Troy Daniels wrote:
Hi,
I want to make sure that after the last scheduled job for the day
runs, that the mounted tape is changed to a status of 'used'. How
can I run a job to do this?
You can try using any one of the following options:
Maximum Volume Jobs = positive-integer
Volume
I want to make sure that after the last scheduled job for the day runs,
that the mounted tape is changed to a status of 'used'. How can I run a
job to do this?
Thanks
brian
-
This SF.net email is sponsored by: Splunk Inc.
Hi,
I want to make sure that after the last scheduled job for the day runs,
that the mounted tape is changed to a status of 'used'. How can I run a
job to do this?
You can try using any one of the following options:
Maximum Volume Jobs = positive-integer
Volume Use Duration =