Re: [Veritas-bu] Disk Staging to tape

2010-11-19 Thread Todd Jackxon
Thanks Rusty

The need is actually a requirement created by the business, not my personal
decision.

We are actually licensed for Advanced Disk to set this up however needed.
So if the best approach is SLP we are totally licensed (Capacity Licensing).
Which manual is it that addresses using cron?

Thanks

-Jack

On Fri, Nov 19, 2010 at 11:57 AM,  wrote:

>
> If that's what you want to do, then Nic's suggestion is the best for you.
> It's also probably the cheapest as SLP requires Advanced Disk and associated
> licensing.
>
> However, if you want to use SLP in that manner, then you will have to
> utilize cron to disable and enable SLP for the times you want it to run. It
> is specifically designed to get the duplications completed as soon as it can
> and therefore does not (currently) have a window like classic DSSUs. Using
> cron is actually mentioned in the manual or best practice guide so it is a
> recognized workaround.
>
> I'm curious what your need is to schedule it to tape on certain days?
>
> *Rusty Major, MCSE, BCFP, VCS* ▪ Sr. Storage Engineer ▪ SunGard
> Availability Services ▪ 757 N. Eldridge Suite 200, Houston TX 77079 ▪
> 281-584-4693
> Keeping People and Information Connected® ▪ *
> http://availability.sungard.com/* 
> P *Think before you print*
> CONFIDENTIALITY:  This e-mail (including any attachments) may contain
> confidential, proprietary and privileged information, and unauthorized
> disclosure or use is prohibited.  If you received this e-mail in error,
> please notify the sender and delete this e-mail from your system.
>
>
>   *Nic Solomons *
> Sent by: 
>
> 11/19/2010 08:54 AM
>To
> "netbackup.i...@gmail.com" 
> cc
>  "veritas-bu@mailman.eng.auburn.edu" 
>  Subject
> Re: [Veritas-bu] Disk Staging to tape
>
>
>
>
> Oh, yeah, sorry.
>
> In brief:
> -Create a basic DSSU.
> -Backup policies as per normal (i.e. daily jobs, after hours, whatever you
> do), pointed at your newly created DSSU as the destination storage unit.
> -DSSU configured with a schedule (either using the GUI, or bpschedule –
> which works similar to bpplsched, but is just for DSSUs); the schedule in
> the DSSU specifies your destination storage unit / volume etc (which is how
> you get it to tape), and this is where you specify the 2 days you want it to
> go to tape.
>
> If you want anymore info on it, let me know.
>
> Cheers,
> Nic
>
> *From:* Todd Jackxon [mailto:netbackup.i...@gmail.com] *
> Sent:* 19 November 2010 13:35*
> To:* Nic Solomons*
> Subject:* Re: [Veritas-bu] Disk Staging to tape
>
> Hi Nic
>
> Thanks for the follow up. Can you briefly decribe how you would set this up
> or have set this up?
> I'm trying to understand the how both , disk and tape, policies would
> combine.
>
> It doesn't need to use an SLP - whichever works best
>
> Thanks again
>
> Jack
> On Fri, Nov 19, 2010 at 1:36 AM, Nic Solomons 
> <*nic.solom...@attenda.net*>
> wrote:
> Do you specifically need to use an SLP?
>
> What you want to do can be achieved easily with a basic DSSU.
> The destage schedule works like a normal policy schedule, so only running
> on 2 specific days a week is a simple proposition...
>
>
> Cheers,
> Nic
>
> - Reply message -
> From: "Todd Jackxon" <*netbackup.info* @*gmail.com
> * >
> Date: Fri, Nov 19, 2010 05:39
> Subject: [Veritas-bu] Disk Staging to tape
> To: "*veritas...@mailman.eng.auburn.edu*"
> <*veritas...@mailman.eng.auburn.edu* >
>
> Hello
>
> I am working on a plan to backup clients to disk and later stage these off
> to tape.
> Can anyone elaborate how this is being done from your end?
>
> Basic Idea:
>
> Backups occur daily to disk and the business would like to stage these to
> tape twice a week.
>
> Creating a Life Cycle policy I can run a backup job and a duplication job
> to tape but there is no
> way to schedule this to tape on certain days. Just the ability to run a
> duplication job.
>
> Within a normal policy you can run an inline copy to run concurrently (up
> to 4 storage units) but this
> appears to be backups running at the same time.
>
> How can I combine these methods (or use another method) to run my life
> cycle policy backup and then
> stage these to tape on a Tuesday and Thursday? Any information would be
> appreciated.
>
> Thanks
>
> Jack
> The information contained in this e-mail and its attachments is
> confidential.
> It is intended only for the named address(es) and may not be disclosed to
> anyone else without Attenda's consent.
>
>
>
>
> The information contained in this e-mail and its attachments is
> confidential. It is intended only for the named address(es) and may not be
> disclosed to anyone else without Attenda's consent.
> ___
> Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
> http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
>
>
___
Veritas-bu maillist  -  Veritas-bu@mail

Re: [Veritas-bu] Policies not populating after the upgrade from 6.5.3 to 7.0.

2010-11-19 Thread Saran Brar

Thanks for the reply but java is already upgraded to 7.0.1. One thing i noticed 
that if we open and close java console a few times, policies do populate.

Regards,

Saranjit Singh Brar





> To: VERITAS-BU@MAILMAN.ENG.AUBURN.EDU
> From: netbackup-fo...@backupcentral.com
> Date: Fri, 19 Nov 2010 13:45:31 -0500
> Subject: [Veritas-bu] Policies not populating after the upgrade from 6.5.3
> to 7.0.
> 
> I know with some previous versions we had to upgrade Java separately so make 
> sure that Java is upgraded to 7.0.
> 
> +--
> |This was sent by daniel.jime...@owb.com via Backup Central.
> |Forward SPAM to ab...@backupcentral.com.
> +--
> 
> 
> ___
> Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
> http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
  ___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


[Veritas-bu] Policies not populating after the upgrade from 6.5.3 to 7.0.

2010-11-19 Thread stangz
I know with some previous versions we had to upgrade Java separately so make 
sure that Java is upgraded to 7.0.

+--
|This was sent by daniel.jime...@owb.com via Backup Central.
|Forward SPAM to ab...@backupcentral.com.
+--


___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


Re: [Veritas-bu] Disk Staging to tape

2010-11-19 Thread Rusty.Major
If that's what you want to do, then Nic's suggestion is the best for you. 
It's also probably the cheapest as SLP requires Advanced Disk and 
associated licensing.

However, if you want to use SLP in that manner, then you will have to 
utilize cron to disable and enable SLP for the times you want it to run. 
It is specifically designed to get the duplications completed as soon as 
it can and therefore does not (currently) have a window like classic 
DSSUs. Using cron is actually mentioned in the manual or best practice 
guide so it is a recognized workaround.

I'm curious what your need is to schedule it to tape on certain days?

Rusty Major, MCSE, BCFP, VCS ▪ Sr. Storage Engineer ▪ SunGard 
Availability Services ▪ 757 N. Eldridge Suite 200, Houston TX 77079 ▪ 
281-584-4693
Keeping People and Information Connected® ▪ 
http://availability.sungard.com/ 
P Think before you print 
CONFIDENTIALITY:  This e-mail (including any attachments) may contain 
confidential, proprietary and privileged information, and unauthorized 
disclosure or use is prohibited.  If you received this e-mail in error, 
please notify the sender and delete this e-mail from your system. 



Nic Solomons  
Sent by: 
11/19/2010 08:54 AM

To
"netbackup.i...@gmail.com" 
cc
"veritas-bu@mailman.eng.auburn.edu" 
Subject
Re: [Veritas-bu] Disk Staging to tape






Oh, yeah, sorry.
 
In brief:
-Create a basic DSSU.
-Backup policies as per normal (i.e. daily jobs, after hours, whatever you 
do), pointed at your newly created DSSU as the destination storage unit.
-DSSU configured with a schedule (either using the GUI, or bpschedule – 
which works similar to bpplsched, but is just for DSSUs); the schedule in 
the DSSU specifies your destination storage unit / volume etc (which is 
how you get it to tape), and this is where you specify the 2 days you want 
it to go to tape.
 
If you want anymore info on it, let me know.
 
Cheers,
Nic
 
From: Todd Jackxon [mailto:netbackup.i...@gmail.com] 
Sent: 19 November 2010 13:35
To: Nic Solomons
Subject: Re: [Veritas-bu] Disk Staging to tape
 
Hi Nic
 
Thanks for the follow up. Can you briefly decribe how you would set this 
up or have set this up?
I'm trying to understand the how both , disk and tape, policies would 
combine.
 
It doesn't need to use an SLP - whichever works best
 
Thanks again
 
Jack
On Fri, Nov 19, 2010 at 1:36 AM, Nic Solomons  
wrote:
Do you specifically need to use an SLP?

What you want to do can be achieved easily with a basic DSSU.
The destage schedule works like a normal policy schedule, so only running 
on 2 specific days a week is a simple proposition...


Cheers,
Nic

- Reply message -
From: "Todd Jackxon" 
Date: Fri, Nov 19, 2010 05:39
Subject: [Veritas-bu] Disk Staging to tape
To: "veritas-bu@mailman.eng.auburn.edu" 

Hello

I am working on a plan to backup clients to disk and later stage these off 
to tape.
Can anyone elaborate how this is being done from your end?

Basic Idea:

Backups occur daily to disk and the business would like to stage these to 
tape twice a week.

Creating a Life Cycle policy I can run a backup job and a duplication job 
to tape but there is no
way to schedule this to tape on certain days. Just the ability to run a 
duplication job.

Within a normal policy you can run an inline copy to run concurrently (up 
to 4 storage units) but this
appears to be backups running at the same time.

How can I combine these methods (or use another method) to run my life 
cycle policy backup and then
stage these to tape on a Tuesday and Thursday? Any information would be 
appreciated.

Thanks

Jack
The information contained in this e-mail and its attachments is 
confidential.
It is intended only for the named address(es) and may not be disclosed to 
anyone else without Attenda's consent.

 

The information contained in this e-mail and its attachments is 
confidential. It is intended only for the named address(es) and may not be 
disclosed to anyone else without Attenda's consent. 
___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu


Re: [Veritas-bu] Disk Staging to tape

2010-11-19 Thread Nic Solomons
Oh, yeah, sorry.

In brief:
-Create a basic DSSU.
-Backup policies as per normal (i.e. daily jobs, after hours, whatever you do), 
pointed at your newly created DSSU as the destination storage unit.
-DSSU configured with a schedule (either using the GUI, or bpschedule - which 
works similar to bpplsched, but is just for DSSUs); the schedule in the DSSU 
specifies your destination storage unit / volume etc (which is how you get it 
to tape), and this is where you specify the 2 days you want it to go to tape.

If you want anymore info on it, let me know.

Cheers,
Nic

From: Todd Jackxon [mailto:netbackup.i...@gmail.com]
Sent: 19 November 2010 13:35
To: Nic Solomons
Subject: Re: [Veritas-bu] Disk Staging to tape

Hi Nic

Thanks for the follow up. Can you briefly decribe how you would set this up or 
have set this up?
I'm trying to understand the how both , disk and tape, policies would combine.

It doesn't need to use an SLP - whichever works best

Thanks again

Jack
On Fri, Nov 19, 2010 at 1:36 AM, Nic Solomons 
mailto:nic.solom...@attenda.net>> wrote:
Do you specifically need to use an SLP?

What you want to do can be achieved easily with a basic DSSU.
The destage schedule works like a normal policy schedule, so only running on 2 
specific days a week is a simple proposition...


Cheers,
Nic

- Reply message -
From: "Todd Jackxon" 
http://netbackup.info/>@gmail.com>
Date: Fri, Nov 19, 2010 05:39
Subject: [Veritas-bu] Disk Staging to tape
To: 
"veritas-bu@mailman.eng.auburn.edu" 
mailto:veritas-bu@mailman.eng.auburn.edu>>

Hello

I am working on a plan to backup clients to disk and later stage these off to 
tape.
Can anyone elaborate how this is being done from your end?

Basic Idea:

Backups occur daily to disk and the business would like to stage these to tape 
twice a week.

Creating a Life Cycle policy I can run a backup job and a duplication job to 
tape but there is no
way to schedule this to tape on certain days. Just the ability to run a 
duplication job.

Within a normal policy you can run an inline copy to run concurrently (up to 4 
storage units) but this
appears to be backups running at the same time.

How can I combine these methods (or use another method) to run my life cycle 
policy backup and then
stage these to tape on a Tuesday and Thursday? Any information would be 
appreciated.

Thanks

Jack
The information contained in this e-mail and its attachments is confidential.
It is intended only for the named address(es) and may not be disclosed to 
anyone else without Attenda's consent.




The information contained in this e-mail and its attachments is confidential.
It is intended only for the named address(es) and may not be disclosed to 
anyone else without Attenda's consent.

___
Veritas-bu maillist  -  Veritas-bu@mailman.eng.auburn.edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu