On Sat, 2011-07-09 at 19:18 -0400, Dan Langille wrote:
> On Jul 9, 2011, at 4:03 PM, Craig White wrote:
>
> > Doesn't appear to be possible from a read thru of the documentation.
> >
> > I have a lot of jobs that are scheduled and running nightly.
> >
> > Now, we want to have another job with ne
On Jul 9, 2011, at 4:03 PM, Craig White wrote:
> Doesn't appear to be possible from a read thru of the documentation.
>
> I have a lot of jobs that are scheduled and running nightly.
>
> Now, we want to have another job with new pools that will be taken
> off-site on a weekly basis.
Are these i
Doesn't appear to be possible from a read thru of the documentation.
I have a lot of jobs that are scheduled and running nightly.
Now, we want to have another job with new pools that will be taken
off-site on a weekly basis.
I can see that I can only have 1 schedule and 1 bootstrap file for each