[ https://issues.apache.org/jira/browse/YARN-6867?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Nathan Roberts reassigned YARN-6867: ------------------------------------ Assignee: Nathan Roberts > AbstractYarnScheduler reports the configured maximum resources, instead of > the actual, even after the configured waittime > ------------------------------------------------------------------------------------------------------------------------- > > Key: YARN-6867 > URL: https://issues.apache.org/jira/browse/YARN-6867 > Project: Hadoop YARN > Issue Type: Bug > Components: scheduler > Reporter: Muhammad Samir Khan > Assignee: Nathan Roberts > Attachments: YARN-6867.001.patch > > > AbstractYarnScheduler has a configured wait time during which it reports the > maximum resources from the configuration instead of the actual resources > available in the cluster. However, the first query after the wait time > expiration is responded by the configured maximum resources instead of the > actual maximum resources. This can result in a app submission to fail with an > InvalidResourceRequestException (will attach a unit test in the patch) since > the maximum resources reported by the RM is different than the one it sanity > checks against at app submission. -- This message was sent by Atlassian JIRA (v6.4.14#64029) --------------------------------------------------------------------- To unsubscribe, e-mail: yarn-issues-unsubscr...@hadoop.apache.org For additional commands, e-mail: yarn-issues-h...@hadoop.apache.org