Re: [Veritas-bu] Duplication job
On Wed, Jan 07, 2009 at 07:16:26PM +0200, Asiye Yigit wrote: > We have duplicated some tapes using catalog backup. After duplication, > when we search the images from the original copy, > > It says skipping media id xx it has already two copies. What do you mean by "search the images"? What commands are you running that generate that output? -- Darren ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
[Veritas-bu] Duplication job
Hello, We have duplicated some tapes using catalog backup. After duplication, when we search the images from the original copy, It says skipping media id xx it has already two copies. What is the reason? Duplication process can expire the images on the primary copy? Regards, ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
RE: [Veritas-bu] Duplication job killing NB Catalog job
I've come across step2. Weird bug!! Jim -Original Message- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Eagle, Kent Sent: Tuesday, January 10, 2006 4:16 PM To: veritas-bu@mailman.eng.auburn.edu Subject: [Veritas-bu] Duplication job killing NB Catalog job Greetings, Windoze 2K3 Master & 2 Media servers, NetBackup 5.1MP3 SSO, ADIC I2000 fiber LTO2. I have 2 interrelated questions: 1. We have 2 clients being backed up to the same DSU. The clients reside in independent policies, but are often running concurrently, for at least part of their active time. We have a duplication job we've set up as a vault profile to duplicate the images to tapes. The profile is currently being launched manually by an operator when they see both jobs have completed. I would like to automate this process, but can't find any verbose notes on bpend_notify.bat, which I think will do what I want? (P.S. - Windoze isn't my choice: I'm fairly familiar with batch files & not afraid of the CLI ;-) 2. Other backups are running and completing while the process above is transpiring. We've noticed that if all other jobs but the duplication process have completed, NetBackup will attempt to run a catalog backup. This results in a failure of the catalog backup with a "124" error which says the one of directories was not available for backup. My guess is it's one of the Master Servers catalog paths as it's still running the duplication process. Manually running the catalog after this scenario is always successful. If the duplication process and all other jobs have completed the catalog backup is always successful. Is there a way to have NetBackup treat the duplication step like a regular backup job so it will not attempt a catalog backup during the dup? I can't figure out why NB thinks the schema is quiesed when this process is still running? We could try to script it to run after the duplication process, but the duplication process wouldn't necessarily always be the last job to run (due to growth, we might have other backups still running after duplication has completed). Thank you, Kent C. Eagle Wilmington Trust Company Systems Engineer, MCP, MCSE Tech Services / SMSS [EMAIL PROTECTED] Visit our website at www.wilmingtontrust.com Investment products are not insured by the FDIC or any other governmental agency, are not deposits of or other obligations of or guaranteed by Wilmington Trust or any other bank or entity, and are subject to risks, including a possible loss of the principal amount invested. This e-mail and any files transmitted with it may contain confidential and/or proprietary information. It is intended solely for the use of the individual or entity who is the intended recipient. Unauthorized use of this information is prohibited. If you have received this in error, please contact the sender by replying to this message and delete this material from any system it may be on. ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
RE: [Veritas-bu] Duplication job killing NB Catalog job
Take a look at session_notify, this run when all the scheduled jobs are complete. I don't know if it runs before, after or concurrently with the catalog backup. You could always set catalog backup to manual and the run bpbackupdb from the session_notify script. Patrick Whelan NetBackup Specialist Architect & Engineering -Original Message- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Eagle, Kent Sent: 10 January 2006 14:16 To: veritas-bu@mailman.eng.auburn.edu Subject: [Veritas-bu] Duplication job killing NB Catalog job Greetings, Windoze 2K3 Master & 2 Media servers, NetBackup 5.1MP3 SSO, ADIC I2000 fiber LTO2. I have 2 interrelated questions: 1. We have 2 clients being backed up to the same DSU. The clients reside in independent policies, but are often running concurrently, for at least part of their active time. We have a duplication job we've set up as a vault profile to duplicate the images to tapes. The profile is currently being launched manually by an operator when they see both jobs have completed. I would like to automate this process, but can't find any verbose notes on bpend_notify.bat, which I think will do what I want? (P.S. - Windoze isn't my choice: I'm fairly familiar with batch files & not afraid of the CLI ;-) 2. Other backups are running and completing while the process above is transpiring. We've noticed that if all other jobs but the duplication process have completed, NetBackup will attempt to run a catalog backup. This results in a failure of the catalog backup with a "124" error which says the one of directories was not available for backup. My guess is it's one of the Master Servers catalog paths as it's still running the duplication process. Manually running the catalog after this scenario is always successful. If the duplication process and all other jobs have completed the catalog backup is always successful. Is there a way to have NetBackup treat the duplication step like a regular backup job so it will not attempt a catalog backup during the dup? I can't figure out why NB thinks the schema is quiesed when this process is still running? We could try to script it to run after the duplication process, but the duplication process wouldn't necessarily always be the last job to run (due to growth, we might have other backups still running after duplication has completed). Thank you, Kent C. Eagle Wilmington Trust Company Systems Engineer, MCP, MCSE Tech Services / SMSS [EMAIL PROTECTED] Visit our website at www.wilmingtontrust.com Investment products are not insured by the FDIC or any other governmental agency, are not deposits of or other obligations of or guaranteed by Wilmington Trust or any other bank or entity, and are subject to risks, including a possible loss of the principal amount invested. This e-mail and any files transmitted with it may contain confidential and/or proprietary information. It is intended solely for the use of the individual or entity who is the intended recipient. Unauthorized use of this information is prohibited. If you have received this in error, please contact the sender by replying to this message and delete this material from any system it may be on. ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-buì * The message is intended for the named addressee only and may not be disclosed to or used by anyone else, nor may it be copied in any way. The contents of this message and its attachments are confidential and may also be subject to legal privilege. If you are not the named addressee and/or have received this message in error, please advise us by e-mailing [EMAIL PROTECTED] and delete the message and any attachments without retaining any copies. Internet communications are not secure and COLT does not accept responsibility for this message, its contents nor responsibility for any viruses. No contracts can be created or varied on behalf of COLT Telecommunications, its subsidiaries or affiliates ("COLT") and any other party by email Communications unless expressly agreed in writing with such other party. Please note that incoming emails will be automatically scanned to eliminate potential viruses and unsolicited promotional emails. For more information refer to www.colt.net or contact us on +44(0)20 7390 3900. ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
[Veritas-bu] Duplication job killing NB Catalog job
Greetings, Windoze 2K3 Master & 2 Media servers, NetBackup 5.1MP3 SSO, ADIC I2000 fiber LTO2. I have 2 interrelated questions: 1. We have 2 clients being backed up to the same DSU. The clients reside in independent policies, but are often running concurrently, for at least part of their active time. We have a duplication job we've set up as a vault profile to duplicate the images to tapes. The profile is currently being launched manually by an operator when they see both jobs have completed. I would like to automate this process, but can't find any verbose notes on bpend_notify.bat, which I think will do what I want? (P.S. - Windoze isn't my choice: I'm fairly familiar with batch files & not afraid of the CLI ;-) 2. Other backups are running and completing while the process above is transpiring. We've noticed that if all other jobs but the duplication process have completed, NetBackup will attempt to run a catalog backup. This results in a failure of the catalog backup with a "124" error which says the one of directories was not available for backup. My guess is it's one of the Master Servers catalog paths as it's still running the duplication process. Manually running the catalog after this scenario is always successful. If the duplication process and all other jobs have completed the catalog backup is always successful. Is there a way to have NetBackup treat the duplication step like a regular backup job so it will not attempt a catalog backup during the dup? I can't figure out why NB thinks the schema is quiesed when this process is still running? We could try to script it to run after the duplication process, but the duplication process wouldn't necessarily always be the last job to run (due to growth, we might have other backups still running after duplication has completed). Thank you, Kent C. Eagle Wilmington Trust Company Systems Engineer, MCP, MCSE Tech Services / SMSS [EMAIL PROTECTED] Visit our website at www.wilmingtontrust.com Investment products are not insured by the FDIC or any other governmental agency, are not deposits of or other obligations of or guaranteed by Wilmington Trust or any other bank or entity, and are subject to risks, including a possible loss of the principal amount invested. This e-mail and any files transmitted with it may contain confidential and/or proprietary information. It is intended solely for the use of the individual or entity who is the intended recipient. Unauthorized use of this information is prohibited. If you have received this in error, please contact the sender by replying to this message and delete this material from any system it may be on. ___ Veritas-bu maillist - Veritas-bu@mailman.eng.auburn.edu http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu