On Sun, 2011-10-02 at 11:45 +0200, Radosław Korzeniewski wrote:
Hello,
2011/9/30 reaper bacula-fo...@backupcentral.com
sounds like your sysctl.conf needs tweaking? have you tried
something like this on both sides?
kernel.msgmnb = 65536
Hello. I have problem with this.
Job {
Name = Flows
Client = prodisz-fd
JobDefs = FlowsJob
Max Wait Time = 3h
}
It's should cause canceling job if job flows stuck for more than 3h (for eg. if
no volume).
But... backup id canceled if previous backup is running for long time and flows
Hi,
I have about 30 jobs scheduled at 00:00 at priority 10
I have 1 job scheduled at 02:00 at priority 9
Maximum Concurrent Jobs = 3
Allow Mixed Priority = yes (in JobDefs)
My intention was to get this priority 9 job as close as it is
possible to 02:00.
But with my recent configuration it
On 10/03/11 08:38, Piotr Lemiesz wrote:
Hi,
I have about 30 jobs scheduled at 00:00 at priority 10
I have 1 job scheduled at 02:00 at priority 9
Maximum Concurrent Jobs = 3
Allow Mixed Priority = yes (in JobDefs)
My intention was to get this priority 9 job as close as it is
Le 03/10/2011 16:05, Phil Stracchino a crit:
On 10/03/11 08:38, Piotr Lemiesz wrote:
Hi,
I have about 30 jobs scheduled at 00:00 at priority 10
I have 1 job scheduled at 02:00 at priority 9
Maximum Concurrent Jobs = 3
Allow Mixed Priority = yes
On Mon, 2011-10-03 at 10:34 +0200, mayak-cq wrote:
snip
zurich and copenhagen are 22.589 ms apart on a shared 100mbit
connection -- using the bandwidth delay product:
theoretical
bandwidth delayproductBits bitsPerByte
bytesInWindow
500 000 000 * .022589 = 11 294
Hi all,
I am sitting here waiting for a job to finish despooling to tape. I
have just mounted another tape due to the previous tape running out.
The job says that it had terminated and I was waiting for the next job
to start. I thought maybe I forgot to mount the new tape. So, I
mounted