail.com <
ariela.ele...@gmail.com> wrote:


Hello Jacques,

I am trying to find the link to subscribe to the users mailing list, but I
can't find it. It says:
- Log in using a Google Account
- Log in using Apache
  But it doesn't give the option to register.

Could you send me the direct link to subscribe?.

Thank you


On 2019/04/12 11:17:36, Jacques Le Roux 
wrote:

Hi,

Your message has been moderated.

Please subscribe to the user ML for such questions and then use your

email client

See also why here http://ofbiz.apache.org/mailing-lists.html

You will get a better support , it's more fair to share with everybody

and people can answer you on the ML rather than directly to you

The wider the audience the better the answers you might get

Also it's more work for moderators who have to accept your messages as

long as you have not subscribed.

I'll personally no longer accept them (other moderators still could)

Thanks

Jacques

Le 12/04/2019 à 10:27, ariela.ele...@gmail.com a écrit :

Hello,

I have downloaded Apache recently and I am trying to use the Project

section.

I found a few problems and I would like to know if somebody could help

me with them:

- I created a new Project and then I tried to create a few Phases

associated with that project. The phases were created but the start and end
dates are by default today's date, and there is no options to edit the
phases schedule.

- When I try to open the schedule of the new phases nothing happens,

the emerging window does not work.

- When I try to create a new Task, associated with the new phases of

the project, it does not recognize the new phases and gives me the option
to associate the new task to phases of other existing demo projects and not
the new one.

Thank you very much and I will be waiting for your response









Fwd: Re: Problem creating task and phases in Projects

2019-04-15 Thread Jacques Le Roux




 Message transféré 
Sujet : Re: Problem creating task and phases in Projects
Date :  Mon, 15 Apr 2019 11:40:48 +0200
De :Michael Brohl 
Répondre à :user@ofbiz.apache.org
Organisation :  ecomify GmbH
Pour :  user@ofbiz.apache.org



Please see https://ofbiz.apache.org/mailing-lists.html

Regards,

Michael Brohl

ecomify GmbH - www.ecomify.de


Am 15.04.19 um 08:42 schrieb ariela.ele...@gmail.com:

Hello Jacques,

I am trying to find the link to subscribe to the users mailing list, but I 
can't find it. It says:
- Log in using a Google Account
- Log in using Apache
   But it doesn't give the option to register.

Could you send me the direct link to subscribe?.

Thank you


On 2019/04/12 11:17:36, Jacques Le Roux  wrote:

Hi,

Your message has been moderated.

Please subscribe to the user ML for such questions and then use your email 
client
See also why here http://ofbiz.apache.org/mailing-lists.html

You will get a better support , it's more fair to share with everybody  and 
people can answer you on the ML rather than directly to you
The wider the audience the better the answers you might get

Also it's more work for moderators who have to accept your messages as long as 
you have not subscribed.
I'll personally no longer accept them (other moderators still could)

Thanks

Jacques

Le 12/04/2019 à 10:27, ariela.ele...@gmail.com a écrit :

Hello,

I have downloaded Apache recently and I am trying to use the Project section.

I found a few problems and I would like to know if somebody could help me with 
them:

- I created a new Project and then I tried to create a few Phases associated 
with that project. The phases were created but the start and end dates are by 
default today's date, and there is no options to edit the phases schedule.

- When I try to open the schedule of the new phases nothing happens, the 
emerging window does not work.

- When I try to create a new Task, associated with the new phases of the 
project, it does not recognize the new phases and gives me the option to 
associate the new task to phases of other existing demo projects and not the 
new one.

Thank you very much and I will be waiting for your response





Re: Ofbiz Payment Integration

2019-04-15 Thread Shrilesh Korgaonkar
Thank for replies
I'm able to create an external payment

Regards,
Shrilesh K.


On Tue, Apr 9, 2019 at 11:27 AM Rishi Solanki 
wrote:

> Dear Shrilesh,
> Please refer payment method type starts with EXT_ (for example EXT_PAYPAL).
> You may need to follow it, like it never handles the auth request because
> in case of external payment AUTH is payment gateway responsibility and
> taken care by it. Instead of service we do redirection to payment gateway
> service provider URL.
>
> It seems the returnurl you put in the configuration is not able to
> entertain the response from payumoney, you may need to write proper handler
> for that. In short, you can follow the EXT_PAYPAL flow.
>
> Best Regards,
> --
> *Rishi Solanki* | Sr Manager, Enterprise Software Development
> HotWax Systems 
> Plot no. 80, Scheme no. 78 Part 2, Near Brilliant Convention Center,
> Indore,
> M.P 452010
> Linkedin: *Rishi Solanki*
> 
> Direct: +91-9893287847
>
>
> On Mon, Apr 8, 2019 at 5:54 PM Shrilesh Korgaonkar <
> shrilesh.korgaon...@udyogmandir.in> wrote:
>
> > Hi Rishi,
> > Thank for ur reply
> >
> > I was thinking of external payment service like hand over the user to the
> > payment gateway and after payment success or failure, he comes back to
> the
> > website
> > I created a service add a new ext_payumoney
> > this is the error I'm getting
> > org.apache.ofbiz.webapp.control.RequestHandlerException: Illegal
> response;
> > handler could not process request [checkExternalPayment] and event return
> > [payumoney].
> >
> >
> > can u able to help me in that, if possible?
> > And once again thank you, bro,
> >
> >
> > Regards,
> > Shrilesh K.
> >
> > On Fri, Mar 29, 2019 at 2:08 PM Rishi Solanki 
> > wrote:
> >
> >> Dear Shirlesh,
> >> All payment service providers basically 5 methods. Authorize, Capture,
> >> Refund, Void/Release and Settle. To integrate into OFBiz you need to
> write
> >> 5 services depending upon the payment service providers APIs.
> >> To check how they get invoked, please refer ProductStorePaymentSetting
> >> entity and related code in OFBiz. Also check the code in the
> >> PaymentGatewayServices class to see how it uses
> ProductStorePaymentSetting
> >> while doing checkout or payment.
> >>
> >> HTH!
> >>
> >> Best Regards,
> >> --
> >> *Rishi Solanki* | Sr Manager, Enterprise Software Development
> >> HotWax Systems 
> >> Plot no. 80, Scheme no. 78 Part 2, Near Brilliant Convention Center,
> >> Indore,
> >> M.P 452010
> >> Linkedin: *Rishi Solanki*
> >> 
> >> Direct: +91-9893287847
> >>
> >>
> >> On Fri, Mar 29, 2019 at 12:11 PM Shrilesh Korgaonkar <
> >> shrilesh.korgaon...@udyogmandir.in> wrote:
> >>
> >> > *Hi Guys,*
> >> >
> >> > *I'm trying to integrate PayUMoney Or PhonePe or Bhim UPI in ofbiz*
> >> > *did anybody has done that before, **help me if possible?*
> >> > *And if not then can anybody tell*
> >> > *how to Integrate a new payment method or payment gateway?*
> >> > *OR*
> >> > *how does the payment method work or the structure checkout process to
> >> > payment?*
> >> >
> >> >
> >> > *Regards,*
> >> > *Shrilesh K.*
> >> >
> >>
> >
>


Re: Problem creating task and phases in Projects

2019-04-15 Thread Deepak Dixit
Hi,

You can send email to the following address as well

*user*-subscr...@ofbiz.apache.org

Thanks & Regards
--
Deepak Dixit
ofbiz.apache.org


On Mon, Apr 15, 2019 at 2:55 PM ariela.ele...@gmail.com <
ariela.ele...@gmail.com> wrote:

> Hello Jacques,
>
> I am trying to find the link to subscribe to the users mailing list, but I
> can't find it. It says:
> - Log in using a Google Account
> - Log in using Apache
>  But it doesn't give the option to register.
>
> Could you send me the direct link to subscribe?.
>
> Thank you
>
>
> On 2019/04/12 11:17:36, Jacques Le Roux 
> wrote:
> > Hi,
> >
> > Your message has been moderated.
> >
> > Please subscribe to the user ML for such questions and then use your
> email client
> > See also why here http://ofbiz.apache.org/mailing-lists.html
> >
> > You will get a better support , it's more fair to share with everybody
> and people can answer you on the ML rather than directly to you
> > The wider the audience the better the answers you might get
> >
> > Also it's more work for moderators who have to accept your messages as
> long as you have not subscribed.
> > I'll personally no longer accept them (other moderators still could)
> >
> > Thanks
> >
> > Jacques
> >
> > Le 12/04/2019 à 10:27, ariela.ele...@gmail.com a écrit :
> > > Hello,
> > >
> > > I have downloaded Apache recently and I am trying to use the Project
> section.
> > >
> > > I found a few problems and I would like to know if somebody could help
> me with them:
> > >
> > > - I created a new Project and then I tried to create a few Phases
> associated with that project. The phases were created but the start and end
> dates are by default today's date, and there is no options to edit the
> phases schedule.
> > >
> > > - When I try to open the schedule of the new phases nothing happens,
> the emerging window does not work.
> > >
> > > - When I try to create a new Task, associated with the new phases of
> the project, it does not recognize the new phases and gives me the option
> to associate the new task to phases of other existing demo projects and not
> the new one.
> > >
> > > Thank you very much and I will be waiting for your response
> > >
> >
>


Re: Configuration Product Types

2019-04-15 Thread Pierre Smits
Hi Karamjeet,

The setup of our mailing list does not allow attachments to go through.

Best regards,

Pierre Smits

*Apache Trafodion , Vice President*
*Apache Directory , PMC Member*
Apache Incubator , committer
*Apache OFBiz , contributor (without privileges)
since 2008*
Apache Steve , committer


On Mon, Apr 15, 2019 at 12:50 PM Karamjeet Kaur <
karamjeet.k...@viithiisys.com> wrote:

> Hi James,
>
> Production is in-process after create an order and Production is closed
> after build the table.
> Please see in attached screen shot.
> [image: Firefox_Screenshot_2019-04-15T10-37-21.662Z.png]
> [image: Firefox_Screenshot_2019-04-15T10-40-13.267Z.png]
>
> Thanks,
> Karamjeet
>
> On Fri, Apr 12, 2019 at 6:54 PM  wrote:
>
>> Now what does the production order look like to build the table?  Does
>> it associate any particular Routing to it?
>>
>>  Original Message 
>> Subject: Re: Configuration Product Types
>> From: Karamjeet Kaur 
>> Date: Fri, April 12, 2019 5:57 am
>> To: user@ofbiz.apache.org
>>
>> In ofbiz we can easy to create sub config items with multiple selection.
>> Let's go with your given 4 components:
>>
>>
>> Table Top (virtual product has 3 Variant 1.round table top 2. square
>> table top 3.rectangular  table top.
>>  Legs (virtual product has 3 Variant 1.round leg 2. square leg
>>  Stretcher (Finished Good)
>>  Hardware (Finished Good)
>>
>>
>> After create all above four types of products.Create configurations of
>> all types of items.Go to catalogue manager -> Configurations
>>
>> Add Products Configs in config item.
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>> On Fri, Apr 12, 2019 at 3:55 PM  wrote:
>>
>> Can a configurable good also be a manufactured item where the components
>>  of the product changes based on the configuration on the sales Order
>>
>>
>>  Let's say there are 4 components
>>
>>
>>  Table Top
>>  Legs
>>  Stretcher
>>  Hardware
>>
>>
>>  Each of these items are a config item to the product and have different
>>  options that can be selected in which the price as well as component
>> can
>>  change based on the selection on the sales order.  Also If you select a
>>  certain table top then there are only a certain time of legs you can
>>  select.
>>
>>
>>  Once the order is complete we would need a Production Order created
>> with
>>  the correct Routing from the base product but with the correct
>>  components from the order.  Is this possible OTB?
>>
>>
>>  Thanks,
>>
>>
>>  James
>>
>>
>> Original Message 
>>   Subject: decimal places
>>   From: 
>>   Date: Thu, April 11, 2019 6:29 pm
>>   To: user@ofbiz.apache.org
>>
>>   Is there a setting in Ofbiz to increase the decimal points on all
>>  prices
>>   in Ofbiz? We need at least 4-5 decimal points. Any help is much
>>   appreciated.
>>
>>   Thanks,
>>
>>   James
>>
>


Re: Configuration Product Types

2019-04-15 Thread Karamjeet Kaur
Hi James,

Production is in-process after create an order and Production is closed
after build the table.
Please see in attached screen shot.
[image: Firefox_Screenshot_2019-04-15T10-37-21.662Z.png]
[image: Firefox_Screenshot_2019-04-15T10-40-13.267Z.png]

Thanks,
Karamjeet

On Fri, Apr 12, 2019 at 6:54 PM  wrote:

> Now what does the production order look like to build the table?  Does
> it associate any particular Routing to it?
>
>  Original Message 
> Subject: Re: Configuration Product Types
> From: Karamjeet Kaur 
> Date: Fri, April 12, 2019 5:57 am
> To: user@ofbiz.apache.org
>
> In ofbiz we can easy to create sub config items with multiple selection.
> Let's go with your given 4 components:
>
>
> Table Top (virtual product has 3 Variant 1.round table top 2. square
> table top 3.rectangular  table top.
>  Legs (virtual product has 3 Variant 1.round leg 2. square leg
>  Stretcher (Finished Good)
>  Hardware (Finished Good)
>
>
> After create all above four types of products.Create configurations of
> all types of items.Go to catalogue manager -> Configurations
>
> Add Products Configs in config item.
>
>
>
>
>
>
>
>
>
>
>
> On Fri, Apr 12, 2019 at 3:55 PM  wrote:
>
> Can a configurable good also be a manufactured item where the components
>  of the product changes based on the configuration on the sales Order
>
>
>  Let's say there are 4 components
>
>
>  Table Top
>  Legs
>  Stretcher
>  Hardware
>
>
>  Each of these items are a config item to the product and have different
>  options that can be selected in which the price as well as component
> can
>  change based on the selection on the sales order.  Also If you select a
>  certain table top then there are only a certain time of legs you can
>  select.
>
>
>  Once the order is complete we would need a Production Order created
> with
>  the correct Routing from the base product but with the correct
>  components from the order.  Is this possible OTB?
>
>
>  Thanks,
>
>
>  James
>
>
> Original Message 
>   Subject: decimal places
>   From: 
>   Date: Thu, April 11, 2019 6:29 pm
>   To: user@ofbiz.apache.org
>
>   Is there a setting in Ofbiz to increase the decimal points on all
>  prices
>   in Ofbiz? We need at least 4-5 decimal points. Any help is much
>   appreciated.
>
>   Thanks,
>
>   James
>


Re: Problem creating task and phases in Projects

2019-04-15 Thread Michael Brohl

Please see https://ofbiz.apache.org/mailing-lists.html

Regards,

Michael Brohl

ecomify GmbH - www.ecomify.de


Am 15.04.19 um 08:42 schrieb ariela.ele...@gmail.com:

Hello Jacques,

I am trying to find the link to subscribe to the users mailing list, but I 
can't find it. It says:
- Log in using a Google Account
- Log in using Apache
  But it doesn't give the option to register.

Could you send me the direct link to subscribe?.

Thank you


On 2019/04/12 11:17:36, Jacques Le Roux  wrote:

Hi,

Your message has been moderated.

Please subscribe to the user ML for such questions and then use your email 
client
See also why here http://ofbiz.apache.org/mailing-lists.html

You will get a better support , it's more fair to share with everybody  and 
people can answer you on the ML rather than directly to you
The wider the audience the better the answers you might get

Also it's more work for moderators who have to accept your messages as long as 
you have not subscribed.
I'll personally no longer accept them (other moderators still could)

Thanks

Jacques

Le 12/04/2019 à 10:27, ariela.ele...@gmail.com a écrit :

Hello,

I have downloaded Apache recently and I am trying to use the Project section.

I found a few problems and I would like to know if somebody could help me with 
them:

- I created a new Project and then I tried to create a few Phases associated 
with that project. The phases were created but the start and end dates are by 
default today's date, and there is no options to edit the phases schedule.

- When I try to open the schedule of the new phases nothing happens, the 
emerging window does not work.

- When I try to create a new Task, associated with the new phases of the 
project, it does not recognize the new phases and gives me the option to 
associate the new task to phases of other existing demo projects and not the 
new one.

Thank you very much and I will be waiting for your response





smime.p7s
Description: S/MIME Cryptographic Signature


Re: Problem creating task and phases in Projects

2019-04-15 Thread ariela . elelog
Hello Jacques, 

I am trying to find the link to subscribe to the users mailing list, but I 
can't find it. It says:
- Log in using a Google Account
- Log in using Apache
 But it doesn't give the option to register. 

Could you send me the direct link to subscribe?.

Thank you


On 2019/04/12 11:17:36, Jacques Le Roux  wrote: 
> Hi,
> 
> Your message has been moderated.
> 
> Please subscribe to the user ML for such questions and then use your email 
> client
> See also why here http://ofbiz.apache.org/mailing-lists.html
> 
> You will get a better support , it's more fair to share with everybody  and 
> people can answer you on the ML rather than directly to you
> The wider the audience the better the answers you might get
> 
> Also it's more work for moderators who have to accept your messages as long 
> as you have not subscribed.
> I'll personally no longer accept them (other moderators still could)
> 
> Thanks
> 
> Jacques
> 
> Le 12/04/2019 à 10:27, ariela.ele...@gmail.com a écrit :
> > Hello,
> >
> > I have downloaded Apache recently and I am trying to use the Project 
> > section.
> >
> > I found a few problems and I would like to know if somebody could help me 
> > with them:
> >
> > - I created a new Project and then I tried to create a few Phases 
> > associated with that project. The phases were created but the start and end 
> > dates are by default today's date, and there is no options to edit the 
> > phases schedule.
> >
> > - When I try to open the schedule of the new phases nothing happens, the 
> > emerging window does not work.
> >
> > - When I try to create a new Task, associated with the new phases of the 
> > project, it does not recognize the new phases and gives me the option to 
> > associate the new task to phases of other existing demo projects and not 
> > the new one.
> >
> > Thank you very much and I will be waiting for your response
> >
>