Yes some do that.. once it is sold , it's out our hands...oh well
Jaime Solorza
On Fri, Mar 23, 2018, 6:58 AM Mark Radabaugh wrote:
> That’s the way an industrial panel should look. I would reject any panel
> that came in with wire ties bundling cable rather than duct. If anything I
> might h
That’s the way an industrial panel should look. I would reject any panel that
came in with wire ties bundling cable rather than duct. If anything I might
have added another horizontal run above the PULS UPS.
Control panels always end up with changes in the field. With wire ties the
first cha
Thankslots of planning goes into these enclosures before we execute. I
have shown you bare back board to completed non landed panel.. I will share
in the field connections ...there are videos on line to help with building
these. I have learned allot from Vernon...I have seen him eat engineer
I like porn far more than is healthy...
On 3/14/18 1:16 PM, Jaime Solorza wrote:
Tested and certifiedyay us
Jaime Solorza