Re: [Veritas-bu] New veritas installation - jobs do not start inparallel, all else queueing

2006-09-10 Thread Bobby Williams
Title: New veritas installation - jobs do not start in parallel, all else queueing



By default, only one job per client. (which is not a 
bad thing). You may want to check that global setting on the 
master.

Another thing to check is how many multiplexed streams did 
you allow for in your schedules?

Understand the problems with multiplexing before just 
raising the numbers.

Bobby Williams 
2205 Peterson 
Drive Chattanooga, Tennessee 37421 423-296-8200 



From: [EMAIL PROTECTED] 
[mailto:[EMAIL PROTECTED] On Behalf Of Wessam 
AlySent: Saturday, September 09, 2006 8:18 AMTo: 
veritas-bu@mailman.eng.auburn.eduSubject: [Veritas-bu] New veritas 
installation - jobs do not start inparallel, all else 
queueing

Hey all, 
I just started a new instakllation of Veritas 
Netbackup Entreprise 5.1 MP4. I have 2 LTO3 drives in an STK L500 
library.
The 2-drive storage unit is configured for MPX 3 and 
with no max frag limit. 
Whenever I start a new job (configured for multiple 
streams), Always only one stream starts writing to one drive, the the rest of 
jobs are idle. The other drive is sitting idle. The job is configured with 3 or 
more streams.
What could be the problem ? 
Thanks, Wessam 
Aly Senior UNIX  Storage Systems 
Admin. ***IMPORTANTConfidentiality: This 
e-mail communication and any attachments thereto contain information which is 
confidential and are intended only for the use of the individuals or entities 
named above. If you are not the intended recipient, you are hereby notified that 
any disclosure, copying, distribution or the taking any action in reliance on 
the contents of these documents is strictly prohibited and may be illegal. 
Please notify us of your receipt of this e-mail in error and delete the e-mail 
and any copies of it.Monitoring/Viruses: Mobinil may monitor all 
incoming  outgoing e-mails in line with current legislation. Although we 
have taken steps to ensure that this e-mail and attachments are free from any 
Virus, we advise that in keeping with good computing practice the recipient 
should ensure they are actually virus free.The Egyptian Company for 
Mobile Services (Mobinil) www.mobinil.com***
___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


Re: [Veritas-bu] New veritas installation - jobs do not start inparallel, all else queueing

2006-09-10 Thread Jerry Vochteloo
Title: New veritas installation - jobs do not start in parallel, all else queueing



There are are multiple settings that control the number 
of jobs that run at the same time (a little annoying at first, but great for 
flexibility in complex environments)

Multiplexing: need to set the max mpxin both the 
storage unit and the schedule

Multistreaming: need to set allow multiple datastreams 
in the policy attributes

and (the one I would bet you don't have set currently 
:)

Host properties- master server - global 
netbackup attributes - max jobs per client (need to be set greater then 
one)

if you do all these and it still doesn't work (stop and 
restart nbu) and try again, if it still doesn't work check 
that

max jobs this client hasn't been set for that 
particular client.

hth

j

--Jerry Vochteloow: +61-2-8220-7043, m: +61 408 206 
748The opinions stated here are mine and do not necessarily represent 
those ofSymantec Corp



From: [EMAIL PROTECTED] 
[mailto:[EMAIL PROTECTED] On Behalf Of Wessam 
AlySent: Saturday, 9 September 2006 10:18 PMTo: 
veritas-bu@mailman.eng.auburn.eduSubject: [Veritas-bu] New veritas 
installation - jobs do not start inparallel, all else 
queueing

Hey all, 
I just started a new instakllation of Veritas 
Netbackup Entreprise 5.1 MP4. I have 2 LTO3 drives in an STK L500 
library.
The 2-drive storage unit is configured for MPX 3 and 
with no max frag limit. 
Whenever I start a new job (configured for multiple 
streams), Always only one stream starts writing to one drive, the the rest of 
jobs are idle. The other drive is sitting idle. The job is configured with 3 or 
more streams.
What could be the problem ? 
Thanks, Wessam 
Aly Senior UNIX  Storage Systems 
Admin. ***IMPORTANTConfidentiality: This 
e-mail communication and any attachments thereto contain information which is 
confidential and are intended only for the use of the individuals or entities 
named above. If you are not the intended recipient, you are hereby notified that 
any disclosure, copying, distribution or the taking any action in reliance on 
the contents of these documents is strictly prohibited and may be illegal. 
Please notify us of your receipt of this e-mail in error and delete the e-mail 
and any copies of it.Monitoring/Viruses: Mobinil may monitor all 
incoming  outgoing e-mails in line with current legislation. Although we 
have taken steps to ensure that this e-mail and attachments are free from any 
Virus, we advise that in keeping with good computing practice the recipient 
should ensure they are actually virus free.The Egyptian Company for 
Mobile Services (Mobinil) www.mobinil.com***


smime.p7s
Description: S/MIME cryptographic signature
___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


[Veritas-bu] NBU 6 Sharepoint question

2006-09-10 Thread Wilkinson, Tim



Hi,

I'm getting to know 
NBU better as time goes but know very little about Sharepoint, so hopefully 
someone can shed a bit of light on this scenario.
We had a Sharepoint 
server (we'll call this Sharepoint1) and this was being backed up using the 
Sharepoint agent fine. Now the dbs have been moved (apparently - this was done 
by someone else) to another server (we'll call this Sharepoint2). The IIS 
Sharepoint interface is still run from Sharepoint1.
I didn't know the 
dbs had been moved, so kicked off a job manually this morning (there had been 
other issues last week so backups didn't run on weekend). It seems to have split 
into 2 child jobs; it started running and successfully backed up the second 
child job (what it refers to as 'INDEX DB1') but fails with4 other dbs in 
the other child job (Configuration DB, Content DB, User Profile DB and Services 
DB).
Sharepoint (and 
perhaps NBU) appears to know about the fact the dbs are on 'Sharepoint2' (NBU is 
trying to connect to Sharepoint2) but it fails as there is no NBU client on 
Sharepoint2 (there will be). 
I suspect when NBU 
client is installed on Sharepoint2, it maybe able to connect this way, using 
Sharepoint1 as the 'gateway' (not sure of the correct term but it is still used 
to connect to Sharepoint; only the dbs have been moved to Sharepoint2). Will I 
need to backup Sharepoint2 with the Sharepoint agent also, or should backing up 
Sharepoint1 take care of this, providing there is a client on Sharepoint 
2?
Cheers,

  - 
  Tim Wilkinson I.T. Support Officer Science 
  Corporate Information Systems Defence 
  Science  Technology Organisation Department of Defence 
  Tel: (02) 96921484 Fax: (02) 96921562 Email: [EMAIL PROTECTED] 

___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


[Veritas-bu] DSU - Update

2006-09-10 Thread WEAVER, Simon
Title: Message



All
I 
have been testing DSU backups, and must admit I have not been impressed with the 
throughput to disk.

I 
ran a particular job over the weekend. Setup as 
follows:

LAN Client normally takes 2-3hours via Tape LTO3 HP 
ESL
Created a Disk on my Master 
Server
Configured a DSU with phase 2
Set the policy to use the newly created storage 
unit.
Let the backup run.

The backup took 4 hours (just over). However, writing to tape (I 
guess when it does its duplication) took under 1 
hour.

The Disk that was presented to my Master is a VDISK from a HP EVA 
using Fibre SCSI disks. Essentially the HP EVA is a large SAN, and you can 
create volumes and present them to a specific 
Server.

Have I missed something here, or is it a case that my Tape Setup 
(that is all fibre channel connected) is actually running better than I 
thought.

Thanks

Regards
Simon Weaver3rd Line Technical SupportWindows 
Domain Administrator 
EADS Astrium 
Limited, B23AA IM (DCS)Anchorage Road, Portsmouth, PO3 
5PU
Email: 
[EMAIL PROTECTED]


This email is for the intended addressee only.
If you have received it in error then you must not use, retain, disseminate or otherwise deal with it.
Please notify the sender by return email.
The views of the author may not necessarily constitute the views of Astrium Limited.
Nothing in this email shall bind Astrium Limited in any contract or obligation.

Astrium Limited, Registered in England and Wales No. 2449259
Registered Office: Gunnels Wood Road, Stevenage, Hertfordshire, SG1 2AS, England
___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


Re: [Veritas-bu] New Veritas installation - jobs do not start in parallel, all else queuing

2006-09-10 Thread WEAVER, Simon
Title: Message



What about your Max Jobs setting on the master - make
sure this is set to a high number - 99 as an
example.

Storage Unit must be set for a high number as well as the schedule
for the policy.


Regards
Simon Weaver3rd Line Technical SupportWindows
Domain Administrator 
EADS Astrium
Limited, B23AA IM (DCS)Anchorage Road, Portsmouth, PO3
5PU
Email:
[EMAIL PROTECTED]

  
  -Original Message-From: Wessam Aly
  [mailto:[EMAIL PROTECTED] Sent: 09 September 2006
  17:11To: Haskins, SteveCc:
  veritas-bu@mailman.eng.auburn.eduSubject: Re: [Veritas-bu] New
  Veritas installation - jobs do not start inparallel, all else
  queuing
  
  no
  not a shadow copy, its in queueing state, even though the other drive is
  sitting idle with no jobs.
  Wessam Aly
  Senior UNIX  Storage
  Systems Admin. HPUX-CSA Certified Systems Administrator
  
  
  From: Haskins, Steve
  [mailto:[EMAIL PROTECTED] Sent: Saturday, 09
  September, 2006 16:08To: Wessam AlySubject: RE:
  [Veritas-bu] New Veritas installation - jobs do not start in parallel, all
  else queuing
  
  
  
  Is the one active job
  the system state or shadow copy components? Since I updated to 5.1 from 4.5
  this has been the behaviour.
  
  Regards
  
  
  
  
  
  From:
  [EMAIL PROTECTED]
  [mailto:[EMAIL PROTECTED] On Behalf Of Wessam AlySent: Saturday, September 09, 2006 5:18
  AMTo:
  veritas-bu@mailman.eng.auburn.eduSubject: [Veritas-bu] New veritas
  installation - jobs do not start inparallel, all else
  queueing
  
  Hey all,
  
  I just started a new
  instakllation of Veritas Netbackup Entreprise 5.1 MP4. I have 2 LTO3 drives in
  an STK L500 library.
  The 2-drive storage unit is
  configured for MPX 3 and with no max frag limit. 
  Whenever I start a new job
  (configured for multiple streams), Always only one stream starts writing to
  one drive, the the rest of jobs are idle. The other drive is sitting idle. The
  job is configured with 3 or more streams.
  What could be the problem
  ? 
  Thanks, Wessam
  Aly Senior UNIX  Storage Systems
  Admin. 
  ***IMPORTANTConfidentiality:
  This e-mail communication and any attachments thereto contain information
  which is confidential and are intended only for the use of the individuals or
  entities named above. If you are not the intended recipient, you are hereby
  notified that any disclosure, copying, distribution or the taking any action
  in reliance on the contents of these documents is strictly prohibited and may
  be illegal. Please notify us of your receipt of this e-mail in error and
  delete the e-mail and any copies of it.Monitoring/Viruses: Mobinil may
  monitor all incoming  outgoing e-mails in line with current legislation.
  Although we have taken steps to ensure that this e-mail and attachments are
  free from any Virus, we advise that in keeping with good computing practice
  the recipient should ensure they are actually virus free.The Egyptian
  Company for Mobile Services (Mobinil)
  www.mobinil.com**IMPORTANTConfidentiality:
  This e-mail communication and any attachments thereto contain information
  which is confidential and are intended only for the use of the individuals or
  entities named above. If you are not the intended recipient, you are hereby
  notified that any disclosure, copying, distribution or the taking any action
  in reliance on the contents of these documents is strictly prohibited and may
  be illegal. Please notify us of your receipt of this e-mail in error and
  delete the e-mail and any copies of it.Monitoring/Viruses: Mobinil may
  monitor all incoming  outgoing e-mails in line with current legislation.
  Although we have taken steps to ensure that this e-mail and attachments are
  free from any Virus, we advise that in keeping with good computing practice
  the recipient should ensure they are actually virus free.The Egyptian
  Company for Mobile Services (Mobinil)
www.mobinil.com***

This email is for the intended addressee only.
If you have received it in error then you must not use, retain, disseminate or otherwise deal with it.
Please notify the sender by return email.
The views of the author may not necessarily constitute the views of Astrium Limited.
Nothing in this email shall bind Astrium Limited in any contract or obligation.

Astrium Limited, Registered in England and Wales No. 2449259
Registered Office: Gunnels Wood Road, Stevenage, Hertfordshire, SG1 2AS, England
___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu