i belive the production parameter - general tab - job scheduling - maximum job leadtime has something to do with your problem. please check that in your env.Hardi [EMAIL PROTECTED] wrote: Dear all,I have setup for Production Route, consisting of Primary and Secondary operations.For each
Production time exceeds the capacity planned time... Check for the field
in production parameters... you will see the 1000 entered...to verify
reduce the quantity and start
Raj
On Mon, 28 Nov 2005 15:46:47 +0530, Hardi [EMAIL PROTECTED] wrote :
Dear all,
I have setup for Production
Hi Hardi,
Increase your maximum job lead time at Production parameter. Your scheduled job hoursin the route exceeds the maximum job lead time.
Regards,
Sun Fen
On 28 Nov 2005 15:53:42 -, Realname [EMAIL PROTECTED] wrote:
Production time exceeds the capacity planned time... Check for the