Hello;
I have to create a cube for current and history data. Should i have 2
databases; one that holds the history and the other that holds the current
data; so in Ax via cubes the history data or the current data can be
accessed.
Can anyone propose a solution.
Thanking you in advance
[Non-tex
Hi there
You can use a view; simply drag the tables that are required for the
report to the datasouce of the view; and under the node fields create the
fields that you require.
Once that is done you can drag the view to the datasource of the report and
from there create your report and sorting, ra
Hi there;
Im not sure what you mean by multiple reports; Are these reports different
from each other?
Well any which way; on the report design that you are creating you can use
programmable section (to create design and output of information of each
report) and use the element.newpage() comand so
Hi
Instead of setting the property of resize automatically to yes Rather give
the logo a width and height in the property sheet; im sure that'll work.
On 5/17/07, chamindakothalawala <[EMAIL PROTECTED]> wrote:
>
> Hi Group,
>
> I will try to save my customized report in PDF format.
> But the p
Hi there;
I had the similar struggle last week. And i posted it; and had helpful
response.
Go to your datasouce and click properties; in the property sheet set the
ordermode to Group by, MorpX will retrieve a single record for each group
BASED on the sorting fields.
Or you can use the followin
5 matches
Mail list logo