One way to handle this is to create a sub-workflow within a workflow.
In the first workflow, set completion to automatic completion and set approval
to the Manager.
Then in the second one, set proper completion step and proper approval (if
required).
Apart from this, you will require
Hi all,
Have anyone ever encountered this error message when running master planning:
Could not acquire lock on scheduling engine ??
I wonder why does this error showed up. I'm running master planning using batch
helper. i'm getting this error quite often, but i don't know where the fault
Hi all,
Could anyone explained this error to me:
Could not acquire lock on scheduling engine. I'm getting this error when
running master planning..
Is there a table which i must unlock manually to run master planning? please
give me your thought. I will appreciate it. Thanks
Regards
Henry
Open label editor - paste the error message - find label id - search for the
label id in AOT.
Finite scheduling must be run in parallel. (Master planning engine has been
optimized to block other scheduling threads for as minimum time as possible).
In your case it looks like one of the threads
4 matches
Mail list logo