Hi, I've no doubt I will be referred to some part of the manual that I missed ;). But I have had a problem for some time now and done nothing about it..... If a job takes long enough to cause subsequent job(s) to fail with start wait time exceeded. (Fatal error: Job cancelled because max start time exceeded) All jobs thus failed are upgraded to a Full! Which for me means that when a certain (large) machine chooses to do its full backup it causes a chain-reaction of subsequent systems doing full backups.
I do however still want a full backup following a genuine failed backup (a backup that failed after being started that is!). I have "Rerun Failed Levels" set to Yes. Can anyone confirm how to stop the upgrading on exceeding start-time happening Many Thanks Andrew R Paterson ------------------------------------------------------------------------- This SF.net email is sponsored by: Microsoft Defy all challenges. Microsoft(R) Visual Studio 2005. http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/ _______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users